Loading...
HomeMy WebLinkAboutARB201900149 Review Comments 2019-12-27n County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972- 4126 Memorandu M To: Kent O'Donohue (dodonohue(a)-blazer.cc) From: Paty Saternye, Senior Planner Division: Planning Date: May 20, 2019 Rev. 1: December 27, 2019 Subject: SDP 201900018 6181 Rockfish Gab Turnpike New Office Expansion — Major Site Plan Amendment The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): (Each comment is preceded by the applicable reference, which is to the Subdivision/ZoningOrdinances unless otherwise specified.] 1. Pay the required notices fee of $215. Rev, 1: Comment not yet. addressed. Address the comment. Coordinated to client to be paid. 13. [32.5,2(p) & 32.7.9] Address the following in reference to the landscape plan: j) Under "Landscape Ordinance Requirements", next to "Parking Screening", it states "None, Parking is Behind Building". This is incorrect since parking must be screened also from the RA parcels. Revise this and ensure the required screening is provided. See comments above on screening. Rev. 1: Comment not yet fully addressed. Add additional parking screening along the southern edge of the parking lot, to screen it from the Rural Area zoned parcel. Although screening is proposed closer to the property line, that screen is a significant',distance from the parking lot and therefore the 18" (at time of planting) shrubs along the properties edge will not have any screening affect on the parking lot for many years. Screening added to south side of parking. k) Revise the landscape schedule to show the canopy provided for each tree species, both individually and when multiplied by the quantity. Also, include at the bottom of the chart the total canopy provided for all proposed plantings. Please note, most shrubs do not provide canopy coverage. See the attached canopy reference document for more information, and ensure you utilize the canopy specified based on the caliper at time of planting. Since larger caliper trees are being provided to meet ARB requirements they provide more canopy coverage than the smaller caliper trees. Rev. 1: Comment not yet fully addressed. The landscape schedule was revised with all information requested. However, the "canopy" specified for the individual trees Page 1 of 2 should be at 10 years of growth. The canopies specified appear to be much smaller what is to be expected after 10 years. Please revise the canopy numbers, calculations and total. Canopy was based on size when planted. Has been updated to 10-yr size based on caliper at time of planting and updated with new quantities. 1) Revise the canopy calculation for "provided" to include the proposed trees. Rev. 1: Comment not yet fully addressed. Revise the calculation again, after the canopy values are updated in the chart as specified above. Updated. m) Rev. 1: [New Comment] Ensure that all previously approved landscaping along the road frontage is provided. Address the following: i. Label all three of the previously approved existing White Pines. It appears that they ma" exist. Nit their location is not sperified Per conversations, all type and size of existing trees shown in front of property to show compliance and that three pines exist. ii. Label all of the previously approved existino (nr renlaced) azaleas at the side and the front of the building. Per conversations, notes added for clarity. Existing side azaleas added. There are no existing azaleas located in the front. Label added for owner to replace side azaleas with new at their own discretion or use existing. n) Rev. 1: [New Comment] Provide dumpster screening on the south side of the dumpster. Dumpster screening extended. 15. [Comment] See the attached comments from the other SRC reviewers. Rev. 1: Comment not yet fully addressed. See the attached comments from the other SRC reviewers. Addressed. 16, Pr— I - [New Comment] Revise the coversheet so that ", VA" is after "Albemarle County". Added. i r. Rev. 1: [New Comment] Revise the scale bar on sheet C4.0. It does not match the scale of the drawing on N/A per conversation. Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be found under "Departments" at Albemarle.org. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. Please contact Paty Saternye in the Planning Division by using psaternve(a-)albemarle.org or 434-296-5832 ext. 3250 for further information. Page 2 of 2 Review Comments for SDP201900018 Project Name:IROCKFISH GAP TU FFICE PARKING RELOCATION - MINOR Date Completed:[Tuesday,November 26,2019 Reviewer, IMargaret Malszewski Department/Division/Agency: Review Status: (Requested Changes 1. Large shade trees are required at 40' on center around the full perimeter of the parking lot. Per discussions perimeter trees added with 40' minimum spacing. 2 The Hornbeams appear to be too close to the Red Maples at the west end of the proposed parking lot. Adjust the location/spacing. Spaced hornbeams more from maples. a Glabra "Nigras" increased to 24" along with a mix of Glabra "Shamrock" to diversify the south side of the parking. 4. Identify mu tlueei ) ud the iioiaitsasl t;fumei o; Ulu P y.: a k)arklng lot,si,t-vvnwithin tii� C teopy CAE iti. p.4,,jsed Linden. IS sufficient space provided for mature growth of both? Per discussions random circle was not a tree and has been deleted. Page: 11 County of Albemarle Printed On:j 1211912019 Project Name:IRU� ,r.I ivr, -A� i Ui—iNi ir, r r ii. t H,icrJ,4u r, i .A ir€ fi )i``v MINOR Date Completed:rruesday ,November 26,2019 Department/Division/Agency: ReviewerlEmily Cox Iv COD Engineering Iv - ng sho, Sidewalk adjusted to 6' and reflected in plans. �Review Status: (Requested Changes 2) Ctormwater calculations provided must be part of the approved plan and should have a signed professional seal. SWM Report resubmitted with wet seal on cover. Page: 11 County of Albemarle Printed On:f 12119VO19