HomeMy WebLinkAboutWPO201600049 Bond Bond Inspection 2019-09-25Internal L c Onk
Date Recei,ed: Fee Patti:
Received by
irtake: Fomard to Management %nalyst
SIR' �e
1� :cam- �/Z,1�5
BOND INSPECTION REQUEST
APPROVED PLAN 14 WP0201600049
PROJECTNAME : -OLD TRAIL BLOCK 22 WASTE AREA EROSION PLAN
gal the approxed phin
1-his Is to request that an inspection be pert6rined b\, the COLMII.. �k liere fees are assessed. a tee Is required for'
each inspection. Please check the inspections requested.
W VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207 & 208 S250
11 Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435 and 14-438-, S269
11 Water & Sewer per Subdivision Ordinance section 14-435 $269
0 Site Development Performance bond (incomplete Site Work & Landscape Maintenance) S301
TOTAL FEES $250
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst - Phone 434-296-5832. Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 1.0% of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work, a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to;
EMAIL: DAVE(o-)OLDTRAILVILLAGE.COM
OR REGULAR MAIL ADDRESS:
Signature
J
rirrta '_e* rx
P
r
Date
ReN ised 7 15 2014, 7%2020 15. 11 320 1 4;
Fee Received
Received Date
Received By
G��