HomeMy WebLinkAboutWPO201600063 Checklist - Project Closeout (Administrative) 2019-02-18WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form within 30':, of project completion and/or bond release; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items V� m��s have been placed in LaserFiche, Imaging Center staff will forward to Centralized Filing. WPO# X1 — O9 J M! PROJECT TITLE ".J7) C V ) n 4�� 118 FULL NAME INSPECTOR: o n Ce� 040 FINAL ACTION DATE: 1274$ — CountyView — ❑ Status/Status Date --------------------------------------------------------------------------------------------------------------------------- Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order (latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the "Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name) of the document in the space provided. ❑ Preconstructi Meeting Form ❑ Sc ❑ Saved location ❑ Grading Permit ❑ Scan ❑ Saved location ❑ Inspection Requests ❑ Scan ❑ Saved locatio ❑ Inspection Results (Includ any inspection ickets, memos, photos, etc.) ❑ Scan Saved to ation Bond Reduction/Bond Release otice from Inspector to Management Analyst . Scan ❑ v location ❑ Conservation Checklist ❑ Scan ❑ aved cation ❑ As -built /Construction Plans ❑ Scan Saved locatio ❑ Other (Please explain) ❑ Scan ❑ Saved location ❑ Other Plans - At the lend clarity to the unapproved and n El Scan ector's discretion, copies of v at a later date. If such a note clarifying why it was ❑ Saved location roved plans/plats may be placed in the file if they are included, they should be clearly marked as NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened (except plats/plans), and in chronological order (latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete, Imaging Center staff will circle the incomplete item and return folder to the County Engineer for corrective action. Draft 12-5-2013