Loading...
HomeMy WebLinkAboutWPO201800088 Bond Bond Inspection 2019-11-19 iiate Receiired://7/9fir Fee Paisii 1 ,17e) -7- A a A L,4 _ ' R- eceived by: 0(•,-i •g* r i iiii - 711 .. . Intake: Forward to Iganagement Analyst 411k1V- 07 b • 'eAtafirefi )///61 iti G. BOND INSPECTION REQUEST APPROVED PLAN# WPO 201600088 7; 7UJ2 Re C2/Zere PROJECT NAME: Pantops Corner VSMP : -- 3,A10 40)5P)4 (As listed on the approved plan) This is is to request that an inspection be performed by.the County. Where fees are,asSessed;a fee is required for each inspection. Please check the inspections requested. 2 VSIVIP/VESCP Erosion Control,Stonnwater Management and/or Mitigation per Water Protection Ordinance section.17;207&208 S250 0 Subdivision(roads,drainage;etc.)per Subdivision Ordinance Section 14-435 and 14-438; S269 - ' El Water&Sewer per Subdivision Ordinance section 14,435 $269 0 Site Development Performance bond(Incomplete Site,Work&LandScapd Maintenance) $301 TOTAL FEES $250 Inspeetions for the purposes of bond reduction or release will require.a separate fee for eaeh bond.. Submit requests to: Department of Community Development,401 Mointire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspettion reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and countY!s published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: mcgowan'I 950 @ qmail.ddrn OR REGULAR MAIL ADDRESS: CO keane@shimp-engineering.com Signature of Owner eveloper &a1404 / - q 0Abfiftv zzfj Print Name , Dat 77f:y.-77:7)an.-, . , Revised 7/15/2014,7120r2015.11/3/2015 / i .4, . ________ 3 , - r t-\j 0 Your Pa Yment Was o L Item ;$250 0E ' Website Payment $250 Submitted r ' 47. 1 Item Number: 343041 _ 1; � �lllt ._ �" ' Type: Community Development Other 0 /04 _°"5 e e ` Notes: Bond Inspection Request WPO 201800088 '• " r �'� A 4 i Pantops Corner VSMP: SWM Bond Reduction Transaction ID: 8MX19762MG4967239 Transaction Time: 11/18/2019 01:36 PM Transaction Fee $6.72 Total Paid: $256.72 ir 4,..., Total $256.72 leiR G. 1 - _ _____ We will receive notification of your online payment at the time that it is made and we will credit your payment as of that day. However, you will not see the payment on your account for approximately 48-72 hours due to the time that it takes to get those funds into our bank account.