Loading...
HomeMy WebLinkAboutWPO201900052 Calculations 2020-02-18 (5)Water Quality Peak Flow Computations Hydrodynamic Separator Project Name: Berkmar Drive Apartments Timmons Group Project No. 42297 Date: 01 /20/2020 Calculated By: Cameron Morgan Drainage Area Conditions Water Quality Rainfall Depth, P 1.00 in Total Area, A 7.25 acres Impervious Area 5.00 acres Percent Impervious 69.0 % Treatment Volume (per VRRM), Tv 21,215 cf Curve Number (CN) 98 Time of Concentration, Tc 10 min Unit Conversions Area, Am (mi) 0.0113 mil Tc (hours) 0.17 hours Derived Values Runoff Volume, Qa 0.81 in Potential Maximum Retention, S 0.25 in Initial Abstraction, la 0.05 in la/P 0.05 Use 0.10 Unit Peak Discharge, q„ (ref. Exhibit 4-II of the TR55 Manual; see next page) qU = 850 csm/in Water Quality Storm Peak Flow, Q,,(, QWQ = 7.76 ds TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Hydrologic Equations S=1CN T —10 Qa=A Ia = 0.2S QwQ = q.A.Qa 1 of 2 Water Quality Peak Flow Computations Hydrodynamic Separator Project Name: Berkmar Drive Apartments Timmons Group Project No. 42297 Date: 01 /20/2020 Calculated By: Cameron Morgan 400 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Hxhib3t 4-II Urat peal dl%charge (cIJ for NRCS (SM type II rainfall di-9mbutlan 800 600 500 2 400 70 .Pp LP D 20❑ a C 100 80 60 so 1 .2 .4 .6 .6 1 2 4 6 a i n Time at concentration (T.),;hnuro 2 of 2