HomeMy WebLinkAboutWPO201900002 VSMP SWPPP 2019-01-167
SITE DATA
PLAN PREPARER:
TAX MAP PARCEL No:
ZONING:
CURRENT USE:
PROPOSED USE:
PROJECT AREA:
TOPOGRAPHY:
GENERAL NOTE.
■
ROUDABUSH, GALE, & ASSOCIATES INC
172 SOUTH PANTOPS DR. STE A
CHARLOTTESVILLE, VA. 22911
(434)-979-8121
46B 4-4
Cl-COMMERCIAL
VACANT COMMERCIAL LOT
OFFSITE LAY DOWN AREA FOR MATERIALS AND STOCKPILE UNTIL COMPLETION OF
HOLLYMEAD DAM SPILLWAY IMPROVEMENTS (WP0201900002)
3.41 ACRES
ALBEMARLE COUNTY GIS 4FT
THE PURPOSE OF THIS OF THIS PLAN IS TO PROVIDE A LAY DOWN AREA WITH ADEQUATE
SPACE FOR CONSTRUCTION MATERIALS AND STOCKPILING OF. EXCESS TOPSOIL GENERATED FROM
THE PROJECT KNOWN AS HOLLYMEAD DAM SPILLWAY IMPROVEMENTS WPO201800039 APPROVED
BY ALBEMARLE COUNTY ON 06129118. THIS AREA IS NOT TO BE USED FOR INTENTIONAL LAND
DISTURBANCE AND WILL BE RESTORED TO ITS EXISTING ORIGINAL STATE UPON COMPLETION OF
THE PROJECT. CONTRACTOR SHALL USE ONSITE SEEDING AS NECESSARY TO RESTORE ANY LOSS
OF STABILIZATION FOR THE DURATION THIS OFFSITE PARCEL IS BEING USED AND THE
HOLLYMEAD DAM SPILLWAY IMPROVEMENTS ARE DEEMED COMPLETE.
(WPC:)20.1 900002)
ALBEMARLE COUNTY, VI RCS I N IA
VICINITY MAP
SCALE; 1 "=1000 FEET
SHEET INDEX
SHEET 1--------- COVER SHEET
SHEET 2--------- SWPPP
SHEET 3--------- SWPPP NOTES & DETAILS
NEW
A
0
w
in
cn
Q
m
z
jo
U � y
JIVI L. TAGGART
Lic. No.
22841 kid
°.� 01-16-19 l
il/..�SS 10 N AL IoG
z
w
W
CL
O J
0 W
uj
0. g
�N Z Z
L)
4Lu
T" 0
� cm 0 0
tl) ® V
iL O.
C9 W o.
CL
LLJ
J cl)
o LL
DATE:
1 01-16-2019
SCALE:
AS SHOWN
JOB:
8053
CONTOUR INTERVAL: N/A
DESIGN BY:
JLF
SEALED BY:
JLT
SHEET: 01 OF O3
t
1
/
/
/
/
1
032A0-02-00-00100
IMP
i
MALLOY PROPERTIES
\\
LLC C/O MALLOY \
COMPANIES LLC `\\
TMP 032AO-02-00-001BO
i
i
SOUTHERN STATES
l `�\
DB 4851 PG 460
CHARLOTTESVILLE
/
COOPERATIVE INC
!
DB 1961 PG 246
p (Sr'4TERp ROAD
/ / t / �� _ GHT_OF wA Y �\ /
,`C` i /-----------
/ / ! °� NOTE:
t / �O AREA SHOWN WITHIN SILT FENCE IS 1 ACRE. TMPI a MIN U.0_ \
THIS SITE SHALL ONLY BE USED AS A MATERIAL I r + 04684-00-00-004 a
AYDOWN AREA AND A TEMPORARY STOCKPILE
0�5
L
/ E CESS TOPSOIL GENERATED FROM IA-ZAN LIMITED
r
VIA
FX
WP0201800039. SEE STOCKPILE AGREEMENT ON I r 9-
SHEET 4 OF 4 FOR ADDITIONAL DETAILS.
PARTN~�
DB
TMP 03200-00-00-037CO t l r r \ r
WGN PROFFITT LLC C/O
WALGREEN CO REAL ESTATE t l l 1 O
SF
TAX DEP
DB 3790 PG 692 tt l i tl
t t / r STAGING
AREA
CE
TS
r r
r
/,��-PS
�SQ�? // / / '! TMP 03200-00-00-037C1 ��i /''// /''�' DC
MERCER, MARY R &
GEORGE R MERCER SR
/ 5 G�' l tNN
TR,
/ I / P�' QP • / ;
AGE
/ ! n / r r
~ � /''/ /, \ �~• ~., '�yt�' '''''' STOCKPILE
\ ,� { .' AREA /
3,
/NIIN
/ / + ____ __ __ "I // ; % ____ -----__ SILT FENCE SHALL It
/ / �' j - ----- A PROPERTY LINE
/ ! - - -� ,••3 z�6,___ � \ \�.. / r,' i /-_____--- SF APPROX. 10' FROM THE EDGE OF
PAVEMENT AND/OR PROP N
l
TMP 046B4-00-00-00300
JA-ZAN LIMITED
PARTNERSHIP
DB 1169 PG 347
NOTE
NOT ALL SWPPP MEASURES SHOWN HEREON MAY BE REQUIRED FOR THE
PROJECT AND LOCATION OF MEASURES MAY VARY DEPENDING ON SITE
CONDITIONS. THIS PLAN IS FOR ILLUSTRATIVE PURPOSES AND SHALL BE
MAINTAINED BY THE CONTRACTOR AS NECESSARY. THIS PLAN SHALL BE
AN EXTENSION OF THE EXISTING SWPPP FOR HOLLYMEAD DAM SPILLWAY
IMPROVEMENTS WPO201800039.
MP 046B4-00-00-00500
-TCHEL, ROBERT G OR
KATHLEEN 0
DB 1685 PG 014
/ I
WASH RACK ("WR") SHALL BE INSTALLED IN TMP 03200-00-00-036G0
ACCORDANCE WITH THE CONSTRUCTION ENTRANCE AND LIGHTHOUSE WORSHIP
SLOPE TO A TEMPORARY DRAIN PIT AS DEEMED CENTER INC
NECESSARY BY ALBEMARLE COUNTY EROSION INSPECTOR DB 2664 PG 033
WATER TANK WITH (2) POWI
WASHERS SHALL BE STORED 0
AT THE CONSTRUCTION ENTRA
r'
1
/
1
t
TMP 032
LIGHTHC
CE
DB
I
!
r
/
/
/
\
/
/
/
1
t
t
SCALE 1 "=50'
50 0 50 100
SCALE IN FEET I
U a
0
O
U
"W =
T
cn
Nm
N Q
Z� QzZ)
O � z (5
V o Q^ >O
O OU JWZ
C4 ® Q� cn wWw
ro
o J 0
Q
J � N
O 2 v c°'v
co
Lu
-j 0 LL
co 0 ] wi
C cccr, C)o0
aLu 1—z9
W���
Z � CO
T W
Z
®W 0
� G
O
F
U
W
W
Q
W
m
Z
�.LTH OF Dry'
o G'
JIMMY- L. TAGGART
Lic. No.
22841 �v4
01-16-19
�s`�I ONAL z,_
DATE:
1 01-16-2019
SCALE:
AS SHOWN
JOB:
8053
_
CONTOUR INTERVAL:4 FT
DESIGN BY:
I JLF
SEALED BY:
JJLT
SHEET: 02 OF 03
®�
PURPOSE
4VAC50-60-54 of the Virginia Stormwater Management Program (VSMP) Permit
Regulations requires that Stormwater Pollution Prevention Plan (SWPPP) be developed
for all regulated land disturbing activities, The SWPPP must include, but not be limited
to, an approved erosion and sediment control plan, an approved stormwater
management plan, and this Pollution Prevention Plan (PPP) for regulated land
disturbing activities, and a description of any additional control measures necessary to
address a TMDL as applicable.
The plan for implementing pollution prevention measures during construction activities
developed on this sheet must be implemented and updated as necessary. Any PPP
requirements not included on this sheet must be incorporated into the SWPPP required
by 4VAC50-60-54 that must be developed before Land disturbance commences. This
PPP identifies potential sources of pollutants that may reasonable be expected to affect
the quality stormwater discharges from the construction site (both on- and off -site
activities) and describes control measures that will be used to minimize pollutants in
stormwater discharges from the construction site.
OTHER REFERENCED PLANS
SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All
plans incorporated by reference become enforceable under the VSMP Permit
Regulations and General Permit VAR10 for Discharges of Stormwater from
Construction Activities. If a plan incorporated by reference does not contain all of the .
required elements of the PPP, the operator must develop the missing elements and
include them in the SWPPP.
POTENTIAL POLLUTANT SOURCES
The following sources of potential pollutants must be addressed in the Pollution
Prevention Plan. Various controls and/or measures designed to prevent and/or
minimize pollutants in stormwater discharges from the project site must be applied to
the sources found on the site. Additional information concerning the following controls
and/or measures may be found in the SWPPP. Deviations from the location criteria
may be approved by the Albemarle County Inspector.
LEAKS, SPILLS, AND OTHER RELEASES
✓ The operator(s) shall ensure procedures are in place to prevent and respond to all
leaks, spills and other releases of pollutants.
✓ The operator(s) shall ensure all leaks, spills and other releases of pollutant are
contained and cleaned immediately upon discovery. Any contaminated materials
are to be disposed in accordance with federal, state, and/or local requirements.
✓ The operator(s) shall ensure spill containment kits containing appropriate materials
(e.g., absorbent material and pads, brooms, gloves sand etc.) are available at
appropriate locations, including, but not limited to: designated areas for vehicle and
equipment maintenance; vehicle and equipment fueling; storage and disposal of
�
o hazardous
and stora
ge and disposal f h
' s products, .and waste;
construction materials, pr ug p
and toxic materials; and sanitary waste facilities.
✓ The locations of the spill containment kits are identified as described below:
Shown on
Date Plan Sheet Location
#(S)
Approved
Plan
REVISIONS TO LOCATIONS
Shown on IOperator(s)
Date Plan Sheet Location Initials
#(S)
✓ The operator(s) shall notify the Department of Environmental Quality of leaks, spills,
and other releases that discharge to or have the potential to discharge to surface
waters immediately upon discovery of the discharge but in no case later than 24
after the discovery.
✓ The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks,
spills, and other releases that discharge to or have the potential to discharge to
surface waters immediately upon discovery of the discharge but in no case later than
24 after the discovery. Written notice of the discharge must be sent to DEQ and
Henrico County Department of Public Works within five (5) days of the discovery.
Virginia Department of Environmental Albemarle County
Quality Community Development
NEED ADDRESS Engineering Department
(804) 786-3998 (phone) 401 McIntire Road
(804) 786-1798 (fax) Charlottesville, VA 22901
(800) 468-8892 (outside normal working (434) 296-5832
hours)
EQUIPMENT / VEHICLE WASHING
✓ Washing must be conducted in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
✓ All wash water used in vehicle wheel washing must be directed to a sediment
basin/trap.
✓ All vehicle washing activities other than wheel washing must have secondary
containment.
✓ Each facility must have appropriate signage to inform users whe
re the de
dicated
area(s) are located.
VEHICLE FUELING AND MAINTENANCE
✓ Conduct regular maintenance in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than STAPLES
50 feet from those features. (2 PER BALE)
✓ If fueling is conducted at a dedicated area, the location must be located to WOOD OR METAL STAKES
(2 PER BATE)
maximize the distance from storm drain inlets ditche
s, waterbodies or wetlands
but
no less than 50 feet from those features.
✓ The dedicated areas must be designed to eliminate the discharge of spilled and
leaked fuels and chemicals from vehicle fueling and maintenance activities by
AND FLAGGING DISCHARGES OF SOAPS, DETERGENTS, SOLVENTS, AND
3 SIDES
WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH AS
CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS, AND
CURING COMPOUNDS
✓ Washing activities associated with construction activities other than vehicle and
equipment washing, such as clean up of stucco, paint, form release oils, and curing
compounds are to be conducted in a dedicated area.
LATH AND FLAGGING SANDBAG (TY'•) ✓ The dedicated area must be located to maximize the distance from storm drain
providing secondary containment (spill berms, decks, spill containment pallets, 10' MIN. ON 3 SIDES VARIES —► inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
providing cover where appropriate, and having spill kits readily available). —STAKE Separations of less than 50 feet may be approved by the Environmental Inspector.
✓ Each facility must have appropriate signage to inform users where the dedicated _ o o C� TOP OF BERM ✓The dedicated areas must be designed to prevent the discharge of soaps,
c
area(s) are located. I^ A' TEI I detergents, solvents, and wash water.
VARIES -
10' MIN. 1 U.
o 0
IE
0 0 0 0 0
10 MIL PLASTIC LINING
ELM
STRAW BALE (TYP•) 10 MIL PLASTIC LINING OTTOM OF BERM
NOT TO SCALE ELM
NOT TO SCN.E
CONCRETE WASHOUT AREA CONCRETE WASHOUT AREA
ABOVE -GRADE CONTAINMENT AREA Wf STRAW BALES BELOW -GRADE CONTAINMENT AREA
a'" / PRESSURIZED WATER
o� SOURCE (CONTINGENT UPON PROVIDE DRAINAGE AWAY
/ WATER MAIN INSTALLATION) i ~ FROM TO A THE WASH RACK
�OQ�/ I / e DEVICE�-TRAPPING
1.
/ \_ / KEEP A BROOM AND SHOVEL'
, T CLOSE TO THE RACK TO
CLEAN THE STREET. -
A /
WASH RACK
IT IS ADVISABLE TO PROVIDE A
SEPARATE ENTRANCE TO LIMB A . J�
TRAFFIC ACROSS THE RACK AND
REDUCE WEAR AND MAINTENANCE. ��� **THE FOLLOWING IS AN EXAMPLE OF AN
ACCEPTABLE WASH RACK. OTHER APPROVED
METHODS MAY BE UTILIZED.'
ONE SECTION OF REINFORCED CONCRETE
CATTLEGUARD
3' WASHED STONE UNDER do BETWEEN
THE LOCATION MUST SLOPE AWAY SLATS TO DRAIN WATER AND SEDIM
FROM THE STREET OR STEPS MUST AW Y O. E CK
BE TAKEN (GRADING, DIVERSIONS,
ETC.) TO PREVENT RUNOFF FLOWING
Shown on
Date Plan Location of Dedicated Area(s)
Sheet # s
Approved
Plan
Shown on
Date Plan
Sheet #(s)
REVISIONS TO LOCATIONS
Location of Dedicated Area(s)
Operator's
Initials
✓ If mobile fueling will be used, the fueling must be done in an area that located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
✓ Spill kits must be readily available at all mobile fueling locations.
✓ On -site storage tanks must have a means of secondary containment (spill berms,
decks, spill containment pallets, etc.) and must be covered where appropriate.
✓ All vehicles on site must be monitored for leaks and receive regular preventive
maintenance to reduce the chance of leakage.
MIL PLASTIC LINING
IVE MATERIAL (OPT.)
BALE (TYP.)
G WIRE
10 MIL PLASTIC
11
SECTION A -A'
NQT ro SCALE
INTO. THE STREET. FOUNDATION OF B� _. , ,, �. ^
DISCHARGE FROM STORAGE, HANDLING, AND DISPOSAL '
OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE COMPACTED cRuRUN STONE s r r SILT FENCE
ceorExnLE sFcnoN 'A —A • LOCATE ON
FABRIC DOWNHILL SIDE
✓ Storage of construction products, materials, and waste is to be conducted in WASH RACK OF PORTABLE
dedicated areas. SEDIMENT CONTAINMENT AREA
ET
✓ The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector. SOLID WASTE COLLECTION CONTAINMENT AREA j
✓ The dedicated areas must be designed to minimize the discharge of pollutants from SILT FENCE I
NOT TO SME
storage, handling, and disposal of construction products, materials and wastes LOCATE ON
including (i) building products such as asphalt sealants, copper flashing, roofing COLLECCTIIO14 AREA
materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides,
fertilizers, and landscape materials; and.(iii) construction and domestic wastes such
as packaging materials scrap construction materials mason products, timber, ONTROL TRACKING
p g g p masonry p ' (GRAVEL, PAVEMENT OR
pipe and electrical cuttings, plastics, Styrofoam, concrete and other trash or building OTHER STABLE SURFACE)
OUMPSTER OR SOLID
products.. WASTE CONTAINER
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on
Locations) of Dedicated Area(s) for storage of construction
Date P Ian Sheet products and materials
#s
Approved
Ian P ..
REVISIONS TO LOCATIONS
Shown on Location(s) of Dedicated Area(s) for storage Operator(s)
Date Plan Sheet #(s) of construction products and materials Initials
Shown on Location(s) of Dedicated Area(s) for waste from
Date Plan Sheet construction products a� ...... +nd materials
#S
. �
- ...... ..'1,+1.++1 ..... --........---
Approved
Plan _. .
REVISIONS TO LOCATIONS
Shown on Location(s) of Dedicated Area(s) for waste Operator(s)
Date Plan Sheet from construction products and materials Initials
#(S)
✓ Follow all federal, state, and local requirements that apply to the use, handling and
disposal of pesticides, herbicides, and fertilizers.
✓ Keep chemicals on site in small quantities and in closed, well marked containers.
✓Clean up
solid waste including building ildingmat materials, garbage, e, and on a dail
y
Y
basis and deposit into covered dumpsters that are periodically emptied.
✓ Schedule waste collection to prevent exceeding the capacity of onsite containers.
Additional containers may be necessary depending on the phase of construction
(e.g., demolition, etc.)
✓ Dispose of all solid waste at an authorized disposal site.
✓ Ensure that containers have lids or are otherwise protected from exposure to
precipitation.
DISCHARGES FROM OTHER_ POTENTIAL POLLUTANT
SOURCES .
✓ Discharges from other pollutant sources (e.g., water line flushing, storm sewer
flushing, above ground storage tanks, etc.) not mentioned elsewhere must be
addressed.
Other Potential Pollutant Sources
Locations of Potential Pollutant Sources
4 =, sx rx' .£ i E i
%,w £ fS l f:. £` 3. E.
P; �, F
# %
tux 5 5 t E r r a,, t �. f S x c
�,,,,, �I E> t;; 1 R3 0 � € , €' § i
x
xd' d s s L9
y E i
`, F Y � Nr �, dp E € p "� d I 3 £
§ +t
�l4?" t EEa frr
1t
_: 7 E lE
9YE. 3 �£L` '. �' `�N iY ES � _
E` E{!! 3 a I E d%SA.
S .I� x
.n1— k -: f. y F ,n,Ei L bi
L E ,L 5'�Si�'kr'
E
y
''''L , - 3 EIE {v1 5-"o'J� 'LLn �€i"
J eta
_ k<
Fri is '?�• v r ,
:,, .its +Ya
,
_ �.., ,fit ig
��,;
#
,, s ^x� sn
9 x �4
r g f E4 .# r E,`.. a ..,, rf Kc I € �x
`:„
.,ut
£ S # y aF' d `` 0 ! h ( _
hd dxf`-Fxf% E
P,p Y
x
If � £ 'E€ y P i` ,�£'€ rE`� 3 ,+:,
S E . R} f r g I R
E. FEE �(f 3"�
�VtI
k. ":€ ' �E'^"', ,,M 1, i'. ' v, LfaYdi }11
E�
� t 0 L"' s
IK
"` fi "r . iz r x v'k $ r
i Fi' 2'" i G `a`' R �'kEs* i-�,..kR' L'f `3�d x F Y^ 5
a ....aa ,j
:., t ` a1k ai.�€ h 11:.
,�kE '#i� NL ,�Ei 3. �' L
S`
.a� kq
�.W
e'z, '' r'
,
M E
e,,
n"kL., ..L. ....£ T t4 ,SE,`1 ,r ., rk»`:' .S ...::.Zs E
_.:,., t "��R`:� i."A4y ., 93 �,,AAk�,o, d ,.. ,.F
✓ Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons and
have a reasonable expectation of a discharge into or upon Waters of the United
States are required to have a Spill Prevention Control and Countermeasure (SPCC)
Plan.
✓ The discharge of contaminated flush water and material removed during flushing
operations must be collected and disposed of in accordance with appropriate
federal, state, and local requirements.
FUELING AREA
BELOW —GRADE CONTAINMENT AREA
10 MIL. PLASTIC
3'
REA
SECTION A -A'
12' HIGH DIVERSION BERM NOT o SCALE
10'
STD.
PORTABLE
TOILET
ON 3 DOWNHILL SIDES VARIES
SANDBAG (TYP.) ,
aM
Tg U :...
:., PAVED FUELING AREA r ",
VARIES
t
.:�.
..
10 MIL. PLASTIC LINING BOTTOM OF BERM
TOP OF BERM
DISCHARGES FROM CONCRETE RELATED
WASH ACTIVITIES
✓ Concrete trucks are not allowed to wash out or discharge surplus concrete or drum
wash water on site except in a dedicated area(s) that is located to prevent
discharge to storm drain inlets, ditches, waterbodies or wetlands but no less than 50
feet from those features.
✓ Each facility must have a stabilized access to prevent mud tracking into the street.
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
✓ Facilities must be cleaned, facilities sco constructed, once the washout area is s
two-thirds (2/3) full.
Shown on
Date Plan Location(s) of Dedicated Area(s)
Sheet # s
Approved
Plan . PI n .
Shown on
Date Plan
Sheet #(sl
REVISIONS TO LOCATIONS
Location(s) of Dedicated Area(s)
Operator(s)
Initials
✓ The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.) to
prevent contact with stormwater.
✓ The contaminated wastewater from the dedicated area must be collected for
disposal by a waste hauler or discharged to the sanitary sewer.
✓ In situations where these pollutants are or could be generated at locations other than
at the designated area (e.g., concrete pours, building washing, etc.), cover (e.g.,
plastic sheeting, temporary roof, etc.) must be provided to prevent contact with
stormwater and the contaminated wastewater from the activity must be collected for
disposal by a waste hauler or discharged to the sanitary sewer.
DISCHARGES OF HAZARDOUS, TOXIC
AND SANITARY WASTE
✓ Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted in
dedicated areas. .
✓ The dedicated areas must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector.
The dedicated areas must be designed to prevent the discharge of hazardous, toxic
and sanitary waste by avoiding contact with precipitation
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on Location(s) of Dedicated Area(s) for storage and disposal of
Date Plan hazardous and toxic wastes
Sheet # s
Approved
Plan 'i:
P n
l
REVISIONS TO LOCATIONS
Shown on
DatePlan Location(s) of Dedicated Area(s) for storage Operator(s)
a Sheet #(s) and disposal of hazardous and toxic wastes Initials
Shown on
11
Date Plan Location(s) of Dedicated Area(s) for portable toilets
Sheet #(s
Approved
Plan `
REVISIONS TO LOCATIONS
Shown on Location(s) of Dedicated Area(s) for portable Operator(s) .
Date Plan toilets Initials
Sheet #(s)
✓ Consult with local waste management authorities or private firms about the
requirements for disposing of hazardous materials and/or soils that may be
contaminated with hazardous materials.
Never remove the original product label from the container. Follow the
manufacturer's recommended method of disposal.
✓ Schedule periodic pumping of portable toilets and dispose of waste
✓ Dispose of all solid waste at an authorized disposal site.
SWPPP MODIFICATIONS AND REVISIONS
The operator(s) shall ensure the SWPPP is modified and/or revised to reflect:
✓ Changes in qualified personnel; delegated authorities or other personnel required as
a condition of the General Construction Permit;
✓ Changes in site conditions;
✓ Changes in the design, construction, operation, or maintenance of the construction
site that affect the potential for discharges of pollutants that are not addressed in the
normal implementation of the plan; and
✓ Ineffective control measures identified during inspections or investigations
conducted by the operator's qualified personnel or local, state or federal officials.
Modifications/revisions to the SWPPP shall include additional or modified control
measures to address the identified deficiencies.
If the necessary modifications/revisions require approval by the Administrator or DEQ,
the modifications/revisions must be implemented no later than seven (7) calendar days
following approval.
II wing pp
If the necessary modifications/revisions do not require approval by the Administrator,
the modifications/revisions must be implemented prior to the next anticipated storm
event or as soon as practicable.
SWPPP UPDATES
The operator(s) shall update the SWPPP to include:
✓ A record of dates when 1) major grading activities occur, 2) construction activities
temporarily or permanently cease on a portion of the site, and 3) stabilization
measures are initiated;
✓ Documentation of modifications and revisions to the SWPPP;
✓ Areas that have reached final stabilization where no further SWPPP or inspection
requirements apply;
✓ All properties that are no longer under the legal control of the operator and the dates
Ton which the operator no longer had legal control over each property; and
✓ The date, volume, and corrective/preventative actions implemented for any
prohibited discharge. .
The operator(s) shall update the SWPPP no later than seven (7) days following any of
the situations identified above.
OPERATOR IN
SPECTIONS
The operator(s) identified below shall provide for inspections of the permitted Ind-
disturbing activities by the qualified personnel identified below. The inspections will be
conducted (select one the following options):
Where areas are in a stabilized condition or runoff is unlikely due to winter conditions,
the inspection frequency may be reduced to once every 30 days while these conditions
exist. Otherwise, the operator(s) shall resume the regular inspection frequency
identified above.
The operator(s) shall provide for inspections of the permitted land -disturbing activity to
ensure implementation and continued maintenance of all requirements of the
Stormwater Pollution Prevention Plan (Erosion and Sediment Control Plan, Stormwater
Management Plan, Pollution Prevention Plan, TMDL requirements, etc.).
Records of the required inspections must be maintained and included in the SWPPP
binder. The qualified personnel are encouraged to use the Operator Inspection form
provided in the SWPPP binder to document the required inspections. If inspections are
conducted once every five (5) business days and no later than 48 hours following any
measureable storm event, the location of the rain gauge used to determine the amount
of rain must be included in the SWPPP and documented in the inspection report.
ACKNOWLEDGEMENTS
I certify under penalty of law that the qualified personnel identified below:
a. has been designated by the Operator to conduct inspections of the
permitted site;
b. is knowledgeable in the principles and practices of erosion and
sediment control and stormwater management;
C. possesses the skills to assess conditions at the permitted site for the
Operator(s) that could impact stormwater quality and quantity;
'd. will assess the effectiveness of any erosion and sediment control
measures or stormwater management facilities selected to control the
stormwater discharges from the permitted site; and
e. will conduct inspections in accordance with the frequency noted above
in the OPERATOR INSPECTIONS section of this sheet.
QUALIFIED PERSONNEL
. i fE�.. 3 3s�i "E "'"". x �r. .�,�.€`E_ t of 5e,�f
Name (print) w F"111-1-1 L
s tE t e xnE�= <.fi-x"rsss t* ,,E'�1�:,i ,:f .�� "3k
E�, x d `� Y a E ,yrf a2f t ''a II s E 1i f " L €i x:
., ,h xf ,,.,,�,...t �{ t"x [ t -f t�F k r
a. ,. ,.., A6 �,s�; ,a....v_.;
r. ,� .. u .�. .0 E9, .._...,
.:R z.,. o.. «... ..
H.
i
R": I N D f
4
% h
Phone t.,". 11n,,.,...
hL
__ fE N,1 , _. . l.
,...._._ I 10
�.. .
�£ €L �� Y 1 s �,KiS`c zE $$ 1f a�`'f'„'x �Yf ,�r F'�s�f -
£ s3"d t
Additional information is located in Tab 6 of the SWPPP Binder.
As the Operator(s) or Delegated Authority, I understand that prior to initiating an
disturbance, the potential pollutant sources, appropriate control measures, and all
responsible parties (operator, qualified inspection personnel, contractors, etc.) required
I
s a condition of the General Construction Permit (GCP) and the Stormwater Pollution
Prevention Plan (SWPPP) must be identified. I also understand this information must
be updated as necessary throughout all phases of construction until the GCP is
terminated.
Furthermore,
I/we certify under penalty of law that I/we have read and understand all requirements of
the SWPPP (erosion and sediment control plan, stormwater management plan, pollution
prevention plan, TMDL provisions, administrative requirements, etc.) and GCP and that
the information herein is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fine or imprisonment for knowing violations.
I/we understand that I/we are ultimately responsible for compliance with all conditions
and requirements of the SWPPP and GCP and for ensuring all contractors and
subcontractors on the permitted site are aware of the conditions and requirements of
the SWPPP and GCP.
I/we shall comply with all conditions and requirements of the SWPPP and shall at all
times properly operate and maintain all measures and control (and related
appurtenances) which are installed or used to achieve compliance with the conditions of
the GCP. Proper opration and maintenance also includes adequate funding and
adequate staffing.
I/we shall take all reasonable steps to minimize or prevent any discharge in violation of
the SWPPP and/or GCP.
I/we understand that if it determined by the Department of Environmental Quality (DEQ)
in consultation with the State Water Control Board at any time that stormwater
discharges are causing, have reasonable potential to cause, or contribute to and
excursion above any applicable water quality standard, the DEQ may, in consultation
with the Administrator, take appropriate enforcement action and require:
a. Modification of control measures to adequately address water quality
concerns;
b. Submission of valid and verifiable data and information that are
representative of ambient conditions and indicate that the receiving water is
attaining water quality standards; or
C. Cessation of discharges of pollutants from construction activity and submit an
individual permit application according to 4VAC25-870-410.
OPERATOR(S) / DELEGATED AUTHORITY
r' Si ature Date
Name (r, Int) an
Additional contact information can be found in the SWPPP Binder.
r
U
0
4
t- 0
<�* U
01. W,-
_
En I NN m
NQ
ZN2Z)(0Q
OW Z-0
U'
q>>O
�W u® L-iz
OU �_1
0.Z �-0Q>Q
()()(0�w
U Q OI
d8 co 0Cc N
CC Q? 2 �=rnO20UU
CO ,00Cc I
� QN
0U)�
CC (5Cc��Z W2 0❑LLco LU
M () ] ij a LO
rs C _N��U
t 4W I"' z o
ILIA 2 �ItcO
a) �,— WzOtu =a
g4�a-0
9
8 III
O /I
IIII
I.
U ` '
1
JIMMY' L. TAGGART
Lic. No.
A 22841 p0401-16-19 %
�*SIONAL S't
Z :5
W
2 0 tn
W J
O ... J Q
IIm
CL g W
..
CO
it
0 > 06
� U j Z Vn
o U �
s cv F"'
CL®Z�®
�I W
w a
® � Q.
2 W a.
W 3:
LL
J LL
O O
DATE:
1 01-16-2019
SCALE:
I AS SHOWN
JOB: 8053
CONTOUR INTERVAL: N/A
DESIGN BY:
I JLF
SEALED BY:
IJLT
SHEET: 03 OF 03