Loading...
HomeMy WebLinkAboutSUB201900049 Bond Estimates 2020-02-10Project Name: UVA Reseach Park Loop Road, Road Plan SUB201900049 /WP0201900021 Plan #: SUB201900049 TMP(s): 03200-00-00-006R0, 03200-00-00-018005 03200-00-00-018BO Date Estimate complete: 2/10/20 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Road Name: Loop Road (private) Begin station 10+00.00 End station 21+42.07 aggregate base 8.0 in d blotted or prime&double seal asphalt base (2" 1M-9.OA; 4" BM-25.OD; Ci 1) 6.0 in d asphalt surface 1.5 in d Loop Road, Entry, wB Begin station 10+00.00 Innovation Drive End station 10+86.." to begin westbound aggregate base 8.0 in d 105' taper (16' to 14') blotted or prime&double seal asphalt base (2" 1M-9.OA; 4" BM-25.OD; Ci i) 6.0 in d asphalt surface Ol" 1.5 in d Loop Road, Entry, wB Begin station 10+86.00 Sta. 10+86 (±) End station 11+91.00 to end westbound aggregate base 8.0 in d 105' taper (14' FC/CL) blotted or prime&double seal incl. 6' wide striped pavement asphalt base (2" 1M-9.OA; 4" sM-25.01); C1.1) 6.0 in d median taper to 0' asphalt surface 1.5 in d Loop Road, Entry, wB Begin station 11+91.00 Sta. 11+91(±) to End station 13+30.64 Int. Loop Road (private) aggregate base 8.0 in d (14' pvmnt width FC/CL) blotted or prime&double seal asphalt base (2" 1M-9.OA; 4" BM-25.OD; Ci i) 1 6.0 in d asphalt surface 1.5 in d Loop Road, Entry, EB Begin station 10+00.r Innovation Drive End station 11+39.00d to begin EBL 2-lane aggregate base 8. in d to 1-1ane transition blotted or prime&double seal (24' FC/Median FC) asphalt base (2" iM-9.OA; 4" sM-25.on; CLI) in d asphalt surface 1. in d Loop Road, Entry Begin station 11+39.001 Eastbound End station 12+39.00 transition to I lane aggregate base 8.0 in d (24' FC/Median -to- 14' FC/CL) blotted or prime&double seal asphalt base (2" 1M-9.OA; 4" BM-25.OD; s1.1) 6.0 in d asphalt surface 1.5 in d Loop Road, Entry lBegin station 12+39.00 No. Unit Unit Cost Cost installed compete cost remaining road length 1142.1 ft 1142.1 ft L ft W 1332.4 ton $35.00 $46,634.53 0% $46,634.53 ft Lft W 0.0 sy $10.00 $0.00 0% $0.00 k.0 1142.1 ft L.0 ft W 839.4 tons $120.00 $100,730.57 0% $100,730.57 1142.1ft L.0 ft W 209.9 tons $140.00 $29,379.75 0% $29,379.75 road length 86.0 ft 86.0 ft L FW1.0 ft W 84.3 ton $35.00 $2,949.80 0% $2,949.80 ft L ft W 0.0 sy $10.00 $0.00 0% $0.00 86.0 ft L ft W 50.6 tons $120.00 $6,068.16 0% $6,068.16 86.0 ft L *6.0 6.0 ft W 12.6 tons $140.00 $1,769.88 0% $1,769.88 road length 105.0 ft 105.0 ft L 20.5 ft W Ave. width 100.5 ton $35.00 $3,515.75 0% $3,515.75 ft L ft W Ave. width 0.0 sy $10.00 $0.00 0% $0.00 105.0 ft L ft W Ave. width 69.5 tons $120.00 $8,334.90 0% $8,334.90 �8.0 105.0 ft L 8.0 ft W Ave. width 17.4 tons $140.00 $2,431.01 0% $2,431.01 road length 139.6 ft 139.6 ft L 16.5 It W 107.5 ton $35.00 $3,763.30 0% $3,763.30 It L It W 0.0 sy $10.00 $0.00 0% $0.00 139.6 ft L 14.0 It W 71.8 tons $120.00 $8,621.37 0% $8,621.37 139.6 ft L , 14.0 ft W 18.0 tons $140.00 $2,514.57 0% $2,514.57 road length 139.0 ft 139.0 ft L 27.0 ft W 175.1 ton $35.00 $6,129.90 0% $6,129.90 ft L ft W 0.0 sy $10.00 $0.00 0% $0.00 139.0 ft L 4.0 ft W 122.6 tons $120.00 $14,711.76 0% $14,711.76 139.0 ft L 24.0 ft W 30.6 tons $140.00 $4,290.93 0% $4,290.93 road length 100.0 ft 100.0 ft L 21.5 ft W Ave. width 100.3 ton $35.00 $3,511.67 0% $3,511.67 ft L ft W Ave. width 0.0 sy $10.00 $0.00 0% $0.00 100.0 It L 19.0 ft W Ave. width 69.8 tons $120.00 $8,379.00 0% $8,379.00 100.0 It L 19.0 ft W Ave. width 17.5 tons $140.00 $2,443.88 0% $2,443.88 irk\I-drive offload 102519 JO DO to cloud\anderson\040918_bonds\estimates\SUB201900049 UVA Research Park Loop Road,_RP_bond_est-021020.xlsx 2/10/2020 Project Name: UVA Reseach Park Loop Road, Road Plan SUB201900049 /WP0201900021 Plan #: SUB201900049 TMP(s): 03200-00-00-006R0, 03200-00-00-018005 03200-00-00-018BO Date Estimate complete: 2/10/20 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Road Name: Loop Road (private) Eastbound End station 13+30.64.j road length 91.6 ft Sta. 12+39 (±) to aggregate base 8. in d 91.6 ft L 16.5 ft W Int. Loop Road (private) blotted or prime&double seal ftL ft W (14' pvmnt width FC/CL) asphalt base (2" IM-9.0A; 4" BM-25.WJ; s l l) 6.0 in d 91.6 ft L 14.0 ft W I asphalt surface 1.5 in d 91.6 ft L 14.0 ft W Loop Road, right-angle Begin station 00+01.0M Int. radius pvmt End station 00+02.00j road length 1.0 ft aggregate base 8.0 in d 1.0 ft L r 2146.0 ft W blotted or prime&double seal 1.0 ft L I ft W asphalt base (2" IM-9.0A; 4" an4-25.013; CLI) 0 6.0 in d 1.0 ft L 2146.0 ft W asphalt surface 1.5 in d 1.0 ft L 2146.0 ft W Innovation Drive Begin station 00+00.00 ( Mill /pave) End station 01+46.00 road length 146.0 ft aggregate base 0.0 in d 146.0 ftL blotted or prime&double seal ft LlftW ft W asphalt base 0.0 in d 146.0 ft Lft W asphalt surface (2" SM-9.5A) 2.0 in d 146.0 ft Lft W curb CG-2 curb CG-6 underdrain, UD-4 sidewalk, concrete (6) - Loop Rd. Entry, then Loop Rd. east side, + 660, west side ramp CG-12 street name sign traffic control sign (stop, No parking, speed limit) Street Landscape Each guardrail ES @ 3000 drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) EC-0 pipe, rcp, cmp (12") 12.0 in d 0 ES-1,JEW pipe, rcp, cmp (15 to 48") 15.0 in d 0 ES-1,EC-1 pipe, rcp, cmp (15 to 48") 18.0 in d 0 ES-1,EC-1 pipe, rcp, cmp (60 to 108") 96.0 in d �2.0 0 ES-1,EC-1 rip -rap, placed ft d 0.0 ft L matting, EC-2 or 3 0.0 ft L clear and grub (for wooded sites) ; match sec. rnn 2944.0 ft L cut grading cut locations: Entry, sta. 12+50-13+00 (3'); Loop (Pvt.): 10+00-10+75 (3'); 13+00-18+00 (2');20+25-21+25(3') fill grading fill locations: Entry, sta. 10+50-12+50 (-6'); Loop (Pvt.): 11+00-13+00(2'); 18+25-20+25 (2') as -built drawings (1k+ price per 0.1 mi.) 1472.7 ft L 0.27892 mi. survey and layout (price per 0.1 mi.) 1472.7 ft L 0.27892 mi. No. Unit Unit Cost Cost installed % compete cost remaining 70.6 ton $35.00 $2,469.70 0% $2,469.70 0.0 sy $10.00 $0.00 0% $0.00 47.1 tons $120.00 $5,657.85 0% $5,657.85 11.8 tons $140.00 $1,650.21 0% $1,650.21 100.1 ton $35.00 $3,505.13 0% $3,505.13 0.0 sy $10.00 $0.00 0% $0.00 78.9 tons $120.00 $9,463.86 0% $9,463.86 19.7 tons $140.00 $2,760.29 0% $2,760.29 0.0 ton $35.00 $0.00 0% $0.00 0.0 sy $10.00 $0.00 0% $0.00 0.0 tons $120.00 $0.00 0% $0.00 21.5 tons $140.00 $3,004.68 0% $3,004.68 0.0 ft $16.00 $0.00 0% $0.00 2946.0 ft $19.00 $55,974.00 0% $55,974.00 2946.0 ft $6.00 $17,676.00 0% $17,676.00 2135.0 ft $25.00 $53,375.00 0% $53,375.00 8 each $350.00 $2,800.00 0% $2,800.00 1 each $200.00 $200.00 0% $200.00 20 each $200.00 $4,000.00 0% $4,000.00 59 each $150.00 $8,850.00 0% $8,850.00 --M ft $17.00 $408.00 0% $408.00 10 each $3,500.00 $35,000.00 0% $35,000.00 0 each $500.00 $0.00 0% $0.00 44 ft $450.00 $19,800.00 0% $19,800.00 0.0 ft $25.00 $0.00 0% $0.00 553.0 ft $35.00 $19,355.00 0% $19,355.00 345.0 ft $40.00 $14,800.00 0% $14,800.00 OAR $320.00 $0.00 0% $0.00 0.0 ton $60.00 $0.00 0% $0.00 0.0 sy $2.00 $0.00 0% $0.00 4.6 acre $24,000.00 $111,596.25 0% $111,596.25 -cy $6.00 $29,302.20 0% $29,302.20 -cy $12.00 $84,624.00 0% $84,624.00 31sum $2,000.00 $7,000.00 0% $7,000.00 31sum $2,000.00 $7,000.00 0% $7,000.00 irk\I-drive offload 102519 JO DO to cloud\anderson\040918_bonds\estimates\SUB201900049 UVA Research Park Loop Road,_RP_bond_est-021020.xlsx 2/10/2020 Project Name: UVA Reseach Park Loop Road, Road Plan SUB201900049 /WP0201900021 Plan M SUB201900049 TMP(s): 03200-00-00-006110, 03200-00-00-018003 03200-00-00-018BO Date Estimate complete: 2/10/20 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item No. Unit Unit Cost Cost (installed) % compete cost remaining Road Name: Loop Road (private) mobilization 1 Isum $5,000.00 $5,000.00 0% $5,000.00 materials testing 1472.7 ft L 2.94542 inc of 500' 4 each $200.00 $800.00 0% $800.00 compaction testing 1472.7 ft L 2.94542 inc of 500' 4 each $200.00 $800.00 0% $800.00 CBR tests (1 every 0.1 mi. per road) 1472.7 ft L 2.94542 inc of 500' 4 each $200.00 $800.00 0% $800.00 stone depth inspections 1472.7 ft L 2.94542 inc of 500' 4 each $200.00 $800.00 0% $800.00 pavement inspections 1472.7 ft L 2.94542 inc of 500' 4 each $200.00 $800.00 0% $800.00 pipe and drainage video inspections ($500 min) 898 ft $1.00 $898.00 0% $898.00 VDOT surety (1 lane) 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 VDOT maintenance fee (1 In rd, 1 yr) 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 0% $0.00 VDOT admin. Cost recovery fee(1 lane) 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 0% $0.00 cost sum $766,350.90 $766,350.90 SUB201900049 UVA Research Park Loop Road,_RP_bond_est-021020 contingency $76,635.09 $76,635.09 Total $842,990 $842,990 irk\kdrive offload 102519 JO DO to cloud\anderson\040918_bonds\estimates\SUB201900049 UVA Research Park Loop Road,_RP_bond_est-021020.xlsx 2/10/2020