HomeMy WebLinkAboutWPO201300023 Plan - Other (not approved) 2020-02-12ER06ION AND SEDIMENT CONTROL GENERAL NOTES EROSION AND SEDIMENT MINIMUM STANDARDS 4VAC50-30-40. EROSION AND SEDIMENT MINIMUM STANDARDS 4VAC50-30-40 CONTINUED. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEAOURE5 AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING 51TE DEVELOPMENT UNTIL FINAL ES-1) UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND 1, PERMANENT OR TEMPORARY 601L STABILIZATION SHALL BE APPLIED TO DENUDED AREAS G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, STABILIZATION IS ACHIEVED, SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO WITHIN SEVEN DAYS AFTER FINAL GRADE 15 REACHED ON ANY PORTION OF THE SITE, AND ENERGY D1551PATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES 6. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING MINIMUM STANDARDS AND SPECIFICATIONS OF VIRGINIA EROSION AND SEDIMENT CONTROL TEMPORARY 601L STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING DEVICE, HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 ER06ION AND SEDIMENT CONTROL THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. CHANNEL. REGULATIONS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREA5 THAT ARE TO BE LEFT DORMANT H. ALL ON-61TE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND E5-2) THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE FOR MORE THAN ONE YEAR, I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE ER05ION OR SEDIMENTATION ON AFTER EACH RUNOFFPRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND 2, DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION, BE STABILIZED OR PROTECTED WITH 5EDIMENT TRAPPING MEASURES. THE APPLICANT 15 OR PIPE SYSTEM, OR TO A DETENTION FACILITY. IMMEDIATELY, E5-3) A LAND DISTURBANCE PERMIT 15 REQUIRED PRIOR TO INITIATING ANY SITE- WORK. REOPON61DLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN 10, ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA, ES,-4) A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE STOCKPILES ON SITE AS, WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA, EARTH FILL MAINTAINED ON THE 51TE AT ALL TIMES. FROM THE PROJECT SITE, BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER ES-5) THE CONTRACTOR 15 RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT DEBRIS, CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS, DETERMINED OTHERWISE PERMANENTLY STABILIZED, PERMANENT VEGETATION SHALL NOT BE CONSIDERED REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING 12. BORROW OR WASTE AREA5 ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER BY THE PLAN APPROVING AUTHORITY. ESTABLISHED UNTIL A GROUND COVER 15 ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO CALCULATIONS. ZONING ORDINANCE SECTION 5.1.28. E6 ES-6) PRIOR TO COMMENCINGING AND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED SURVIVE AND WILL INHIBIT EROSION. K. ALL MEA5URE5 USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN 4. SEDIMENT BA61N5 AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-51TE BORROW OR WASTE AREAS), MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED A6 A FIRST STEP IN ANY INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE, OF THE CODE OF ALBEMARLE. THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UP5LOPE LAND 14, BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL TO THE LOCAL PLAN APPROVING AUTHORITY. DISTURBANCE TAKES PLACE. GENERAL NOTES BE LIMITED TO THE HOURS OF 7;OOAM TO 9;OOPM, ES-7) EROSION AND SEDIMENT CONTROLS SHALL BE CONSTRUCTED AS A FIRST STEP IN 5. STABILIZATION MEA5URE5 SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, G1.) THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE ANY LAND DISTURBING ACTIVITY. EARTHEN STRUCTURES SHALL BE SEEDED IMMEDIATELY DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT 15, BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN UPON INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED LOCATION OF ALL UTILITIES BEFORE COMMENCING WORK AND FOR ANY DAMAGES THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL E6-8) PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. OCCUR BY H15/HER FAILURE TO LOCATE OR PRESERVE THESE UTILITIES, IF, DURING DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE, A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER CONSTRUCTION, THE CONTRACTOR SHOULD ENCOUNTER UTILITIES OTHER THAN TH06E SHOWN BECAUSE OF SLIDES, SINKING, OR COLLAPSE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN 7 DAY5 TO DENUDED AREA5 THAT ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LE56 THAN ON THE PLANS HE/SHE SHOULD NOTIFY THE ENGINEER AND TAKE NECESSARY AND PROPER 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS, THREE ACRES. STEPS TO PROTECT THE FACILITY AND ASSURE THE CONTINUANCE OF SERVICE. CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT B. SURFACE RUNOFF FROM DISTURBED AREA5 THAT 15 COMPRISED OF FLOW FROM DRAINAGE G2.) ANY DI6CREPANCIE6 FOUND BETWEEN THE DRAWINGS AND SITE CONDITIONS OR ANY EROSION CONTROL MEASURES REQUIRED BY TH15 PLAN REGARDLESS OF THE SALE OF ANY FOR MORE THAN ONE YEAR. AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A 5EDIMENT DISCREPANCIES OR AMBIGUITIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY, ES-9) ALL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS ENGINEER, WORK DONE BY THE CONTRACTOR WITHOUT DIRECTION AFTER THE DISCOVERY OF 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS MEASURES. PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE SUCH INCONSISTENCIES SHALL BE DONE AT THE CONTRACTOR'5 RISK. TO BE AT 75 LBO/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A E5-10) A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. G3,) ALL CONSTRUCTION SHALL CONFORM TO ALBEWLE COUNTY AND THE VIRGINIA 50/50 MIX OF ANNUAL RYEGRA65 AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO OTHERWISE PERMANENTLY STABILIZED, PERMANENT VEGETATION SHALL NOT BE CONSIDERED RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS. CONSTRUCTION OF CON615T OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CON515T OF GERMAN MILLET. ESTABLISHED UNTIL A GROUND COVER 15 ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN 15 SANITARY SEWER AND WATER SERVICES 5HALL CONFORM TO THE VIRGINIA DEPARTMENT OF STRAW MULCH 15 TO BE APPLIED AT 80LB6/1006F. ALTERNATIVES ARE SUBJECT TO SURVIVE AND WILL INHIBIT EROSION, E5-11) THE ROADWAY 5HALL BE STABILIZED BY THE APPLICATION OF STONE BASE UPON UTILIZED. 7. CUT AND FILL SLOPES 5HALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL HEALTH STANDARDS AND SPECIFICATIONS AND ALBEMARLE COUNTY SERVICE AUTHORITY APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. REACHING FINAL GRADE. CHECK DAM5 SHALL BE INSTALLED IN ALL DITCHES IMMEDIATELY MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE GENERAL CONSTRUCTION SPECIFICATIONS. 16. PERMANENT STABILIZATION 5HALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND UPON THE GRADING IN OF SAME, YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING G4J ALL CONSTRUCTION SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LB5/10006F, E6-12) CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT MEASURES UNTIL THE PROBLEM 15 CORRECTED. REQUIREMENTS : WITH THE 2009 UNIFORM STATEWIDE BUILDING CODE (U513C) AND ICC/AN61 INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL, FERTILIZER 5HALL BE APPLIED AT WILL MINIMIZE ER05ION, 5-LOPE5 THAT ARE FOUND TO BE ERODING EXCE661VELY WITHIN 8. CONCENTRATED RUNOFF GHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLE65 A117.1 2003, 1000LB6/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL ONE YEAR OF PERMANENT STABILIZATION 5HALL BE PROVIDED WITH ADDITIONAL SLOPE CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE G5,) CONSTRUCTiON LIMITS SHALL BE PROPERTY LINES OR AS INDICATED ON THE PLAN. BE APPLIED AT 180LB6/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND STABILIZING MEA5URE5 UNTIL THE PROBLEM 15 CORRECTED. DRAIN STRUCTURE, 66.) ALL FINAL GRADING, SEEDING, SODDING AND/OR PAVING SHALL BE DONE IN SUCH A 0-5% PERENNIAL RYEGRA65 OR KENTUCKY BLUEGRASS. STRAW MULCH 15 TO BE APPLIED E6-13) CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLE65 9, WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER MANNER TO PRECLUDE PONDING OF WATER ON THE SITE. AT 8OL136/1005F, ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY ER05ION CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE PROTECTION SHALL BE PROVIDED, G7.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ALL NECESSARY PERMITS CONTROL INSPECTOR. DRAIN STRUCTURE. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE BEFORE THE START OF CONSTRUCTION. 19. I FTER EACH INSPECTED WEEKLY NTOABE ETO STORM INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED 60 THAT 5EDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM �,) THE CONTRACTOR SHALL NOTIFY MISS UTILITY (1-800-552-7001) 48 HOURS PRIOR RAINFALL. ANY DAMAGE OR CLOGGING STTRUCTURAL MEASURES 5E REPAIR PROTEALL PROTECTED 50 THAT PEDIMENT LADEN WATER CANNOT ENTER THE STORM WATER WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. TO EXCAVATION. IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WFIEN 50% OF THE WET STORAGE VOLUME IS CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE 11. BEFORE NEWLY CONSTRUCTED 6TORMWATER CONVEYANCE CHANNELS OR PIPES ARE 69.) THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ELECTRICAL, TELEPHONE AND FILLED WITH SEDIMENT. ALL SEEDED AREA5 ARE TO BE RESEEDED WHEN NECESSARY TO SEDIMENT. MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR CAN SERVICES. ACHIEVE A GOOD STAND OF GRASS, SILT FENCE AND DIVERSION DYKES WHICH ARE E5-15) WHEN INSTALLING UTILITY LINES, NO MORE THAN 500 FEET OF TRENCH MAY BE PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND 610,) DISPOSE OF TREES, 6TUMP5 AND OTHER DEBRIS OFF SITE, COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED OPEN AT ONE TIME, AND EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF RECEIVING CHANNEL, 12, WHEN WORK IN A LIVE WATERCOURSE 15 PERFORMED PRECAUTIONS SHALL BE TAKEN 611.) ALL MATERIALS USED FOR FILL SHALL BE FREE OF UNSUITABLE MATERIALS SUCH AS IMMEDIATELY, TRENCHES. TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK WOOD , ROOTS FROZEN MATERIAL ROCKS OR BOULDERS OF UNACCEPTABLE SIZE OR ANY , 20, ALL TEMPORARY EROSION AND 5EDIMENT CONTROL MEASURES ARE TO BE REMOVED E6-16) ALL RIP -RAP SHALL BE INSTALLED OVER FILTER FABRIC. AREA TO THE GRFATE6T EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL OTHER NON -COMPACTING SOIL MATERIALS. WITHIN 30 DAYS OF FINAL 61TE STABILIZATION, WHEN MEA6URE6 ARE NO LONGER NEEDED, E6-17) DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL 612.) A PERMIT MUST BE SECURED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. FILTERING DEVICE. MAY BE USED FOR THESE 6TRUCTURE5 IF ARMORED BY NONERODIBLE COVER MATERIALS. BEFORE ANY WORK IS PERFORMED IN A STATE RIGHT-OF-WAY. 21. THIS PLAN 5HALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR ES-18) ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE 613.) THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-2046.) AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING 617E DEVELOPMENT UNTIL THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING OTHER EQUIPMENT OF MUD PRIOR TO TRAVELING ON A PUBLIC RIGHT-OF-WAY, IT IS THE FINAL STABILIZATION IS ACHIEVED. CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. CONTRACTORS REOPON61DILITY TO CLEAN STREETS AND TO ALLAY DUST AND TAKE ALL 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) E5-19) SILT FENCE, 51LT TRAP AND CHECK DAMS SHALL BE CLEANED OUT WHEN 5EDIMENT 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN MEASURES NECESSARY TO ENSURE c HAT THE ROAD 15 MAINTAINED IN A CLEAN, MUD AND MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION REACHES ONE HALF THE HEIGHT OF THE BARRIER AND WHENEVER DIRECTED BY THE OR CRO561NG LIVE WATERCOURSES, SHALL BE MET, DUST FREE CONDITION AT ALL TIMED DURING CONSTRUCTION, ORDINANCE SECTION 17-2078) COUNTY EROSION AND SEDIMENT CONTROL OFFICIAL. SEDIMENT 5HALL BE IMMEDIATELY 15, THE BED AND BANKS OF A WATERCOURSE SFIALL BE STABILIZED IMMEDIATELY AFTER G14.) DIMENSIONS ARE FROM THE FACE OF CURB UNLE65 OTHER OTHERWISE NOTED. STABILIZED UP GRADIENT OF EROSION AND SEDIMENT CONTROL MEASURES, WORK IN THE WATERCOURSE 15 COMPLETED. 615.) PAINT HANDICAPPED SYMBOL ON PARKING SPACES WHERE SHOWN ON DRAWINGS. ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS ES-20) ALL MEASURES SHALL BE UTILIZED AND CONTINUOUSLY MAINTAINED DURING THE 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING TRAFFIC MARKINGS FOR HANDICAP PARKING SPACES AND ACCESS AISLES SHALL BE BLUE. 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% CONSTRUCTION PERIOD UNTIL ALL DISTURBED AND DENUDED AREAS ARE STABILIZED. NO STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA; TRAFFIC MARKINGS SHALL BE IN CONFORMANCE WITH THE LATEST VIRGINIA DEPARTMENT OF OF OPTIMUM MOISTURE CONTENT, ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL AREA 5HALL REMAIN DENUDED FOR MORE THEN THREE CALENDAR PAYS WHEN A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. TRANSPORTATION AND THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES STANDARDS ENGINEER. A GEOTECHNICAL ENGINEER 15 TO BE PRESENT DURING CONSTRUCTION OF DAMS. CONSTRUCTION IS NOT IN PROGRESS. B. EXCAVATED MATERIAL. SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. AND SPECIFICATIONS, E5-21) THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN G16,) TRAFFIC CONTROL SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST 2. PIPE AND R16ER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ALL NECESSARY REPAIRS OR CLEANUP APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT EDITIONS OF THE VIRGINIA WORK AREA PROTECTION MANUAL AND THE MANUAL OF UNIFORM FACILITIES. TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. TRAFFIC CONTROL DEVICES. 3, FOR TEMPORARY SEDIMENT TRAPS OR BA611\16 WHICH ARE TO BE CONVERTED TO IMMEDIATELY, D. MATERIAL USED FOR 13ACKFILLING TRENCHES 5HALL BE PROPERLY COMPACTED IN ORDER G17,) NOT USED PERMANENT 6TORMWATER MANAGEMENT FACILITIES; CONVERSION 15 NOT TO TAKE PLACE ES,-22) ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED TO MINIMIZE EROSION AND PROMOTE STABILIZATION. G18.) NOT USED. UNTIL THE 61TE IS STABILIZED, AND PERM1561ON HA5 BEEN OBTAINED FROM THE COUNTY WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION, OR AFTER THE MEASURES ARE NO LONGER E. RE6TABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. 619.) ALL FILLS TO BE COMPACTED IN 6" L005E LIFTS TO 98% STD, PROCTOR, EROSION CONTROL INSPECTOR. NEEDED. F. APPLICABLE SAFETY REGULATIONS 5HALL BE COMPLIED WITH. E6-23) THE MAXIMUM SPACING BETWEEN THE CHECK DAMS SHOULD BE SUCH THAT THE 17, WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, G20.) EXISTING SLOPES GREATER THAN 4;1 SHALL BE BENCHED PRIOR TO PLACEMENT OF TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATIONS THE TOP OF THE DOWNSTREAM PROV1610N6 SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR FILL, SITE NOTES; DAM. REFERENCE PLATE 3,20-2. TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT 15 TRANSPORTED ONTO A PAVED OR G21.) CONTRACTOR WILL COMPLETE ALL 51TE WORK; FINAL GRADING, LANDSCAPING, SEEDING, 1. THE PROPERTY SHOWN HEREON IS IDENTIFIED AS A PORTION OF TAX MAP PARCEL PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END PAVING, AND REMOVAL OF DEBRIS. 55E-1-A1, AND IS DESIGNATED AS BLOCKS 20 AND 21 IN THE GENERAL TRAN5ECT OF EACH DAY, SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR 622.) TH16 PLAN HAS BEEN PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND ZONE (CT4) DESIGN GUIDELINE CATEGORY, CON516% OF 5.42 ACRES AND 15 ZONED SEEDING SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL D16POSAL AREA. STREET WASHING DOES NOT NECESSARILY INDICATE ALL ENCUMBRANCES ON THE PROPERTY. NMD - NEIGHBORHOOD MODEL DISTRICT, WITH PROFFERS AND CONDITIONS. SEEDS SHALL BE SCARIFIED INTO THE TOP 2" OF THE TOP SOIL, IF APPLIED BY HAND. SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER, TH16 PROV16ION 623.) ARCHITECTURAL PLANS, 516NAGE PLANS, AND LIGHTING PLANS SHALL BE SUBMITTED 2TH16 PARCEL IS PART OF THE OLD TRAIL VILLAGE; ZMA-04-024 REZONING APPLICATION SEEDING BY HYDRO SEEDING 5HALL BE IN ACCORDANCE WITH VDOT SPECIFICATIONS. SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING BY OTHERS UNDER SEPARATE COVER. ALL ARCHITECTURAL, SIGNAGE, AND LIGHTING APPROVED BY THE ALBEMARLE BOARD OF SUPERVISORS ON 9/14/2005.. ACTIVITIES. INFORMATION SHOWN ON THIS PLAN 15 PROVIDED FOR INFORMATIONAL PURP06E6 ONLY. 18. ALL TEMPORARY ERO510N AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED G24.) BOUNDARY INFORMATION FROM A FIELD SURVEY BY PERKINS � ORRI50N, 3. THE PROP06ED DEVELOPMENT WILL BE SERVED BY PUBLIC WATER AND SEWER. TEMPORARY SEEDING RATES PER ACRE; SEPTEMBER 1 TO FEBRUARY 15: WITHIN 30 DAYS AFTER FINAL 61TE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE 625.) TOPOGRAPHIC INFORMATION FROM A FIELD SURVEY BY PERKINS � ORRI60N. 4. TOPOGRAPHIC 5URVEY SHOWN HEREON 15 THE RESULT OF A FIELD SURVEY PREPARED 40 LBS, ANNUAL RYE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. G26.) PIPE BEDDING SHALL BE PER APPLICABLE VDOT STANDARDS UNLESS OTHERWISE BY PERKINS � ORRISON 07 05 12 AND IS CERTIFIED CORRECT, THE CONTOUR LBS. CEREAL WINTER RYE TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF NOTED, INTERVAL = 2'. VERTICAL DATUM: BASED UPON NAVD88. FE FEBRUARY 15 TO APRIL 30: TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER ER06ION AND SEDIMENTATION. 627.) HDPE PIPE SHALL BE DOUBLE WALL TYPE "5" WITH SMOOTH INTERIOR AND MEET 5. BLOCK BOUNDARY AS, SHOWN HEREON FROM COLLINS ENGINEERING. 0 LB5 ANNUAL RYE 19, PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE AA5HT0 REQUIREMENTS M294. HDPE PIPE BEDDING SHALL BE PER MANUFACTURER'S 6, THE PROPERTY SHOWN HEREON 15 LOCATED IN ZONE "X" UNSHADED (AREA OUTSIDE OF MAY 1T0 AUGUST M 50 LBO. GERMLAN MILLET PROTECTED FROM 5EDIMENT DEPOSITION, ER06ION AND DAMAGE DUE TO INCREASES IN SPECIFICATION. THE 100 YEAR FLOOD HAZARD ZONE) AS DETERMINED BY FEMA AND SHOWN ON PANEL VOLUME, VELOCITY AND PEAK FLOW RATE OF 6TORMWATER RUNOFF FOR THE STATED #51003CO237D, DATED FEBRUARY 4, 2005. FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING DEVELOPMENT; PERMANENT SEEDING RATES PER ACRE; STANDARDS AND CRITERIA: EDENBROOK PARK 7. THIS PLAN DOES NOT CERTIFY TO THE LOCATION OF UNDERGROUND UTILITIES. A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE CONTRACTOR TO VERIFY THE UNDERGROUND UTILITY LOCATIONS WITH MS,. UTILITY AND STANDARD SEEDING RATES FOR ALL 5EA50N6; DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OWNER: ALBEMARLE COUNTY PRIOR TO COMMENCING WITH CONSTRUCTION AND OR LAND (GENERAL SLOPE LE55 THAN 3:1) OR STORM SEWER SYSTEM, FOR TH05E 51TE6 WHERE RUNOFF 16 DISCHARGED INTO A PIPE MARCH MOUNTAIN PROPERTIES LLC DISTURBANCE. 126 LBS. KENTUCKY 31 FESCUE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYOE6 AT THE OUTFALL OF THE PIPE OR PIPE ADDRE56 P 0 BOX 370 8. SEE 61TE PLAN BY PERKINS ORR16ON (5P201300020) FOR PLANIMETRICS, UTILITIES, 20 LBS. OTHER SYSTEM SHALL BE PERFORMED, CROZET VA, 22932-0370 AND GRADING, 13, ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER; STANDARD SEEDING RATES FOR ALL SEASONS (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF PARCEL ID 055E0-01-00-000A1 (GENERAL SLOPE 3;1 OR GREATER) ANALY016 WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING 253.768 AC 106 LB5, KENTUCKY 31 FESCUE DRAINAGE AREA OF THE PROJECT IN QUESTION; OR DB 3612/187 20 LBS. CROWN VETCH (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO ZONED: NMI) 20 LB5. OTHER VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF PROFFERS ZMA-2004-00024 CHANNEL BED OR BANKS, OTHER. MARCH 1 TO MAY 15 ANNUAL RYE (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE MAY 16 TO AUGUST 15 FOXTAIL MILLET OF A TEN-YEAR STORM TO VERIFY THAT 6TORMWATER WILL NOT OVERTOP ITS BANKS AND DEVELOPER: AUGUST 16 TO OCTOBER 31 ANNUAL RYE BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT 6TORMWATER WILL NOT CAUSE EDENBROOK, LLC: C/O THE HUMANITIES FOUNDATION NOVEMBER 1 TO FEBRUARY 28 WINTER RYE EROSION OF CHANNEL BED OR BANKS; AND 474 WANDO PARK BLVD. - SUITE 103 (C) PIPES AND STORM SEWER 5Y5TEM6 SHALL BE ANALYZED BY THE USE OF A TEN-YEAR MT. PLEASANT, SC 29464 ALL SEASONS; STORM TO VERIFY THAT 6TORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM, SHEET I�®�� FERTILIZER LB5. 10-20-10 C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE 2 TO LIME 2 TONS CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL 1. COVER SHEET MULCH 2 TONS THRASHED WHEAT 6"TRAP (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT PLANS 2. PHASE I EROSION & SEDIMENT CONTROL PLAN OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE 3. PHASE II EROSION & SEDIMENT CONTROL PLAN EC-2 ER05ION BLANKET (VESCH TREATMENT ONE). GENERALLY NOT USED IN DITCHES WITH BED OR BANKS; OR PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND 4. STORMWATER MANAGEMENT PLAN A VELOCITY OF OVER 4 FPS. (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION, EC-2 SOIL RETENTION MATS SHALL CONSIST OF A MACHINE PRODUCED MAT OF WOOD CONTAINED WITHIN THE APPURTENANCE5; OR 2, ALL EROSION AND SEDIMENT CONTROL MEASURES, WILL BE CONSTRUCTED AND MAINTAINED 5. EROSION & SEDIMENT CONTROL NOTES & DETAILS EXCELSIOR OR MANMADE FIBER THAT SHALL INTERTWINE OR INTERLOCK, MATS SHALL BE OF (3) DEVELOP A SATE DE516N THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND 6. STORMWATER MANAGEMENT NOTES & DETAILS CON516TENT THICKNESS WITH FIBER EVENLY DISTRIBUTED OVER ITS ENTIRE AREA AND RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALL6 INTO A NATURAL SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND 7. R-TANK DETAILS COVERED ON THE TOP AND BOTTOM SIDE WITH NETTING HAVING A HIGH WEB STRENGTH CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A SEDIMENT CONTROL REGULATIONS. 8. STREAM SUFFER MITIGATION PLAN (NOT GLUED BUT MACHINE SEWN). TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALL5 INTO A MAN-MADE CHANNEL; OR "f0 EC-3 ER06ION BLANKETS (VESCH TREATMENT TWO) CAN BE USED IN DITCHES FROM 4 TO (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, 6TORMWATER DETENTION OR OTHER 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE BE PLACED PRIOR TO OR AS, g. DRAINAGE DIVIDE MAPS 10 FPS, MEASURES WHICH 15 6AT15FACTORY TO THE PLAN -APPROVING AUTHORITY TO PREVENT THE FIRST STEP IN CLEARING, 10. STORMWATER MANAGEMENT DRAINAGE DIVIDES MAPS EC-3 EROSION BLANKETS MUST BE A THREE PIMEN51ONAL GEOMATRIX OF UV 5TABILIZED DOWNSTREAM EROSION, 4. A COPY OF THE APPROVED ER06ION AND SEDIMENT CONTROL PLAN SHALL BE NYLON, POLYETHYENE OR POLYPROPHYLENE SEWN WITH UV STABILIZED POLYESTER THREAD D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMI6510N TO MAKE THE IMPROVEMENTS, MAINTAINED ON THE SITE AT ALL TIMES. TO FORM A MAT. NAG C350 OR P300, MIROMAT HEAVYWEIGHT AND ENKAMAT 7012 ARE E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED 5, PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON SOME OF THE PRODUCTS THAT FIT THI5 DESCRIPTION. CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT, THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE F. IF THE APPLICANT CHO06E5 AN OPTION THAT INCLUDES 6TORMWATER DETENTION, HE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY ER05ION CONTROL PLAN TO THE OWNER FOR SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY, DETENTION FACILITIES, THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. 6. THE CONTRACTOR 16 RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. EXISTING - 1340 ------------ X 1350.6 8"SS- - - -W J - 0 _ =X UE -OE - -G (0 w GOLF DRIVE Q o 6 SITE r z rn P RpGKF15N GP' a� c� w o� SPOT ELEVATION STORM SEWER SANITARY SEWER � MANHOLES WATER LINE, VALVE 4 FIRE HYDRANT WATER METER DUAL WATER METER FENCE UNDERGROUND ELECTRIC LINE OVERHEAD ELECTRIC LINE GAS LINE EDGE OF PAVEMENT CURB (CG-2) CURB AND GUTTER (CG- 6) REVERSE CURB AND GUTTER (CG-6R) TRANSITION CURB PROPERTY LINE TREELINE EXISTING TREES TO BE PROTECTED PRESERVED COUNTY APPROVAL BLOCK ALBEMARLE COUNTY SERVICE AUTHORITY DATE 27 GREEN HILL DRIVE, FOREST, VIRGINIA 24551 PHONE:434-525-5985 FAX:434-525-5986 EMAIL: pno@perkins-orrison.com PO BOX 1567 17 W. NELSON STREET LEXINGTON, VIRGINIA 24450 PHONE:540-464-9001 FAX:540-464-5009 EMAIL: pno@perkins-orrison.com CONSULTANTS SEAT_: 2� ,��TH RUSSELL 6AASON Li1N d- 031849 A-\ � S�IONAL JOD: EDENBROOK PARK WATER PROTECTION PLS -o - , WMA CLIENT: EDENBROOK L.L.C. C/O THE HUMANITIES FOUNDATION DEPARTMENT OF ENGINEERING DATE rK) 13 PER REVIEW COMIMEW5 E DESCRIPTION PLANNING AND COMMUNITY DEVLOPMENT - - PATE - MARCH 21, 2013 TERVAL::DEPARTMENT OF ZONING DATE GGW : RHO FIRE/RESCUE DIVISION DATE SHEET TITLE BUILDING OFFICIAL - - - - DATE _ - COVER GROUNDWATER PROGRAM AUTHORITY _ -- DATE E911 ADDRESSING COORDINATOR DATE THOMAS JEFFERSON HEALTH DISTRICT DATE I SHEET JOB NO.: SHEET NO VDOT - --- -- - Y- DATE 12221 1 or 1 � ID - P:\2012\12221\dwg\C-E5- PLOT- I2221,dwg - Thu, 1 Aug 2013 - 10:22 I D - P;\ 2012\ 1 2221 \ dwg\ C - ES-- PLOT- 12221 , dwg - Thu, 1 Aug 2013 - 10:22 ID - F:\2012\ 12221 \dwg\ C - E5 - PLOT- 12221 , dwg - Thu, 1 Aug 2013 - 10; 22 V - P:\ 2012\ 12221 \ dwg\ C - F5 - PLOT- 12221 , dwg - Thu, 1 Aug 2013 - 10:22 ER06ION AND SEDIMENT CONTROL NARRAT PROMPTLY TO PREVENT DAMAGE TO THE GRASS. SEDIMENT DEPOSITED IN RIPRAP AND CONCRETE -LINED - CHANNELS SHOULD BE REMOVED WHEN IT REDUCES THE CAPACITY OF THE CHANNEL," TEMPORARY z TEMPORARY PROJECT DESCRIPTION: 8, OUTLET PROTECTION (VESCH# 3,18): FILL DIVERSION :2 DIVERSION DIKE THIS PROJECT PROPOSES THE CONSTRUCTION OF 84 APARTMENTS WITH ASSOCIATED PUBLIC UTILITIES, OUTLET PROTECTION 16 PROP06ED AT THE OUTLET OF ALL PIPES ON THE 51TE TO SLOW VELOCITIES v._ 6TORMWATER MANAGEMENT, PUBLIC STREETS, AND PARKING IN THE OLD TRAIL VILLAGE DEVELOPMENT, THIS AND PREVENT SCOUR THROUGHOUT THE ENTIRE PROJECT. OUTLET PROTECTION SHALL BE INSTALLED ON 21 m PROJECT IS DESIGNATED A5 BLOCKS 20 AND 21 IN THE GENERAL TRANSECT ZONE DESIGN GUIDELINE ALL NEW STORM SYSTEMS BEFORE THE SYSTEM IS MADE OPERATIONAL, "ONCE A RIPRAP INSTALLATION ;' CATEGORY CONSISTING OF 5.42 ACRES AND IS ZONED NEIGHBORH04U MODEL DISTRICT, IT 15 ANTICIPATED HAS BEEN COMPLETED IT SHOULD REQUIRE VERY LITTLE MAINTENANCE, IT SHOULD HOWEVER BE THAT CONSTRUCTION WILL BEGIN IN LATE SPRING/EARLY SUMMER 2013 AND BE COMPLETED IN A YEAR. INSPECTED PERIODICALLY TO DETERMINE IF HIGH FLOWS HAVE CAUSED SCOUR BENEATH THE RIPRAP OR � a 0 APPROXIMATELY 5.53 ACRES WILL BE DISTURBED DURING CONSTRUCTION. AT THE COMPLETION OF THIS FILTER FABRIC OR DISLODGED ANY OF THE STONE. CARE MUST BE TAKEN TO PROPERLY CONTROL TEMPORARY RIGHT-OF-WAY �.z..... PROJECT, APPROXIMATELY 2.91 ACRES OF IMPERVIOUS AREA WILL BE ADDED, ALL PERIMETER CONTROL SEDIMENT -LADEN CONSTRUCTION RUNOFF WHICH MAY DRAIN TO THE POINT OF THE NEW INSTALLATION,0 DIVERSIONS a WILL BE INSTALLED AS THE FIRST STEP IN CONSTRUCTION AND ADDITIONAL CONTROLS WILL BE INSTALLED IF REPAIRS ARE NEEDED, THEY SHOULD BE ACCOMPLISHED IMMEDIATELY," AS NEEDED AND WARRANTED. EDGE OF FILL VDOT #1 � m 9, SURFACE ROUGHENING (VESCH# 3,29); COARSE AGGREGATE SURFACE ROUGHENING 15 PROPOSED ON ALL CUT AND FILL SLOPES ON SITE TO ASSIST WITH SEEDING - �i�i EX16TING CONDITIONS: , \\ \\` \` \` \ I AND SLOPE STABILIZATION,., ,,,,,/\j,\,\�\,j\\/�\,j/\\�j\\,j\\ \j,\\�\,�\,% 27 GREEN HILL DRIVE, FOREST, VIRGINIA24551 THE SITE CURRENTLY IS A PARTIALLY WOODED, PARTIALLY OVERGROWN PASTURE, AND PARTIALLY 10, TREE PRESERVATION AND PROTECTION (VE6CH# 3,38): MAINTAINED GRASS AREA IN THE OLD TRAIL DEVELOPMENT. AN UNNAMED TRIBUTARY TO 6LABTOWN BRANCH ` i �\i`\�`i '�I I `i`-%`\i;`% "," PHONE: 434-525-5985 FAX: 434-525-5986 TREE PRESERVATION AND PROTECTION 15 PROPOSED ON SPECIFIC TREES IN THE PROJECT AREA, TREES i\i i\\i\i\ \ \ \ \ \ \ FLOWS FROM NORTHWEST TO SOUTHEAST ADJACENT TO THE 517E WIT'ri A SMALL BRANCH BEGINNING ON OUTSIDE THE LIMITS OF CLEARING AND GRADING SHALL BE PROTECTED FROM DAMAGE DURING � � �\ \����\��j�</--\ .",`\%\\\/\\/ / EMAIL: pno@perkins orrison.com ��, �, g MINIMUM THE SITE, THERE IS A 100' STREAM BUFFER A550CIATED WITH THE TRIBUTARY AND FINGER BRANCH, CONSTRUCTION, TREE PRESERVATION AND PROTECTION 15 SPECIFICALLY NOT SHOWN ON SOME TREES SLOPES VARY WIDELY, RANGING FROM 2:1 TO LESS THAN 24:1. THE 'SITE GENERALLY DRAINS TO THE BECAUSE WORK MUST BE DONE BETWEEN THE TRUNK AND THE DRIP EDGE. -- PO BOX 1567 17 W. NELSON STREET LEXINGTON, VIRGINIA 24450 SOUTH TO THE TRIBUTARY, WITH THE EXCEPTION OF THE OLD TRAIL DRIVE STORM SEWER AND FINGER 't TYPICAL GRAVEL STRUCTURE PHONE:54O-464-9001 FAX:54O-464-5009 BRANCH, THERE ARE NO DRAINAGE CONVEYANCES ON THE SITE. OVERALL, THE 517E HA5 ESTABLISHED VEGETATIVE PRACTICES;, �-� - - M t- -� EMAIL: pno@perkins-orrison.com VEGETATION ON THE MAJORITY OF THE SITE, THE ENGINEER RECOMMENDS THAT THE OWNER AND/OR NOTE: QUOTED MAINTENANCE PROCEDURES ARE FROM THE VIRGINIA EROSION AND SEDIMENT CONTROL � 1992 3.07 � CONTRACTOR HAVE THE CLEARING LIMITS MARKED IN THE FIELD BY A SURVEYOR USING STANDARD SURVEY HANDBOOK -THIRD EDITION-1992, PLEASE REFER TO THE VIRGINIA EROSION AND SEDIMENT CONTROL O GRAVEL AND WIRE MESH I OMPRCTED 501E MARKINGS PRIOR TO THE START OF CONSTRUCTION, SEE STORMWATER MANAGEMENT SECTION FOR HANDBOOK -THIRD EDITION FOR SPECIFICS ON EACH MEASURE,Fifimpom DROP INLET SEDIMENT FILTER P16CU66ION OF PRE -DEVELOPED DRAINAGE, 1, TOP501LING (VESCH# 3,30) . . .® o ® '\�" PRIOR TO PERMANENT SEEDING (FINAL PHASE), TOPSOIL SHALL BE PLACED OVER ALL DISTURBED AREAS `�%�� �' �,/%' GO�IU LTP�NTS ADJACENT PROPERTY: RUNOFF WATER GRAVEL (12 MIN. DEPTH) , \\ \ \ \/ jn\/\\,\\,\\,\\, TO BE SEEDED OR LANDSCAPED. Paved construction entraince for erosion control pl<tna ' �° WITH SEDIMENT \\ ,/\\\\\\\\\//\\/\\//\\//\\//\\//\\/\\/\//\<",/ THE SITE IS BORDERED BY OLD TRAIL DRIVE TO THE NORTH AND BY THE REMAINING LAND OF MARCH 2. TEMPORARY SEEDING (VESCH# 3,31): •' 6 a ��\�,\��\,�\�\�\\�r�\\�\\i\\��\\,\r\\r\i,�i MOUNTAIN PROPERTIES, LLC ON ALL REMAINING SIDES. A WELL MAINTAINED CONSTRUCTION ENTRANCE BUILT TEMPORARY SEEDING 16 PROPOSED IN AREAS THAT ARE NOT READY FOR PERMANENT STABILIZATION BUT 18 MIN, ,/ ;1,\\�%\�%\\��\\� WITH THE COUNTY REQUIRED PAVED WASH RACK SHOULD PREVENT SEDIMENTATION ON OLD TRAIL DRIVE --------.-- ------ ' `'"'. ----- _ CCN�TRUCTI®N ®I�ERATION� REL�,TIVE 8' M�illwm FROM CONSTRUCTION TRAFFIC THE UNNAMED TRIBUTARY TO SLABTOWN BRANCH IS TO THE SOUTH OF THE WILL NOT BE DISTURBED FOR A PERIOD OF 30 DAYS OR LONGER (ALL PHASES), ALL TEMPORARILY , .� ,If SITE AND WILL BE PROTECTED BY SEDIMENT TRAPS AND DIVERSIONS AS SHOWN ON THE PLAN, SEEDED AREAS SHALL BE INSPECTED PERIODICALLY TO ENSURE A GOOD STAND OF VEGETATION, ANY - 1 TC TIE LCCATI®N ®� RR®TECTEC TREE BARREN AREAS SHALL BE RESEEDED IMMEDIATELY. WATER SEEDED AREAS A5 NEEDED, THE TEMPORARY ">_ > _r v� �, r v� >>a�� 9 TYPICAL EARTHEN STRUCTURE OFF -SITE AREAS: 6EEDING MIX AND APPLICATION RATES ARE SHOWN ON THE PLANS. � , a '� - �' F Source: Va. 6WCC Plate 3.11-1 NEITHER A BORROW NOR SPOIL AREA WILL BE NEEDED FOR THIS PROJECT; HOWEVER, SHOULD THE NEED 3, PERMANENT SEEDING (VESCH# 3,32): ��K 1 1 \fir .rj ..t �f r rt _1 1 F NCING AND ARMOR NG PERMANENT SEEDING IS PROPOSED FOR THE ENTIRE 517E ONCE FINAL GRADE IS REACHED OR FOR , r ,�1 N, FOR A BORROW OR SPOIL 517E ARISE, THEN THAT 517E WILL BE REQUIRED TO BE PERMITTED BY AREAS THAT WILL NOT BE D16TURBED FOR A PERIOD LONGER THAN 6 MONTHS (ALL PHASES), ALL ALBEMARLE COUNTY. PROFILE' ' .. PERMANENTLY SEEDED AREAS SHALL BE INSPECTED PERIODICALLY TO ENSURE A GOOD STAND OF ,''•. °31 .4 SOILS: VEGETATION, ANY BARREN AREAS SHALL BE RESEEDED IMMEDIATELY, WATER SEEDED AREAS AS NEEDED. SEDIMENT FILTERED WIRE MESH 60ME OF "H-IE SOLO ON THIS 611E HAVE BEEN PREVIOUSLY DISTURBED BY GRADING OPERATIONS; THE PERMANENT SEEDING MIX AND APPLICATION RATES ARE SHOWN ON THE PLANS. "EVEN WITH ,,,,rt WATER 1092 3.13 r CAREFUL, WELL -PLANNED SEEDING OPERATIONS, FAILURES CAN OCCUR, WHEN IT 15 CLEAR THAT PLANTS ,.� TEMPORARY SEDIMENT TRAP HOWEVER, ACCORDING TO THE NRC5 WEB SOIL SURVEY THERE ARE 3 501E TYPES OF THE SITE; DYKE r a - SPECIFIC APPLICATION HAVE NOT GERMINATED ON AN AREA OR HAVE DIED, THESE AREAS MUST BE RESEEDED IMMEDIATELY TO < SILT LOAM, ABBREVIATED 258, DYKE CLAY LOAM, ABBREVIATED 26C3, AND I-iAYESVILLAGE LOAM, =_ = C`� ,, �� �.- .::-. -� �'- � WIDTH -W ABBREVIATED 36C. DYKE SILT LOAM HAS 2 TO 7 PERCENT SLOPES, IS WELL DRAINED, AND HAS A KSAT PREVENT ER06ION DAMAGE, HOWEVER, IT 15 EXTREMELY IMPORTANT TO DETERMINE FOR WHAT REASON : � , THIS METHOD OF INLET PROTECTION IS APPLICABLE ORIGINAL RANGING FROM 0,57 TO 1.98 IN/HR, DYKE CLAY LOAM HAS 7 TO 15 PERCENT SLOPES, 16 WELL GERMINATION DID NOT TAKE PLACE AND MAKE ANY CORRECTIVE ACTION NECESSARY PRIOR TO h �Ti r 2 'i r _�I _ WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED, GROUND 1 W-1 BUT NOT WHERE PONDING AROUND THE STRUCTURE ELEV. RESEEDING THE AREA, HEALTHY VEGETATION 16 THE M06T EFFECTIVE ER06ION CONTROL AVAILABLE." � �. sue- �{ Z. _ i „i mr ;;r_,, I MIGHT CAUSE EXCE661VE INCONVENIENCE OR DAMAGE TOP ELEV. _ DRAINAGE, AND HAS A KSAT RANGING FROM 0.57 TO 1,98 IN/HR, IIAYESVILLAGE LOAM HAS 7 TO 15 4. MULCHING (VESCH# 3,35) rr t ` � TO AD,WCENT STRUCTURES AND UNPROTECTED AREAS. ' PERCENT SLOPES, 16 WELL DRAINED, AND HAS A K6AT RANGING FROM 0,57 TO 1,98 IN/HR, ALL THREE �'���,s��prl t SPILLWAY ELEV. T_- MULCHING 15 TO BE PLACED OVER ALL DISTURBED AREAS THAT HAVE BEEN SEEDED (TEMPORARY OR J I *GRAVEL SHALL BE VDOT #3, #357, OR #5 COARSE, - 601L6 ARE HYDROLOGIC SOIL GROUP B, - i - _ n -A PERMANENT) TO PROVIDE PROTECTION FOR THE SEED, STRAW MULCHING MUST BE ANCHORED. - `` t AGGREGATE - S2 , � ,< 67 �U.YLL/ACRE <C CRITICAL EROSION AREAS: MULCHING APPLICATION RATES ARE SHOWN ON THE PLAN, "ALL MULCHES AND SOIL COVERINGS SHOULD �j ' -- I A II , 1-III PLATE 3.0'7-2 - Lu 2Z CRITICAL EROSION AREAS ARE ALL SLOPES STEEPER THAN 3:1, THE 501 STREAM BUFFER, ANU THE 10U ZE BE INSPECTED PERIODICALLY (PARTICULARLY AFTER RAINSTORMS) TO CHECK FOR EROSION, WHEN -) r.t:"' i, E- am 1�2 3.D% - -- rErt�,r , STREAM BUFFER. THE CONTRACTOR SHALL HAVE THE 501 STREAM BUFFER FLAGGED BY A SURVEYOR EROSION 15 OBSERVED IN MULCHED AREAS, ADDITIONAL MULCH SHOULD BE APPLIED, NETS AND MATS 1 ' BLOCK AND GRAVEL CURB INLET 67 CU.YD./ACRE USING STANDARD SURVEY MARKINGS PRIOR TO THE START OF CONSTRUCTION. IT i� RECONifv1 (�fD�D THAT SHOULD -- INSPECTED AIR .--RAIN ORS FOR ®15LgCATION 4R FAILURE, IF 1V fi9UT6 OR BREAKAGE ELA?� SEDIMENT FILTER (EXCAVATED) THE CONTRACTOR HAVE THE TOOT STREAM BUFFER FLAGGED BY A SURVEYOR USING STANDARD SURVEY OCCUR, RE -INSTALL NETTING OR MATTING A5 NECESSARY AFTER REPAIRING DAMAGE TO THE SLOPE OR ao � MARKINGS PRIOR TO THE START OF CONSTRUCTION TO PREVENT DISTURBANCE IN THIS BUFFER AREA NOT DITCFI, INSPECTIONS SHOULD TAKE PLACE UP UNTIL GRASSES AREA FIRMLY ESTABLISHED, WHERE MULCH a NO ` **COARSE AGGREGATE ORIGINAL VDOT CL. I RIP -RAP GROUND 16 USED IN CONJUNCTION WITH ORNAMENTAL PLAMINGS, INSPECT PERIODICALLY THROUGHOUT THE YEAR 'I' �. ` t ,r �1 '' ;'1. El�v. SHOWN ON THE APPROVED PLANS. 61-OPEO SHALL BE SURFACE ROUGHENED AND SEEDED IMMEDIATELY 3 r ` Ix' t FILTER CLOTH 5EA0: TO DETERMINE IF MULCH 15 MAINTAINING COVERAGE OF THE SOIL SURFACE; REPAIR A5 NEEDS." r'Yr�'r®RR��T tu9�if�®®S ®F TREE FENCING AFTER THE COMPLETION OF GRADING WITH SEEDING AND MULCHING AS INDICATED ON THE PLANS, FAILURE ,1„ v+ ,f .,I F ,ty.= r k�` �Q ; - CRcr�S SECTION OF OUTLET °�� TO STABILIZE THE 511E WILL RESULT IN BLANKET MATTING BEING REQUIRED FOR ALL SLOPES STEEPER PERMANENT STABILIZATION: ��. '�\ THAN 3:1. /' `' '� ;�>r ONCE THE 61TE HAS BEEN BROUGHT TO FINAL GRADE AND GRAVEL HA5 BEEN PLACED, TOPSOIL SHALL BE r F� ,_; I .. �_ DIVERSION DIKE o �N TH 0� ��\� SPREAD ON ALL DISTURBED AREAS EVENLY, FERTILIZER, SEED, AND A COVERING SHALL THEN BE SECTION A -A If,II; %I' " <��11 C) EROSION AND SEDIMENT CONTROL MEASURES: VDOT CL. I RIP -RAP ®`O;r-`m ����, �� I INSTALLED IN ACCORDANCE WITH PERMANENT SEEDING (VESCH# 3.32) FOLLOWING APPLICATION RATES CURB **COARSE AGGREGATE , z" �' �% �--� ALL MEASURES SHALL BE INSTALLED AND MAINTAINED PER THE VIRGINIA EROSION AND SEDIMENT CONTROL SHOWN ON THE PLAN. SOIL TESTING SHALL BE DONE TO DETERMINE THE CORRECT RATE OF FERTILIZER, :A mituiuinn wdev tap of t inch tuu>t be inshtlecl �e*Ilh a 111"tnunt 1 inch balkocl INLET FILTER CLOTH-�,;�;°°i°'°°, �-® �, � � rI HANDBOOK, THE CONTRACTOR SHALL NAME A RESPONSIBLE LAND DISTURBER (RLD), WHO WILL BE ROADS AND TRAVEL WAYS WILL BE STABILIZED ACCORDING TO THE PLAN WITH ASPHALT, CONCRETE, OR shut df vah:e ,, Gmpplyhm a wa,:lr lto;y ��'ith a tliatttete, cst 1. urcl►u. fcu ;ides iidrte °a',r° r °�'i O � ^' RE5PON51BLE FOR INSTALLING EROSION AND SEDIMENT CONTROLS AS Tl IE FIRST STEP IN CONSTRUCTION, 1 \ - °r , °'ia ° `� GRAVEL. THE SURFACES SHALL BE INSTALLED ACCORDING TO THE DETAILS SHOWN ON THE PLANS AND caust:uit plea ure. �t lr trot r must be carried a .3:-#rot z the entrance to art '(�� � ',°'° � a ° -- RUSSELL :C�RRISON � A5 RIEN SHALL BE RESPONSIBLE FOR ADDITIONAL CONTROL AS NEEDED AND A5 SHOWN ON THE PLAN, SPECIFICATIONS• at>Inoved settlul = area to Ietttre, e sectutjent. <Alt edu-neat s_hatl be piev, ,itecifrom I - Vo�, ° ®9®�®® ®��- _ AND FOR MAINTENANCE OF ALL CONTROLS THROUGH CONSTRUCTION ACTIVITIES. THE RLD SHALL INSTAL I_ entetnrg st��lrrr (1-1airl , ditches, ur Nvatercom-se;�. �� / / ° , , -o-® Lic. 031849 ADDITIONAL CONTROLS AS DIRECTED BY THE ENGINEER AND THE COUNTY, AND AS 61TE CONDITIONS eo I / - � / / / / / fill °a°'° i -- x 6TORMWATER MANAGEMENT: , / / / / / / / , ,a,,a°,r,, loko WARRANT, 6TORMWATER MANAGEMENT IS ACCOMPLISHED THROUGH THE USE OF FOUR BIORETENTION FILTERS WITH P��®�� 00 CORRECT TRUNK ARMORING Wool) STUD , / / / / / / / ,i°,','l'a;,a,°1' Va R-TANK HD OR EQUAL STORAGE CHAMBERS UNDERNEATH THE MEDIA, THEY ARE DENOTED ON THE PLAN .`:`,"::.`` :` '' :,-,...: o / / / / / ,',''rI°,'' '+S �a� STRUCTURAL PRACTICES; _ / / / °° NOTE: QUOTED MAINTENANCE PROCEDURES ARE FROM THE VIRGINIA EROSION AND SEDIMENT CONTROL AS BIO-FILTER A, B, C, AND D. ALL STORM SEWER INLETS AND SYSTEMS WERE DESIGNED U51NG THE TRIANCUI�R l®AR® FENCE , / / / / / / / / a ,,',°� S�ONAL HANDBOOK -THIRD EDITION-1992, PEASE REFER TO THE VIRGINIA EROSION AND SEDIMENT CONTROL RATIONAL METHOD AND ARE IN ACCORDANCE WITH VDOT POLICY. PLEASE SEE INLET CALCULATIONS AND va g o a `k�� / j j % / / / / �' HANDBOOK -THIRD EDITION FOR SPECIFICS ON EACH MEASURE, ANALYSIS, STORM SEWER CALCULATIONS, AND ROOF DRAIN CALCULATIONS ATTACHED WITH THIS NARRATIVE, �����®� �N® ��®���i�T ®���®L ������ ) § o r / / ®/ / / 1, CONSTRUCTION ENTRANCE VESCH# 3.02 : / i / / ( ) FOR 6TORMWATER QUALITY MANAGEMENT, THIS 517E FALLS INTO SITUATION 2 IN THE PERFORMANCE BASED TEMPORARY PAVED ** COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 , A CONSTRUCTION ENTRANCE 16 PROPOSED TO PREVENT SEDIMENT FROM BEING DEPOSITED ON ANY METHOD IN THE VIRGINIA 6TORMWATER MANAGEMENT HANDBOOK. THE APPLICABLE AREA FOR THIS SITE 16 CONCRETE BLOCK PUBLIC ROAD BY CONSTRUCTION TRAFFIC THROUGHOUT THE ENTIRE PROJECT, THIS MEASURE SHALL BE 6,14 ACRES (THE PIGTURBED AREA SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN AND 3.02 CONSTRUCTION CE A WIRE SCREEN � :CH OUTLET (PERSPECTIVE VIEW) PLATE 3.13-2 JOB: INSTALLED AS THE FIRST 6TEP IN CONSTRUCTION AND REMOVED ONLY AFTER THE GRADING 16 COMPLETE ENTRANCE GRAVEL FILTER UNDISTURBED AREAS INSIDE THE PARCEL BOUNDARY). THE PRE -DEVELOPED APPLICABLE AREA HAS 3.12 _ _.-- 1902 CONSTRUCTION OF A SILT FENCE 3=06 AND "THE FINAL SURFACE OF ALL TRAVEL WAYS 16 READY TO BE PLACED. PLEASE SEE THE AL13EMARLE ACRES OF OLD PASTURE AND 3.01 ACRES OF WOODED AREA. THE P05T-DEVELOPED APPLICABLE AREA COUNTY PAVED WASH RACK DETAIL. "THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PLAN VIEW WITHOUT WIRE SUPPORT) HAS 2.91 ACRES OF BUILDINGS, ROADS, PARKING LOTS, SIDEWALKS, AND OTHER IMPERVIOUS AREA AND CONSTRUCTION ROAD (�) ( PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY. TH16 MAY REQUIRE PERIODIC TOP 3,23 ACRES OF GRA66ED OR WOODED AREAS, PER THE PERFORMANCE BASED METHOD, THE 517E MUST 303 CR5 OVERFLOW 61 NO SCALE EDENBROOK PARK PRE56ING WITH ADDITIONAL STONE OR THE WASHING AND REWORKING OF EXISTING STONE AS 5TA131LIZATION RUNOFF WATER M REMOVE 3,95 LB5 OF PHOSPHOROUS PER YEAR. THE FOUR BIORETENTION FILTERS ARE DESIGNED BASED WITH SEDIMENT GRAVEL FILTER CONCRETE BLOCK �, 11 WATER PROTECTION CLAN �k. COND1110NO DEMAND AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT, ON 5% OF THE CONTRIBUTING IMPERVIOUS AREA FOR A 65% REMOVAL EFFICIENCY. PER THE ATTACHED 2 X4 WOOD STUD CURB INLETV1IHlT �,��� MAGISTERIAL DISTRICT ALL MATERIAL SPILLED, DROPPED, WASHED, OR TRACED FROM VEHICLES ONTO ROADWAYS OR INTO CALCULATIONS, THE BIO-FILTER6 REMOVE A TOTAL OF 4,02 L56 OF PHOSPHOROUS PER YEAR, WIRE SCREEN STORM DRAINS MUST BE REMOVED IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE MATERIALS 3.05 SILT FENCE 5F -j�� .'', ". 1�'' "'� ACE EI1/IAI LE COUNTY, VIRGINIA DROPPED, WASHED, OR TRACKED ONTO ROADWAYS WILL NOT BE PERMITTED UNDER ANY THE W6 24-HOUR METHOD WAS USED TO DETERMINE THE PRE -DEVELOPED AND P05T-DEVELOPED I 11 -- '' 11 � ' �"I I'll '' ' � '' ' CIRCUMSTANCES," RUNOFF RATES USED FOR 6TORMWATER QUANTITY MANAGEMENT DESIGN. THE SITE CON615TO ENTIRELY OF _ _ ___ _ _ 11 11(: )- `';`/�\` I /�\`/�\`/" ice\�� --- FILTERED �`- � s ' 11� 2, CONSTRUCTION ROAD STABILI7�T10N (VESCH# 3.03); HYDROLOGIC SOIL GROUP B SOILS. PRE -DEVELOPED RATES WERE DETERMINED FOR EACH BIO-FILTER �� `ij\jj\%/\\jj\ j\\jj- 1- 1 j\\j/\\j/\ WATER ' 11 i ' / / ' '' � 11 11 CONSTRUCTION ROAD STABILIZATION IS PROPOSED ON ALL PARKING AND TRAVEL WAYS ON THE SITE DRAINAGE AREA A55UMING A WOODED AREA IN GOOD CONDITION, BIO-FILTER A HAS A DRAINAGE AREA OF STORM DRAIN \\i\\i\\i\\i\\i\\i\\i\\i\\i\\ 1 � � ONCE SUB -GRADE HAS BEEN REACHED BUT BEFORE FINAL SURFACE 15 APPLIED TO PROVIDE QUICK 1.50 ACRES A PRE -DEVELOPED TIME OF CONCENTRATION OF 10 MINUTES AND A COMPOSITE CURVE 3'07 INLET PROTECTION IP0 / �� /� /� /� /%'�< 11 �' 1 ',,- STABILIZATION. THE BASE 61"ONE 6HALL SERVE AS THE CONSTRUCTION ROAD STABILIZATION. ALL BA6E NUMBER OF 55. THE 2-YEAR PRE -DEVELOPED PEAK DI6CHAR6E 15 0.535 CFO, AND THE 10-YEAR SEDIMENT `i/'�// //,/;\y/\\//\\//\\ STONE SHALL BE VDOT 2'1-B. "BOTH TEMPORARY AND PERMANENT ROADS AND PARKING AREAS MAY PRE -DEVELOPED PEAK DISCHARGE 15 2.489 CFO FOR BIO-FILTER A. BIO-FILTER B HAS A DRAINAGE AREA - - - - `,`". 1. SET THE STAKES. 3. STAPLE FILTER MATERIAL REQUIRE PERIODIC TOP DRESSING WITH NEW GRAVEL SEEDED AREAS ADJACENT TO THE ROADS AND OF 0.33 ACRES, A PRE -DEVELOPED TIME OF CONCENTRATION OF 10 MINUTES, AND A COMP061TE CURVE TEMPORARY TO STAKES AND EXTEND PARKING AREAS SHOULD BE CHECKED PERIODICALLY TO ENSURE THAT A VIG-•OROUS STAND OF NUMBER OF 55. THE 2-YEAR PRE -DEVELOPED PEAK DISCHARGE 15 0,118 CFO, AND THE 10-YEAR 3,09 DD IT INTO THE TRENCH VEGETATION IS MAINTAINED, ROADSIDE DITCHES AND OTHER DRAINAGE STRUCTURES SHOULD BE CHECKED PRE -DEVELOPED PEAK DISCHARGE IS 0,547 CF6 FOR 510-FILTER B. 510-FILTER C HAS A DRAINAGE DIVER510N DIKE SECTION A REGULARLY TO ENSURE THAT THEY DO NOT BECOME CLOGGED WITH SILT OR OTHER DEBRIS." AREA OF 0.93 ACRES, A PRE -DEVELOPED TIME OF CONCENTRATION OF 10 MINUTES, AND A COMPOSITE - - (: ) _ SPECIFIC APPLICATION 3, SILT FENCE (VESCH# 3.05): CURVE NUMBER OF 55. THE 2-YEAR PRE -DEVELOPED PEAK DISCHARGE 16 0.333 CFO, AND THE 10-YEAR THIS METHOD of INLET PROTECTION 15 APPLICABLE AT SILT FENCE IS PROPOSED AT THE TOE OF ALL SLOPES AND ON THE PROPERTY LINE WHERE SHEET PRE -DEVELOPED PEAK DISCHARGE IS 1.543 CFO FOR 510-FILTER C. 510-FILTER D HAS A DRAINAGE 3 10 TEMPORARY FILL FD pp CURB INLETS WHERE AN OVERFLOW CAPABILITY 15 11 ' ' CLIENT: r NECESSARY TO PREVENT EXCE55NE PONDING IN FRONT OF � / I'll / ' -1 FLOW 15 EXPECTED TO CATCH SEDIMENT THROUGHOUT THE ENTIRE PROJECT. SILT FENCE SHALL BE AREA OF 1.55 ACRES, APRE-DEVELOPED TIME OF CONCENTRATION OF 10 MINUTES, AND A COMPOSITE DIVERSION i � INSTALLED BEFORE ANY GRADING OR GRUBBING BEGINS AND SHOULD ONLY BE REMOVED AFTER AREAS CURVE NUMBER OF 55. THE 2-YEAR PRE -DEVELOPED PEAK DISCHARGE 15 0.556 CFO, AND THE 10-YEAR _ _ -_ THE STRUCTURE. I I '11 ''� ®ENBr �i�KL.L.C. - ,/ DRAINING TO IT ARE ADEQUATELY STABILIZED. "1, SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER PRE -DEVELOPED PEAK DISCHARGE 16 2.572 CF5 FOR BIO-FILTER D. -- - - - GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE, 11 I . . j 11 i /%' - '/� f`� HUMANITIES FOUNDATION EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL, ANY REQUIRED REPAIR5 SHALL BE TEMPORARY WURM V& I nATE 3,07-0 �� I1 I "� ;, � MADE IMMEDIATELY. 2. CL05E ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE POST -DEVELOPED RATES WERE DETERMINED FOR EACH BIO-FILTER DRAINAGE AREA USING A COMPOSITE 3.11 RIGHT-OF-WAY RWD - �`%�� . I /,,% RESULTING FROM END RUNS AND UNDERCUTTING, 3. SHOULD THE FABRIC ON A SILT FENCE CURVE NUMBER BASED ON THE LAND COVER OF EACH AREA. COMP061TE CURVE NUMBER CALCULATIONS DIVER510N(�)I' � 11 � ' DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE AREA SHOWN IN THE ATTACHED CALCULATIONS. THE POST -DEVELOPED TIME OF CONCENTRATION 16 7 - - --_-- ' ''111 BARRIER STILL BE NECESSARY, THE FABRIC 6HALL BE REPLACED PROMPTLY, 4, SEDIMENT DEPOSITS MINUTES AND THE COMPOSITE CURVE NUMBER 15 81 FOR BIO-FILTER A, THE 2-YEAR P06T-DEVELOPED 3 13 TEMPORARY ST SHOULD BE REMOVED AFTER EACH STORM EVENT, THEY MUST BE REMOVED WHEN THE DEPONT6 REACH PEAK DI6CHARGE 16 4.456 CFO, AND THE 10-YEAR P06T-DEVELOPED PEAK DISCHARGE 15 8.211 CFO APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. 5. ANY SEDIMENT DEPO51T6 REMAINING IN FOR BIO-FILTER A. THE P06T-DEVELOPED TIME OF CONCENTRATION 16 5 MINUTES AND THE COMP061TE SEDIMENT TRAP . ... , . 2. EXCAVATE A 4°X4° 4• BACKFILL AND PLACE AFTER THE SILT FENCE 16 NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE CURVE NUMBER 15 69 FOR BIO-FILTER B, THE 2-YEAR P06T-DEVELOPED PEAK DISCHARGE 16 0.599 - _ TRENCH UPSLOPE ALONG COMPACT THE EXISTING GRADE, PREPARED, AND SEEDED." CFO, AND THE 10-YEAR P06T-DEVELOPED PEAK DISCHARGE 15 1.329 CFO FOR BIO-FILTER B. THE .. THE LINE of STAKES. EXCAVATED SOIL. SHEET FLOW INSTALLATION 4.INLET PROTECTION (VESCH# 3,07): POST -DEVELOPED TIME OF CONCENTRATION 15 5 MINUTES AND THE COMPOSITE CURVE NUMBER 15 87 saCC - � SOURCE 'A (PERSPECTIVE VIEW) PLATE 3,05-2 INLET PROTECTION IS PROPOSED AT EVERY INLET LOCATED ON THE SITE TO PREVENT SEDIMENT FROM FOR BIO-FILTER C. THE 2-YEAR POST -DEVELOPED PEAK DISCHARGE 15 3.637 CFO, AND THE 10-YEAR 3 17 S .��� ENTERING STORM INLETS AND PIPES. "1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND P05T-DEVELOPED PEAK DI6CHARGE 16 6.134 CFO FOR 510-FILTER C. THE P05T-DEVELOPED TIME OF _ -- . . J/� ,, -4 ' STIQ A CONVEYANCE CHANNEL REPAIRS MADE A5 NEEDED. 2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS CONCENTRATION 16 5 MINUTES AND THE COMP061TE CURVE NUMBER 15 66 FOR BIO-FILTER D. THE ��7: -- �.r-' ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ON HALF THE DESIGN DEPTH OF THE 2-YEAR P05T-DEVELOPED PEAK DISCHARGE 15 2.344 CFO, AND THE 10-YEAR P05T-DEVELOPED PEAK PIPE OUTLET CONDITIONS -_ . - �-�- Is' TRAP, REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT DISCHARGE 15 5.590 CF5 FOR 5I0-FILTER D. 3,18 OUTLET PROTECTION OP 1 3.18 �� � , �---J,� ��� _� TOP WIUTFI* �y Q � TOP N DTH* DEPTH* WILL NOT ERODE, 3. STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN TFIE REMAINING / �'� ,yp '-� -'-dam' -„ _ 2.� Q�p� 1 07/25/2013 PER REVIEW COMMENTS DRAINAGE AREA HAS BEEN PROPERLY STABILIZED." EACH DLO -FILTER IS DESIGNED WITH THE R-TANK HD UNDER THE MEDIA. THERE WILL BE TWO RISERS IN _-- - ;- � rs-'"�` LII _._ ' �� Mai T �_ III -I --I I S, TEMPORARY DIVERSION DIKE (VESCH# 3,09): EACH FACILITY, THE FIRST WILL DIVERT THE 2-YEAR AND 10-YEAR STORM EVENTS INTO THE R-TANK HD. A ®� A i = � ''�- --'� _�/� I1=1 "_ .::. DEPTH* _ = I1=11=11- =III - 'III 121� DATA DESCRIPTION III -I I_ I �I I �I �I I I �I �I I TEMPORARY DIVERSION DIKES ARE PROP06ED TO PREVENT RUNOFF FROM REACHING ADJOINERS AND TO THE SECOND WILL ACT AS THE EMERGENCY SPILLWAY FOR ANY EVENT LARGER THAN THE 10-YEAR STORM. SURFACE O - m - � EACH LIFT OF THE FILL IS COMPACTED, BUT THE OUTER FACE I_I=111�11=1 -" :- III= -III -III= II-III-ill-III=11-_ �-111-I11=111= 3,29 5R � �q, � ,_ _ �- A5515T IN DIRECTING STORMWATER TO THE TEMPORARY SEDIMENT TRAPS, "THE MEASURE SHALL BE THE 100-YEAR CHECK STORM 15 ROUTED SEPARATELY FROM THE 2-YEAR AND 10-YEAR STORMS. THIS ROUGHENING - - OF THE SLOPE IS ALLOWED TO REMAIN LOOSE So THAT THE TIIIIIIIIIIil=IIIIII-1I F-- II:: II�II 1111 �II-11 II- 1I II III11 =IIEIIEIFI�lll I cJCJU f�, MARCH 21, 2013 INSPECTED AFTER EVERY STORM AND REPAIR5 MADE TO THE DIKE, FLOW CHANNEL, OUTLET OR ROUTING ASSUMES THAT THERE NO R-TANK HD5 UNDER THE MEDIA; THEREFORE, THE ROUTING6 DO NOT _ Rocics, CLODS, ETC. REACH THE NATURAL ANGLE OF REPOSE. =111 111=COMPACTED SOIL Ell III=11�tI�coMPACTED SOIL MII=111 11=1 I I� 11-111 11 1-111-111-11 1-I 1 1= 11= I =1 1=1 I I -III -I I- I I -I 11=1 11=1 11=1 11-- SEDIMENT TRAPPING FACILITY, AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS REFLECT ANY OF THE R-TANK HD STORAGE. ALL BIO-FILTRR6 EXCEPT 510-FILTER B HAVE ONE FOOT OF =111=III=III=III=11�11�iii=iimI 111=ll�ll�11�11�111=11MIMimi"ll CONTOUR INTERVAL: - OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES FREEBOARD ON THE 100-YEAR CHECK STORM, BIO-FILTER B CANNOT BE GRADED TO ALLOW ONE FOOT II -III I mr1 HIII-III-III,,-III-III-III II-11!=III=III=III-111'.III-III-111-III- CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH OF FREEBOARD, THE BIO-FILTERS DETAIN THE 2-YEAR AND 10-YAR EVENTS BACK TO BELOW 3,30 TOP501LING TO T® FILL ,SLOPE TRL'ATI�IRN7' TYPICAL CONCRETE LINED TRIANGULAR TYPICAL GRASS LINED TRIANGULAR DEGIGNED DY: - PRE DEVELOPED LEVELS, OUTFACE CHANNELS DIRECT THE RUNOFF FROM THE BIO FILTER TO THE STREAM, PLAN FLAT AREA WITH NO PIPE OUTLET TO DITCH DITCH I WORKING DAY." DRAV\/I�, �`�; �jG1J 6. TEMPORARY SEDIMENT TRAP (VE66H# 3.13): THESE CHANNELS ARE DESIGNED USING THE ROUTED DISCHARGE FROM EACH BIO-FILTER. A LINING AND - $ - - 1 DEFINED CHANNEL SOURCE: VA. DSWC PLATE. 3.29-3 TOP V, DTH* CHANNEL ANALY616 WERE COMPLETED U61NG THE FEDERAL HIGHWAY ADMINISTRATION HYDRAULIC TOOL BOX. �I � CNEC�.ED BY: RHO 1HREE SEDIMENT TRAPS ARE PROPOSED IN CONJUNCTION WITH TEMPORARY DIVERSION DIKES TO TRAP Oi 11- II _ III DETAILS OF THE BIO-FILTEE6 ARE SHOWN ON THE PLAN. DETAILED CALCULATIONS AREA ATTACHED. A 3,31 TEMPORARY SEEDING TS 11=1t1=1 III -III - SEDIMENT LADEN RUNOFF AND DETAIN IT TO PROMOTE SETTLEMENT OF SEDIMENT. ALL TRAPS ARE �- `' ---�-� DESIGNED HAVE 134 CUBIC YARDS OF TOTAL STORAGE PER ACRE (67 CUBIC YARDS OF WET STORAGE SUMMARY OF EACH ROUTING FOLLOWS: (�) . _ DEPTH - - AND 67 CUBIC YARDS OF DRY STORAGE. "1. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED BIO-FILTER 02 (CF5) Q10 (Cr-6) _=11�11�111-_ _ 1=III=11�11 FILTER CLOTH 11=III=III =11I I 1 III -I I_I_I_lll_I I_ =1 I �I H I I -I I �I I I �I 1=1 1=1 �1 T A 0.503 2.400 ° - F 11=III=11- - III-111- T0 ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN SECTION A -A' KEY IN 6°-9 AROUND < �� ;: \ =1I�IIFCOMPACTWD SOIL -,1=11�11 VOLUME OF THE WET STORAGE, SEDIMENT REMOVAL FROM THE DA61N SHALL BE DEP061TED IN A B 0.022 0.512 ENTIRE PERIMETER - I 1I1=1I1=1 11111-111 ' 1I1" 1I I-1I1=1I1= ° SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE SEDIMENTATION C 0.292 1.371 3,32 PERMANENT 5EEDING P5 (�) {;'. =11 I1-1IF1 II-II�II�II�III II1II SHOE TITLE PROBLEMS, 2. FILTER STONE SHALL BE REGULARLY CHECKED TO ENSURE THAT FILTRATION D 0.092 1.755 `- / o TI-n1=111�11=1u=1u 111=111 111=111- TYPICAL SOIL BLANKET LINED PERFORMANCE 15 MAINTAINED. STONE CHOKED WITH SEDIMENT SHALL BE REMOVED WITH SEDIMENT - -- \ TRIANGULAR DITCH SHALL BE REMOVED MJD CLEANED OR REPLACED, 3. THE STRUCTURE SHOULD BE CHECKED REGULARLY MAINTENANCE; A A' - ®,: TOP WDTH# EROSION & SEDIMENT CONTROL THE RESPONSIBLE LAND DISTURBER SHALL CHECK ALL ER06ION AND SEDIMENT CONTROLS DAILY AND 3.35 MULCHING MU MU $ , -�` TO ENSURE THAT IT 15 STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY ER06ION OR _ - AFTER EACH SIGNIFICANT RAINFALL. MONITORING REPORTS REQUIRED UNDER THE VSMP PERMIT ARE ALSO 7� .. ® III I =11111 NOTES & DETAILS CONSTRUCTION EQUIPMENT. THE HEIGHT OF THE STONE OUTLET SHOULD BE CHECKED TO ENSURE THAT � o --11- 111-TINT ITS CENTER 15 AT LAST 1 FOOT BELOW THE TOP OF THE EMBANKMENT." REQUIRED FOR EROSION AND SEDIMENT CONTROL INSPECTIONS/MONITORING. DEFICIENCIES SHALL BE -- - - . .. 11=111=11 III=111= -I I I=I I I=1 DEP 11=ill-I I 7, 6TORMWATER CONVEYANCE CHANNEL (VESCH# 3.17); REPAIRED IMMEDIATELY. SEE STRUCTURAL PRACTICES FOR SPECIFIC MAINTENANCE ITEMS. ALL SEEDED 11=111-III a -III III I SOIL STABILIZATION -III III=III- -III- III=11F711 6TORMWATER CONVEYANCE CHANNELS ARE PROPOSED TO DIRECT CONCENTRATED RUNOFF EXITING THE AREAS SHALL BE CHECKED WEEKLY, AND SHALL BE RE-6EEUED AND MULCHED A5 NECESSARY, SEE 3 3g g/M B/M y � 11=III=III-III-III=I � _III I I=III=III- STRUCTURAL PRACTICES FOR D16CU66ION OF REMOVAL OF MEASURES. BLANKETS AND MATTING =111 I11 I =1 11 - 11 III 11 F-11 GRAPHIC SCALE BIORETENTION FILTERS TO THE CREEK. THIS MEASURE SHALL BE INSTALLED BEFORE EACH BIORETENTION DOZER TREADS CREATE 11-111- _ - - - III=111 111 III=111=111= (: ) PIPE OUTLET TO WELL -I- - - - - - - FILTER IS INSTALLED. "GRA66-LINED CHANNELS DURING THE INITIAL ESTABLISHMENT, GRA55-LINED -- PLAN DEFINED CHANNEL cRoovEs PERPENDICULAR=II�IIE1sI�II�II�II III IIkKEY IN LTER II�II o 10 20 CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND GRASS RE-E6TABL15HED IF NECESSARY, AFTER - L TO THE SLOPE. 11=111 III-III=III=III=III II=III= =111-III=11 =III= I �I I �I �I 11=1I CLOTH 6°-9" I �I I AS SHOWN GRASS HAS BECOME ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO DETERMINE IF l / I1=III-III=III=FILTER c 'COMPACTED SOIL III -I -III 1 3 38 TREE P RESERVATION TP p 5��e:;; • -I I �Il-I 11I =ll�l I=I �I II III I=11�i i -I 11 �I 1 i=l I �I THE GRASS 16 WITHSTANDING FLOW VELOCITIES WITHOUT DAMAGE. IF CHANNEL 15 TO BE MOWED, IT AND PROTECTION .. -m'•.r ,;, i1=111=1i1=T1 ,I1-'II-ITT=11i-I 11=111=111=III=1i1=1i1=111=111-111=111- 11=1II- SHOULD BE DONE IN A MANNER THAT WILL NOT DAMAGE THE GRASS." "SEDIMENT DEPOSITION IF THE oA _ . TYPICAL RIP RAP LINED TRIANGULAR DITCH sHr�r ENTERS THE CCHANNEL 16 HLOW A HANNEL, FILDSEXPERIENCE0HA6 IDEMONSTRATEDSEDIMENT THATSHOULD MANY NEWLYT CONSTRUCTED E IT TRACKING CONVEYANCE CHANNELS BECOME DAMAGED AND REQUIRE COSTLY REPAIR5 AS A RESULT OF IMPROPER 3,39 DUST CONTROL DC FILTER CLOTH UPSLOPE CONTROLS. IF SEDIMENT 16 DEPOSITED IN A 6RA66-LINED CHANNEL, IT SHOULD BE REMOVED SECTION A -A' KEY IN 6ERIM AROUND ENTIRE PERIMETER JOB N0' sHErr No - - - 60U VA PLATE 3.18-1 SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTATION GUIDE PLATE, 3.29-4 SOURCE: VESCH STD. 3.17 1222, of 10 ID - F:\2012\12221\dwg\C-E5-FLOT-12221.dwg - Thu, 1 Aug 2013 - 10:22 BIORETENTION PONDS - MINIMUM STANDARDS CHAPTER 3.11A BIORETENTION FILTERS THE REQUI61TE NUMBER OF PLANTINGS VARIES, AND SHOULD BE DETERMINED ON AN INDIVIDUAL 5ITE BY 51TE BASIS. ON AVERAGE, 1000 TREES AND SHRUBS SHOULD BE PLANTED PER ACRE, WITH A MINIMUM OF 400 STEMS PER ACRE AND A MAXIMUM OF 1250 5TEM5 PER ACRE. GROUNDCOVER FOR ALL PONDS AND TEMPORARY STREAM BUFFER IMPACT AREAS TO BE "RIPARIAN BUFFER MIX° BY ERNST CONSERVATION SEEDS (ERNST PRODUCT #: ERNMX-176) AT 20 LB PER ACRE UNLESS OTHERWISE SPECIFIED. MANUFACTURER DOES NOT RECOMMEND FERTILIZER. CONTACT ERNST SEEDS FOR RECOMMENDED SOIL PREPARATION AND PLANTING GUIDELINES. CONTRACTOR MUST FOLLOW RECOMMENDED GUIDELINES. POND A .04 ACRES = MIN 16 5TEM5 / MAX 50 STEMS, 43 STEMS: 6 TREES AND 35 SHRUBS PROVIDED POND B .01 ACRES = MIN 4 5TEM5 / MAX 13 5TEM5 14 5TEM5 PROVIDED: 14 SHRUBS POND C .03 ACRES = MIN 12 5TEM5 / MAX 36 5TEM5 35 5TEM5 PROVIDED: 8 TREES AND 27 SHRUBS POND D .05 ACRES = MIN 20 5TEM5 / MAX 63 5TEM5 44 5TEM5 PROVIDED: 10 TREES AND 34 SHRUBS MITIGATION AREA - ALBEMARLE COUNTY DESIGN STANDARDS MANUAL I. 5. C. STREAM BUFFERS FOR EVERY 400 SQUARE FOOT UNIT OR FRACTION THEREOF, PLANT ONE (1) CANOPY TREE MEASURING 1 1 /2" - 2" CALIPER OR A LARGE EVERGREEN 6 FEET IN HEIGHT, ONE (1) UNDERSTORY TREE MEASURING 3/4" - 1 1 /2" CALIPER OR ONE EVERGREEN 4 FEET IN HEIGHT, AND ONE (1) SMALL SHRUB 15" - 16" IN HEIGHT. 19677 SQUARE FEET OF MITIGATION AREA = 50 CANOPY TREES, 50 UNDER5TORY TREES, 50 SMALL SHRUBS REQUIRED 50 CANOPY TREES, 57 UNDERSTORY TREES, 54 SMALL SHRUBS PROVIDED LANDSCAPE NOTES WATERING: SPRING AND FALL PLANTED TREES AND SHRUBS SHALL BE THOROUGHLY WATERED THE DAY OF PLANTING AND THEN WILL BE WATERED EVERY 7 DAYS THROUGHOUT THE FIRST GROWING YEAR. WHEN SIGNIFICANT RAINFALLS MAINTAIN M016TURE IN THE SOIL, WATERING FOR THAT PERIOD CAN BE DELAYED UNTIL THE NEXT 7 DAY CYCLE. FERTILIZING: INSTALLER TO AMEND 601L AS REQUIRED BY ON-5ITE CONDITIONS AND THE NEEDS OF THE PLANTED TREES AND SHRUBS, FERTILIZATION SHOULD BE DONE IN EARLY SPRING OR LATE FALL, AND A WATER INSOLUBLE NITROGEN (WIN) 15 RECOMMENDED AS THE PLANTS WILL USE IT AS NEEDED AND IT WILL NOT WASH OFF OR LEACH INTO THE GROUND WATER. THE IN5TALLER SHALL HAVE THE SOIL TESTED FOR PH PRIOR TO INSTALLATION AND DETERMINE THE CORRECT FERTILIZERS FOR THE SPECIFIED PLANTS, AT PLANTING PRUNE ONLY CROSSING LIMBS, CO -DOMINANT LEADERS, BROKEN OR DEAD BRANCHE6, AND ANY BMNCHEF THAT POSE A HAZARD TO PEDESTRIANS WATER THOROUGHLY TWICE WITHIN THE FIRST 48 HOURS TOP OF BALL TO BE SET 2" TO 3" ABOVE THE LEVEL OF THE SURROUNDING SOIL REMOVE BURLAP AND BASKET FROM TOP 1 /3 OF BALL AND REMOVE FROM SITE. 3" EARTH SAUCER BACKFILL WITH 1 /2 CLEAN EXISTING SOIL, 1 /4 CERTIFIED TOPSOIL AND 1 /4 ORGANIC MATERIAL STAKES OR GUYS TO BE INSTALLED U61NG ACCEPTED ARBORICULTURE PRACTICE TREE PLANTING DETAIL DECIDUOUS TREE NO SCALE R-TANK MAINTENANCE ACCESS PORT (TYP.) CLEAN -OUT W/ WATERTIGHT CAP (TYP.) 3:1 60D TURF SLOPE-� (TYP.) 50% 5AND / 20% TOP SOIL / 30% LEAF MULCH (SAND: 0.02" -0.04" ASTM C33 FINE) PER VSMH STD. 3.11 111-111- 6 PERFORATED PVC PIPED 9 0.5% TO R-TANK HD I�liii\ UNDERDRAIN GRAVEL '. (AAS HTO M43, 1/2"-1") - WRAPPED IN FILTER FABRIC SEE LANDSCAPE PLAN FOR VEGETATIVE COVER CONSTRUCT EARTH 5AUCER, 3" HIGH CONTINUOUS BERM 2" MULCH EXTENDING OVER BERM 1/8 TO 1/4 OF ROOTBALL ABOVE GRADE REMOVE BURLAP FROM TOP OF BALL BACKFILL WITH 1 /2 CLEAN EXISTING SOIL, 1 /4 SAND AND 1 /4 ORGANIC MATTER, WITH A PICK SHRUB PLANTING DETAIL NO SCALE - IlIIVf� VIVVCICVICVVIVV V I VIC/1(7C OR EQUAL WRAPPED IN )NOFILAMENT FABRIC W/ GRAVEL BEDDING PER MANUFACTURER BIORETENTION FILTER "D" (VSMH STD. 3.11) WITH UNDERGROUND DETENTION NTS ►1 SEDIMENT FOREBAY WEIR DETAIL. NTS TOP ELEV. = 1' ABOVE WEIR ELEV, WEIR ELEV. - 5EE PLAN WEIR MAY BE BUILT WITH WIRE OR GABION 13A5KET5 SEDIMENT FOREBAY - 5EE PLAN VDOT #3 OR #357 STONE VDOT CL. Al RIP -RAP - FILTER CLOTH- TOP WIDTH VARIES - 5EE PLAN 48" MANHOLE RISER B (EMERGENCY SPILLWAY) W/ BEEHIVE GRATE GRASS - TOP= SEE TABLE 4' ERNST RIPARIAN INV.= SEE TABLE BUFFER 5EED MIX LF 12" PPE PIPE 16" HDPE PIPE, DAYLIGHT TO DITCH R-TANK MAINTENANCE ACCE55 PORT (TYP,) CLEAN -OUT W/ WATERTIGHT CAP (TYP.) 3:1 SOD TURF SLOPE--_,� (TYP.) 50% SAND / 20% TOP SOIL 30% LEAF MULCH (SAND: 0.02" -0.04" A5TM C33 FINE) PER VSMH STD. 3.11 III=11! 611 PERFORATED PVC PIPE 9 0.5% TO R-TANK HID III= UNDERDRAIN GRAVEL I (AA5HTO M43, 1/2"-1") - WRAPPED IN FILTER FABRIC SEE LANDSCAPE PLAN FOR VEGETATIVE COVER 24" HDPE RISE y A W/ BEEHIVE GRATE TOP=5EE TABLE BIORETENTION FILTER "A" (VSMH STD. 3.11) WITH UNDERGROUND DETENTION NTS 48" MANHOLE RISER B (EMERGENCY SPILLWAY) W/ BEEHIVE GRATE GRASS - TOP= SEE TABLE 4' ERNST RIPARIAN INV.= SEE TABLE 7-13UFFER SEED MIX 2 LF 12" HDPE PIF 18" HDPE PIPE, DAYLIGHT TO DITCH BIOFILTER EMBANKMENT TOP ELEV BOTTOM ELEV R16ER A TOP ELEV R15ER B TOP ELEV RISER B INV ELEV R-TANK HD MODULE DEPTH R-TANK HD MODULES* R-TANK HD ORIFICE A PIA R-TANK HD ORIFICE B PIA R-TANK HD ORIFICE A ELEV R-TANK HD ORIFICE B ELEV 100-YEAR WSEL A 665.30 665.00 666.00 666.51 657,35 QUAD 510 4.0 7.0 657.33 659,10 667.29 NOTES: *CONFIRM NUMBER OF R-TANK HD MODULES WITH MANUFACTURER. INSTALLATION OF R-TANK HD PER MANUFACTURER'5 SPECIFICATIONS. R-TANK MAINTENANCE SEE LANDSCAPE PLAN ACCESS PORT (TYP.) A- FOR VEGETATIVE COVER CLEAN -OUT I V W/ WATERTIGHT - a CAP (TYP,) 3:1 SOD 24' HDPE RISE TURF SLOPE A W/ BEEHIVE (TYP.) GRATE TOP=SEE TABLE I-III=III=III=1 AW\ 50% SAND 20% TOP 601L / = = �.. / I III III 30% LEAF MULCH (SAND: - �;:.. TABLE I III=i.. 3 HARDWOOD c� SEE 0,02 -0,04 ASTM C33 FINE) -III=III=11' . MULCH PER VSMH 5TD. 3.11 I -III -III- \ i 1=1 i 1=1 11=1 11=1 I 6" PERFORATED PVC PIPE -III-III=III= R-TANK UNDERGROUND STORAGE --1- - - -I - - - OR EQUAL WRAPPED IN 0 0,5% TO R-TANK HD III=III=III=III=111II11=III=III=1 B -III-III-III-III- -III=III-III-III MONOFILAMENT FABRIC W/ GRAVEL o -III III=IIIIIII III BEDDING PER MANUFACTURER UNDERDRAIN GRAVEL A (AASHTO M43, 1/2"- "=1 I I III III III III -III I-III=III III=III III_III WRAPPED IN FILTER FABRIC . I-1 I I III -1 I I, ,III; , BIORETENTION FILTER "B" (VSMH STD. 3.11) WITH UNDERGROUND DETENTION NTS 48" MANHOLE RISER B (EMERGENCY SPILLWAY) W/ BEEHIVE GRATE GPA55 - TOP= SEE TABLE 4' ERNST RIPARIAN INV.= SEE TABLE BUFFER SEED MIX 2 LF 12" HDPE PIPE 18" HDPE PIPE, DAYLIGHT TO DITCH BIOFILTER EMBANKMENT TOP ELEV BOTTOM ELEV R15ER A TOP ELEV R16ER B TOP ELEV RISER B INV ELEV R-TANK HD MODULE DEPTH R-TANK HD MODULES* R-TANK HD ORIFICE A PIA R-TANK HD ORIFICE B PIA R-TANK HD ORIFICE A ELEV R-TANK HD ORIFICE B ELEV 100-YEAR WSEL B 664.20 662.20 663,20 663.33 656.65 DOUBLE 20 3,5 N/A 656.65 N/A 663.59 NOTES: 5TORMWATER BMP *CONFIRM NUMBER OF R-TANK HD MODULES WITH MANUFACTURER. - 5EE PLAN INSTALLATION OF R-TANK HD PER MANUFACTURER'S SPECIFICATIONS. BIOFILTER EMBANKMENT TOP ELEV BOTTOM ELEV RISER A TOP ELEV RISER B TOP ELEV R16ER B INV ELEV R-TANK HD MODULE DEPTH R-TANK HD MODULES* R-TANK HD ORIFICE A PIA R-TANK HD ORIFICE B PIA R-TANK HD ORIFICE A ELEV R-TANK HD ORIFICE B ELEV 100-YEAR WSEL D 652.97 650.00 651.00 651.28 642.56 TRIPLE 63 6.0 N/A 642.56 N/A 651,97 R-TANK MAINTENANCE ACCESS PORT (TYP.) CLEAN -OUT W/ WATERTIGHT CAP (TYP.) 3:1 SOD TURF SLOPE-----l� (TYP.) 50% 5AND / 20% TOP 5011_ 30% LEAF MULCH (SAND: 0.02" -0.04" A5TM C33 FINE) PER VSMH 5TD. 3.11 11=III 6" PERFORATED PVC PIPE_L ® 0.5% TO R-TANK HD III= UNDERDRAIN GRAVEL (AA5 HTO M43, 1/2"-1") - WRAPPED IN FILTER FABRIC SEE LANDSCAPE PLAN FOR VEGETATIVE COVER 24" HDPE R16E Y `-- A W/ BEEHIVE GRATE TOP=5EE TABLE ;, .SEE TABU 3 HARDWOOD. N MULCH . 0 0 0 0 0 0 R-TANK UNDERGROUND STORAGE o III=III=III=1 OR EQUAL WRAPPED IN B III -III -III -III MONOFILAMENT FABRIC W/ GRAVEL II-III-III=III=1 BEDDING PER MANUFACTURER A BIORETENTION FILTER C (VSMH STD. 3.11) WITH UNDERGROUND DETENTION NTS 48" MANHOLE RISER B (EMERGENCY SPILLWAY) W/ BEEHIVE GRATE GRAgg - TOP= SEE TABLE 4' ERNST RIPARIAN INV.= SEE TABLE 7-DUFFER SEED MIX LF 12" PE PIPE 18" HDPE PIPE, DAYLIGHT TO DITCH BIOFILTER EMBANKMENT TOP ELEV BOTTOM ELEV R15ER A TOP ELEV R15ER B TOP ELEV RISER B INV ELEV R-TANK HD MODULE DEPTH R-TANK HD MODULE5* R-TANK HD ORIFICE A PIA R-TANK HD ORIFICE B PIA R-TANK HD ORIFICE A ELEV R-TANK HD ORIFICE B ELEV 100-YEAR WSEL C 653.05 650.00 651.00 651.42 643.23 DOUBLE + MINI 431 6.0 5.6 643.23 644.95 652.04 27 GREEN HILL DRIVE, FOREST, VIRGINIA 24551 PHONE:434-525-5985 FAX:434-525-5986 EMAIL: pno@perkins-orrison.com PO BOX 1567 17 W. NELSON STREET LEXINGTON, VIRGINIA 24450 PHONE:540-464-9001 FAX:540-464-5009 EMAIL: pno@perkins-orrison.com CONSULTANTS SEAL: ,'A uj nr U RUSSELL I0ISON <OT6. 031849 1<1 0 AR-1 -10NAL Z JOB: WHITE HALL MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA CLIENT: EDENBROOK L.L.C. C/O THE HUMANITIES FOUNDATION 1 07/25/2013 PER REVIEW/ COivMENTS P\IARK DATE DESCRIPTION ISSUE: MARCH 21, 2013 CONTOUR INTERVAL: - DESIGNED P>Y: GGW DRAWN BY: GGW CHECKED BY: RHO SHEET TITLE GRAPHIC SCALE 0 10 20 AS SHOWN SHEET NOTES: *CONFIRM NUMBER OF R-TANK HD MODULES WITH MANUFACTURER. INSTALLATION OF R-TANK HD PER MANUFACTURER'S SPECIFICATIONS. NOTES: *CONFIRM NUMBER OF R-TANK HD MODULE5 WITH MANUFACTURER. INSTALLATION OF R-TANK HD PER MANUFACTURER'S SPECIFICATIONS. JOB NO.: SHEET NO 122221 22� 1 OF 10 0 - P:\2012\12221\dwg\G-ES-PLOT-12221.dwg - Thu, 1 Aug 2013 - 10:22 28.15" N ti SIDE VIEW 28.15" PLAN VIEW ISOMETRIC VIEW MODULE DATA GEOMETRY: LENGTH = 28.15 IN. (715 MM) LOAD RATING: 32 PSI, (MODULE ONLY) WIDTH = 15.75 IN. (400 MN1) H-20, (WITH ACF COVER SYSTEM) HEIGHT = 17,32 IN. (440 MM) STORAGE VOLUME = 4.22 CF (119 L) MATERIAL: 85% RECYCLED VOID INTERNAL VOLUME: 95% POLYPROPYLENE VOID SURFACE AREA: 900!'0 R®TANKTM v SINGLE MODULE 'JACK' FOR ADDITIONAL INFORMATION PLEASE CONTACT: ACF ENVIRONMENTAL, 1-800-448-3636, www.aefenvironmental.com 28.15" PLAN VIEW SIDE VIEW ISOMETRIC VIEW MODULE DATA GEOMETRY: LENGTH = 28.15 IN. (715 MM) LOAD RATING: 32 PSI, (MODULE ONLY) WIDTH = 15.75 IN. (400 MM) H-20, (WITH ACF COVER SYSTEM) HEIGHT = 33.86 IN. (860 MM) STORAGE VOLUME = 8.25 CF (234 L) MATERIAL: 859% RECYCLED VOID INTERNAL VOLUME: 95% POLYPROPYLENE VOID SURFACE AREA: 90% ACm)FR®YANKTM - DOUBLE MODULE FORADDITIONAL INFORMATION PLEASE CONTACT: ACF ENVIRONMENTAL, 1-800-448-3636, www.acfenvironmental.com 28.15" f 15.75 MODULE DATA ISOMETRIC VIEW 3EOMETRY: LENGTH = 28.15 IN. (715 MM) LOAD RATING: 32 PSI, (MODULE ONLY) WIDTH = 15.75 IN. (400 MM) H-20, (WITH ACF COVER SYSTEM HEIGHT = 50.39 IN. (1280 MM) STORAGE VOLUME = 12.28 CF (348 L) MATERIAL: 86% RECYCLED VOID INTERNAL VOLUME: 95% POLYPROPYLENE VOID SURFACE AREA: 90% ACx-F R-TANKTM a TRIPLE MODULE s FORADDITIONAL INFORMATION PLEASE CONTACT: ACF ENVIRONMENTAL, '1-800-448-3636, www.acfenvironmental.com 28.15" PLAN VIEW 28.15" a, SIDE VIEW ISOMETRIC VIEW GEOMETRY: LENGTH = 28.15 IN. (715 MM) LOAD RATING: 32 PSI, (MODULE ONLY) WIDTH = 15.75 IN. (400 MM) H-20, (WITH ACF COVER SYSTEM) HEIGHT = 66.93 IN. (1700 MM) STORAGE VOLUME = 16.31 CF (462 L) MATERIAL: 85"ra RECYCLED VOID INTERNAL VOLUME: 95% POLYPROPYLENE VOID SURFACE AREA: 90% AM CM r R-TANKTM m QUA® MODULE Xurp' FOR ADDITIONAL INFORMATION PLEASE CONTACT: ACF ENVIRONMENTAL, 1-800-448-3636, www,acfenvironmental-com 27 GREEN HILL .DRIVE, FOREST, VIRGINIA 24551 PHONE:434-525-5985 FAX:434-525-5986 EMAIL: pno@perkins-orrison.com PO SOX 1567 17 W. NELSON STREET LEXINGTON, VIRGINIA 24450 PHONE:540-464-9001 FAX:540-464-5009 EMAIL: pno@perkins-orrison.com CONSULTANTS SEAL: U RUSSELL ISON UV& 031849 O a &IONAL JOv: WHITE HALL MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA CLIENT: EDENBROOK L.L.C. C/O THE HUMANITIES FOUNDATION 1 07/25/2013 PER REVIEW COMMENTS MARK DATE DESCRIPTION 166UE: MARCH 21, 2013 CONTOUR INTERVAL: — DE5IGNED BY: GGW DRAWN BY: GGW CHECKED BY: RHO SHEET TITLE GRAPHIC SCALE 0 10 20 AS SHOWN SHEET JOB NO.: 12221 SHEET NO 10 s OF ID - P;\ 2012\ 1 2221 \ dwg\ C- E5- PLOT- 1222'l ,dwg - Thu, 1 Aug 2013 - 10:22 ID - P:\2012\12221\dwg\C-E5- PLOT- 12221,dwg - Thu, 1 Aug 2013 - 10:22 V - P;\ 2012\ 1 2221 \ dwg\ 0- E5- PLOT- 12221 .dwg - Thu, 1 Aug 2013 - '10:22 ID - P;\2012\12221\dwg\0-E5- PLOT- 12221,dwg - Thu, 1 Aug 2013 - 10:22