Loading...
HomeMy WebLinkAboutWPO201600049 Bond Bond Inspection 2019-09-25Internal L c Onk Date Recei,ed: Fee Patti: Received by irtake: Fomard to Management %nalyst SIR' �e 1� :cam- �/Z,1�5 BOND INSPECTION REQUEST APPROVED PLAN 14 WP0201600049 PROJECTNAME : -OLD TRAIL BLOCK 22 WASTE AREA EROSION PLAN gal the approxed phin 1-his Is to request that an inspection be pert6rined b\, the COLMII.. �k liere fees are assessed. a tee Is required for' each inspection. Please check the inspections requested. W VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207 & 208 S250 11 Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435 and 14-438-, S269 11 Water & Sewer per Subdivision Ordinance section 14-435 $269 0 Site Development Performance bond (incomplete Site Work & Landscape Maintenance) S301 TOTAL FEES $250 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst - Phone 434-296-5832. Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports, and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 1.0% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work, a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: DAVE(o-)OLDTRAILVILLAGE.COM OR REGULAR MAIL ADDRESS: Signature J rirrta '_e* rx P r Date ReN ised 7 15 2014, 7%2020 15. 11 320 1 4; Fee Received Received Date Received By G��