Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700083 Bond Estimates Erosion Control Plan 2008-01-17
om BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12-5-01 PROJECT NAME: Old Trail Sanitary Sewer Slabtown Branch PROJECT NUMBER: WPO-2007-00083 DATE OF ESTIMATE: 01/17/08 ESTIMATE BY: ADL BASED ON: ESC Plan dated 12/12/07 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.7 1500 4050 SILT FENCE LF 4160 5 20800 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC-2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 5U8 FUTAL 28850.00 CONTINGENCY & ADMINISTRATION LS 25% 7212.50 TOTAL 36062.50 BOND AMOUNT REQUIRED 36000