HomeMy WebLinkAboutWPO201800088 Bond EstimateProject Name: VSMP Major Amendment Plan for Pantops Corner WP0201800088 WPO file number: WP0201800088 TMP(s): 07800-00-00-058G1, 07800-00-00-005Ap, 07800-00-00-005B0, 07800-00-00-005E0 Date Estimate Completed: 07-09-19, K.Rucker ; rev. JA, 07-16-19 Erosion and Sediment Control Bond Estimate Item Item Number t stablization (PS, TS) 2 silt fence (SF) - 3 safety fence (SAF) 4 diversion (DD, FD, RWD) 5 temporary slope drain (TSD) pipe length Oft pipe diameter 0 in 6 Sediment Basin - N/A 7 earthwork for Sediment Basin #1 8 structures for Sediment Basin41 9 Sediment Trap #1 10 earthwork for trap/basin height of dam at toe ft cut at high sideoft ft 12 height of fill at face ft cut at faceft 13 length of dam It length of cutft 14 top width ',34 ft width of cut 15 tarea above transition 15 st !area below transits, 124 sf 16 (total width of dam) 6 ft (total width of cut) 50 ft 17 (height below transitio 1 ft (depth below transit 5.5 ft 18 (area below transition 2 sf (area above transiti 107.25 sf 19 (total fill volume) 116.7 cy (total fill volume) 1199.1 cy 20 length of spillway =ft (TOAL CY estimate 1238 cy 21 width of spillway ft (spillway stone tons 54A tons 22 structures for basin 23 riser height ft 24 riser diameter il'. in (riser unit price) $0.00 25 barrel length 0 ft base plate or fdn 26 barrel diameter 0 in barrel unit price) $0.00 27 barrel collars 28 baffle length Mft 29 Sediment Trap #2 30 earthwork for trap/basin 31 height of dam at toe ft cut at high side ft 32 height of fill at face . It cut at face ft 33 length of dam It length of cut ft 34 top width ft width of cut ft 35 (area above transition 6 sf (area below transitot 230 sf 36 (total width of dam) 4 ft (total width of cut) 82 ft 37 (height below transitio 1 ft (depth below transit 13 ft 38 (area below transition 1 sf (area above transiti 364 sf 39 (total fill volume) - (total fill volume) 550.0 cy 40 length of spillway 28 ft (TOAL Cy estimate 558 cy 41 width of spillway 17.4 ft :spillway stone tons 28 tons 42 structures for basin 43 riser height {� 0 ft 44 riser diameter 0 in (riser unit price) $0.00 No. Unit Unit Cost (installed) `acres $5,000.00 ft $5.00 ft $5.00 ft $13.00 Reduction Date: 12/26/19 Cost % Complete Costs Remaining $36,250.00 $7,580.00 $5,730.00 $13,221.00 $0.00 $13.00 $16,094.00 $50.00 $2,705.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $13.00 $7,254.00 $50.00 $1,400.00 $0.00 20% $29,000.00 20% $6,064.00 50% $2,865.00 50% $6,610.50 20% $12,875.20 20% $2,164.00 0% $7,254.00 0% $1,400.00 1 /6/2020 Project Name: VSMP Major Amendment Plan for Pantops Corner WP0201800088 WPO file number: WP0201800088 TMP(s): 07800-00-00-058G1, 07800-00-00-005A0, 07800-00-00-005B0, 07800-00-00-005E0 Date Estimate Completed: 07-09-19, K.Rucker ; rev. JA, 07-16-19 Erosion and Sediment Control Bond Estimate Item Item Number 45 barrel length 0 ft base plate or fdn 46 barrel diameter - -. 0 in �.-i unitpmt*) --$0-.400 47 barrel collars 48 baffle length ft 49 50 silt fence inlet protection (IP) 51 stone inlet protection (IP) 52 outlet protection (OP)-Trap#1 length 56 ft width ft No. Unit Unit Cost (installed) $200.00 $200.00 $50.00 $100.00 $200.00 14 $4,233.60 Reduction Date: 12/26/19 Cost % Complete Costs Remaining $0 $0.00 $0 $0 $0.00 $5,200.00 20% $4,160.00 $4,233.60 20 % $3,386.88 3 iIL7F3rYzil