Loading...
HomeMy WebLinkAboutWPO201600049 Correspondence 2019-09-12In Jereiv)y Fox From: Emily Cox <ecox2@albemarle.org> Sent: Thursday, September 12, 2019 4:23 PM To: Jeremy Fox Subject: RE: Misc Old Trail WPO bonds Yup! Block 22 still has the regular bond from the development, so this one can be released. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesville, VA 22902 www.albemarle.org From: Jeremy Fox <JFox@roudabush.com> Sent: Thursday, September 12, 2019 4:07 PM To: Emily Cox <ecox2@albemarle.org> Subject: Re: Misc Old Trail WPO bonds Can I go ahead and submit BIRs? They're clearly stabilized -J Fox Roudabush, Gale & Assoc., Inc. On Sep 12, 2019, at 4:04 PM, Emily Cox <ecox2kalbemarle.org> wrote: Yes — we still have bonds on those 2 projects. WP0201600049 and WP0201800079 I believe are the Ws. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 <image001.jpg> 401 McIntire Rd. Charlottesville, VA 22902 www.albemarle.org From: Jeremy Fox <JFox@roudabush.com> Sent: Tuesday, September 10, 2019 1:15 PM To: Emily Cox <ecox2@albemarle.org> Subject: Misc Old Trail WPO bonds 1 Hey Emily, When you have some time can you look into the below to verify we still have bonds out on the erosion for entry feature and block 22 stockpile? If we do I need to submit BIR's to get them released. They have been stabilized/and or removed for some time now. Thanks, - J Fox Roudahush, Gale &Assoc., Inc From: Dave Brockman[mailto:dave@oldtrailvillage.com] Sent: Tuesday, September 10, 2019 1:06 PM To: Bill Ledbetter <BLedbetter@roudabush.com>; Jeremy Fox <JFox@roudabush.com> Subject: B22 WPO bond Hi Guys, We found a cash bond for $52,460 that was posted with the WPO stockpile when we did East Village. I'm not sure anyone remembered we had this posted. Can we get it released if the LC bond has enough to cover the current conditions? While you are looking into this can you ask about the Entry WPO getting released? it is $14,770 �I �I �IEno Old Trail Village Block 22 Ph I Erosion Control C and Stormwater Management Plan PO $52,460.00 $52,460.00 Cash C 2