Loading...
HomeMy WebLinkAboutSDP202000004 Review Comments Final Site Plan and Comps. 2020-02-14Phone (434) 296-5832 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Project Coordinator: SDP2020-00004 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Fax (434) 972-4126 Site Plan review Hampton Inn — Final Site Plan John Wright, PE, Bohler Engineering / 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 [ jwrightAbohleren,g com ] Michael Sweeney, PT Hotel, LLC, 2000 Ware Bottom Spring Road Chester, VA 23836 [ michael(abshaminhotels.com ] 8 Jan 2020 14 Feb 2020 John Anderson Kevin McCollum / Zoning C-105 1. LS-seal obscures date; please ensure text is easily readable (April 19, 2018). 2. Ex. 2 1 " RCP to be removed appears in conflict with floor of sediment trap. —Elev. 501' is top of new 24" RCP permanent (and bypass?) storm pipe =floor of ST. Revise sequence or sediment trap design on VSMP /WP0201900047 to provide sufficient cover between floor of ST and crown of 24" RCP, and to preserve integrity of pipe bedding for 24" RCP. Locating RCP directly beneath active sediment trap may compromise pipe bedding unless ST is equipped with impermeable liner. If proposed 24" RCP is not a bypass and will not be installed until the sediment trap is removed, please clarify via plan notes and sequence /narrative. For the moment, proposed 24" RCP permanent storm line appears to be a `bypass' as well that permits the 21" Ex. RCP to be removed. If review error /misunderstanding, please notify. (Engineering intends to issue WP020100047 comments not later than Wed, 19-Feb.) 3. C-201: Note 11 requires slight text edit (references two bypass pipes, a possible error). C-301 4. Label curb types. 5. Review STM A-30 label /leader line. 6. Provide /label handrail at top of uppermost retaining wall. 7. Label CG-12 pedestrian ramp at SW site entrance. 8. C-303: Albemarle defers to VDOT review /approval of Maintenance of Traffic plan. 9. C-304: Note 3. Recommend Bohler Engineering rely on Kimley-Horn Associates design plan elevations (for State Farm Boulevard /South Pantops Drive Sidewalk project; 2016), which are likely more refined and accurate than County GIS. County GIS data layer may not be used as a basis of site plan design. GIS data layers are available to the public for informational purposes only. 10. C-401: Proposed grading north of curb and gutter on the north side of site creates a channel, and concentrates runoff. Provide ditch label, and design ditch at this location. 11. Engineering recommends revise design to divert dumpster enclosure runoff through a curb -cut to exit without detention /treatment to newly graded slopes south of development. Recommend discharging minor runoff (-19' x I V dumpster enclosure) to ground surface to bypass and protect the SWM system from solids, refuse, debris, trash, grease, etc. that may, with current design, be conveyed into subgrade systems and degrade or impede performance of the detention system. Any obstruction or short-circuiting may be recurrent, persistent, and difficult to address later, yet avoidable at the design stage. Engineering Review Comments Page 2 of 2 C-502 12. Note: Storm lines proposed to convey State Farm Blvd. runoff (source: public RW) across the hotel site require public deed of dedication of easement, and platted public drainage easement. Complete easement plat application at earliest convenience. 13. Recommend relocate STM A-20 and STM A-30 labels to more clearly identify structure location. 14. C503 /Re. 10-yr HGL computations: a. At STM A-59, compare outlet WSE 510.28 with 508.50' crown of pipe b. At STM A-60, compare outlet WSE 510.45 with 509.50' crown of pipe c. At STM A-79, compare outlet WSE 510.28 with 509.25' crown of pipe d. At STM A-80, compare outlet WSE 510.46 with 509.55' crown of pipe Design must ensure flow is open channel regime, not pressurized, unless design provides notes, specifications, labels etc. to ensure watertight fit (fittings, gaskets, seals, etc.) from pipe subgrade to rim elevations. 10-yr HGL computations table appears to indicate pressurized flow. 15. Show STM A-59 and STM A-79 labels in plan view. 16. C-902: Provide VDOT IS-1, ST-1, PB-1 details on plan. Please feel free to call if any questions: 434.296-5832 -0069 Thank you SDP2020-00004 Hampton Hotel FSP 021420