Loading...
HomeMy WebLinkAboutARB201900149 Plan - Revision Initial Site Plan 2019-11-13Nr V./ BALZER & ASSOCIATES PLANNERS/ARCHITECTS ENGINEERS / SURVEYORS 1561 Commerce Road Suite 401 Verona, VA 24482 540.248.3220 www.balzer.cc Roanoke Richmond New River Valley Staunton Harrisonburg Lynchburg October 291, 2019 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: ARB Cover Letter Office Parking Relocation Balzer Project No: 34180014.01 6181 Rockfish Gap Turnpike, LLC. is proposing the relocation of the existing parking from the front of the existing building to the rear of the building. This plan is an amendment to the approved site plan SDP2011-55. The site development plan calls for 12 parking spaces including 2 accessible parking spaces serving the existing building. This new parking lot will be connected to the existing access driveway between 6181 and 6185 Rockfish Gap Turnpike. The proposed site improvements are informed by the existing grade. Minimal cut and fill operations will be performed as required to achieve proper slopes. This relocation of parking will bring the current parcel up to Zoning and ARB compliance as it was previously a grandfathered site that did not meet compliance. Additionally, some of the front landscaping previously approved in SDP2011-55 and SDP1990-57 were never installed and are now shown in this amendment as proposed in order to bring this plan back into compliance with previously approved plans. Please do not hesitate to call with any questions. Respectfully, iom /.'* D. Kent O'Donohue Jr., LA Associate dodonohue(&balzer. cc -sue_. •- �.._,.� :-� _� r..: ¢¢ 11 a. .'fv oll CON C -P4RL f ��