Loading...
HomeMy WebLinkAboutWPO201900002 Checklist - Project Closeout (Administrative)WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form '.�'�o- �` and/or bond release; place the completed form in the WPO folder and forward oth I mag project Center fortetion digital closeout into LaserFiche. Once items have been placed in LaserFiche, Imaging Center staff will forward to Centralized Filing. WPO# '2_D l 91 - cC O 2 VESCP PROJECT TITLE S f �e ' ' (rt FULL NAME INSPECTOR:Joncw _FINAL AC O ATE: 2 ---- ----------------------------------------------------------------------- ------------------------------------------------------------------------ ----------- _-_ ❑ Status/Status Date undated ------------------------------------------------------------ - - -- ----------------------------------------------- Hardco - - — -- ----- ----- - - -- - -- - - -- - ----------------- py — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order (latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed necessary to Provide clarity to the file, please indicate that item on the "Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name) of the document in the space provided. Precon2piction Meeting Form Scan ❑ Saved location ❑ Grading Permit ❑ Scan ❑ Saved location ❑ Inspection Requests ❑ Scan ❑ Saved location ❑ Inspection Results (Include any inspection tickets, memos, photos, etc.) ❑ Scan ❑ Saved location P.--Bond Re ctionBond Release Notices from Inspector to Management Analyst Scan ❑ Saved location ❑ Conservation Checklist ❑ Scan ❑ Saved location ❑ As -built /Construction Plans ❑ Scan '^ (P ase explain) "er Scan 101 Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location NOTES: WPO proiect folders Will hn ---r---- .., •..� •auugmg %-enter when the following items are complete: 1) Checklist is completed and included in folder; Z) Documents are Acco-fastened (except plats/plans), and in chronological order (latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete, Imaging Center staff will circle the incomplete item and return folder to the County Engineer for corrective action. Draft 12-5-2013