Loading...
HomeMy WebLinkAboutWPO201800088 Bond Estimate (2)Project Name: VSMP Major Amendment Plan for Pantops Corner WP0201800088 WPO file number: WP0201800088 TMP(s): 07800-00-00-058G1, 07800-00-00-005A0, 07800-00-00-005B0, 07800-00-00-005EO Date Estimate Completed: 07-16-19, K.Rucker Stormwater Management Plan Bond Estimate Item Item Number 1 permanent diversion or ditch 2 standard manhole frame top (not inlet) 3 drop inlet or grate 4 manhole structure (per ft. rise) 5 pipe, rcp, cmp (15 to 48") 15.0 in 0 ES-1,2 - 0 EC-1 6 18.0'.in 0 ES-1,2 0 EC-1 7 24.0!.in 0 ES-1,2 0 EC-1 ' 8 30.0'in 0 ES-1,2 1 EC-1 9 aggregate base or drainage stone 0.0 in d 0.0 ft L 0.0 ft W 10 11 earthwork for UG detention system 12 height of dam at toe 0 ft cut at high side ft 13 height of fill at face 0 ft cut at face ft 14 length of dam 0 ft length of cutoft ft 15 top width 0 ft width of cut 16 (area above transition; ...., (area below transition 0 sf 17 (total width of dam) 0 ft (total width of cut) 0 ft 18 (height below transttoor 0 ft (depth below transitio.. 0 ft 19 (area below transition) 0 sf (area above transitior 0 sf 20 (total fill volume) 0.0 cy (total fill volume) 0.0 cy 21 length of spillway ft JOAL CY estimate) 0 cy 22 width of spillway ft (spillway stone tons) 0 tons 23 structures for basin 24 riser height ft 25 riser diameter in - (riser unit price) $0.00 26 barrel length ft base plate or fdn _ 27 barrel diameter ' in ,­t nncel $0.00 28 barrel collars 29 baffle length .ft 30 31 trees 32 shrubs 33 seedlings 34 underdrain (LF) 35 biofilter soil mix (CY) 36 trash rack/ anti vortex devices 37 maintenance access road (LF) 38 rip -rap, placed depth 5ft length ft 39 width ,'*o (tons) 60 40 survey and layout (price per 0.1 mi.) acres 'l basins 0 Reduction Date 12/26/2019 No. Unit Unit Cost Cost % Complete Cost Remaining (installed 0 ft $13.00 $0.00 1. ea $500.00 MOM 80% $100.00 0 ea $3,500.00 $0.00 21 ft $450.00 $9,450.00 60% $3,780.00 0.0 ft $35.00 $0.00 0.0 ft $40.00 $0.00 0.0 ft $50.00 $0.00 8.0 ft $65.00 $1,020,00 50% $510.00 0.0 ton $35.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 Jeo $275.00 $0.00 ea $50.00 $0.00 ea $5.00 $0.00 ft $5.00 $0.00 cy $45.00 $0.00 ft $1,500.00 $0.00 ft $50.00 $0.00 $60.00 $3,600.00 $3,625.00 80% $720.00 80% $725.00 1 /6/2020 Project Name: VSMP Major Amendment Plan for Pantops Corner WP0201800088 WPO file number: WP0201800088 TMP(s): 07800-00-00-058G1, 07800-00-00-005A0, 07800-00-00-005B0, 07800-00-00-005EO Date Estimate Completed: 07-16-19, K.Rucker Stormwater Management Plan Bond Estimate Item Item Number 41 mobilization 42 as -built drawings (per facility) 43 materials testing (per facility) 44 compaction testing (per dam) 45 46 Manufactured facilities (attach manufacturer's or contractor's price as a base) Contech 0 -Underground detention system Underground Detention System: Famish and install 96" corrugated metal piping with all excavation and backfill and #57 stone per manufacturer's specificatrons- I 261,717-� WP0201800088 Pantops Corner_ SWM_bond_est_09-27-17_071619 KR E Reduction Date 12/26/2019 No. Unit Unit Cost Cost % Complete Cost Remaining (installed) $2,500.00 50% $1,250.00 ....9 ea $2,000.00 $2,000.00 50% $1,000.00 1 ea $2,000.00 $2,000.00 50% $1,000.00 0 ea $3,000.00 $0.00 $261,717.00 60% $104,686.80 cost sum $286,412.00 $113,771.80 contingency $28,641.20 $11,377.18 Total $315,060 $1251150 40% 1 /6/2020