Loading...
HomeMy WebLinkAboutSDP201800012 Action Letter 2019-05-20COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone 434 296-5832 Fax 434 972-4126 May 20, 2018 Andrew Allison 608 Preston Avenue Charlottesville, VA 22903 Andrew.Allison timmons.com RE: LOR#1 for SDP2017-76 Woolen Mills Redevelopment Tax Map/Parcel Number 78-21 B Dear Mr. Allison This letter is to approve as a Letter of Revision the changes outlined in your letter of March 15, 2019 (attached) and shown on the submitted plans. This is the 1 st Letter of Revision for this site. A total of three (3) Letters of Revision are allowed before all changes to the plan are required to be submitted in the form of a site plan amendment. Sincerely, William D. Fritz, AICP Development Manager/Ombudsman Attachments: Letter of Request Site Plan Change em d TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. March 15, 2019 County of Albemarle Bill Fritz, AICP — Chief of Special Project Department of Community Development 401 McIntire Road Charlottesville, VA 22902 608 Preston Avenue r 434.295.5624 Suite 200 i= 434.295.8317 Charlottesville, VA 22903 wwwAlmmons.com RE: Woolen Mills Redevelopment — SDP-2017-76 Letter of Revision Dear Mr. Fritz: The following is a summary of changes reflected in the Letter of Revision #1 submission: • Sheet C0.0: proposed building use has been updated from residential/commercial/office space to office/commercial space. The parking requirement calculations have been revised accordingly. • Sheet C2.2 — The existing loading dock is to be removed on the west side of the site. The large concrete pad on the north side of the project is to be removed. Sheet C4.0: The pedestrian bridge has been shown on the south side of the site, adjacent to the rain garden. • Sheet C4.1: Domestic waterline connection location has been revised. Additional curb and gutter were added south of the two (2) ADA parking spaces nearest the building entrance. The arrangement of stairs connecting Broadway St to the building have been updated. • Sheet C4.2: Play area location has been updated. The pedestrian bridge location has been shown next to the rain garden along with additional sidewalk and ten (10) more bicycle parking spaces. A domestic water line connection has been removed adjacent to the ACSA check valve with associated bypass. The fire hydrant located between the building and Moores Creek was shifted east. The PIV and FDC along this face of the building have been removed as well. Guard railing adjacent to the parking spaces facing Moores Creek have been replaced with concrete wheel stops and a shallow drainage swale. A connector has been provided linking the two halves of the existing building. A stairs and deck have been added between the two halves of the western -most building. • Sheet C4.3: Amenity space located between the three buildings, on the southern side has been updated. The sanitary sewer connection has been revised as well. The sanitary sewer alignment on the east side of the building has been revised. A path has been provided from the northern parking lot down to the exiting two story building. A series of stairs will be installed to accommodate this connection. Additional stairs have been added to the access of the existing two-story building. • Sheet C5.0: Pipe and inlet numbers have been revised. Trench drains have been added to the amenity space on the north side of the building. • Sheet C5.1: Pipe and inlet numbers have been revised. Riprap protection has been added along the pedestrian bridge abutments. Drains have been provided between the existing building and corresponding pipe added to the plan. * Sheet C5.2: Pipe and inlet numbers have been revised. The stormwater outfall location has been relocated west to avoid extending through the wall. Per coordination with Vinny Pero (USACE) this proposed relocation does not propose any fill below the ordinary high-water mark and no further permitting is required from USACE. A revised "no rise" certification shall be submitted. • Sheet C5.3: Spot shots have been revised for the stairs within the parking lot. Elevations were changed around the courtyard between the two buildings. • Sheet C5.4: Spot shots have been provided for the pedestrian bridge. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GSS I LANDSCAPE ARCHITECTURE f CONSTRUCTION SERVICES • Sheet C5.5: Spot shots have been provided for the updated amenity space on the southern side of the building. • Sheet C6.1: Drainage area numberings have been revised to match the latest pipe numbering. ■ Sheet C6.2: The Stream Buffer Mitigation Plan has been updated to incorporate the latest improvements and bridge addition. • Sheets C7.0 — C7.4: Stormwater profiles have been revised to reflect latest numbering scheme. Water line profiles have been updated to reflect latest updates to hydrant and connection locations. • Sheet C7.5 Stormwater Profiles has been added to the plan set. If you have any questions or comments, please feel free to give me a call at 434.327.1683. Sincerely, Andrew Allison Project Engineer