Loading...
HomeMy WebLinkAboutWPO202000009 Plan - Submittal (First) WPO VSMP 2020-02-03-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2/3/2020 dII350701.dgn 2:13.12 PM Plotted By: michoel.mitchell FOR INDEX OF SHEETS SEE SHEET 1A THIS PROJECT WAS DEVELOPED UTILIZING THE DEPARTMENT'S ENGINEERING DESIGN PACKAGE (GEOPAK). GEOPAK Computer Identification No. (UPC 113507) AL'"'IEMAR-LE 00UNTY FAOILITIES AND ENVIR-ONMENTAL SERNIOE9 PLAN AND PRkOFILE OF PROPOSED STATE Hl"' -'HWAY ALBEMARLE COUNTY ROUTE 9885 LAMBS LANE) FROMOoO0,56 VIOV10 OF T00o 0005 V/0 Ea OF PROD. EN/8-002-975, C-502 (ADDITIVE B/D ITEM #l) CONVENTIONAL SIGNS STATE LINE ............... COUNTY LINE CI'I°Y,TOWN OR VILLAGE RIG1HT OF WAY LINE ]FENCE LINE --------------------------------- x x UNFENCED PROPERTY LINE -------------------------- fi FENCEID PROPERTY LINE .............................. xji- WATER LINE --------------------------------- - - -- SANI°I"ARY SEWER LINE .. - ..........................- GAS LINE --------------------- - 4G ELECTRIC UNDERGROUND UNIDERGROUNID CABLE .................. - o E - TRAVELED WAY ............................................ ---------- GUARD RAIL --------- RETAINING WALL RAILROAIDS.................................................. ]SASE OR SURVEY LINE -------------------------------- O O U7) � O LEVEE OR EMBANKMENT Ildi611 illlllll illLlllilllllil lAfl111dM6i1i81111dYtlIIH 111'III'�'II'II'Il'II'I'I'I111111"IIII I'111'I'1111'IIP II'R IIIIM171'111 BRIDGES ... - - - CULVERTS - ............. ---------------- �--------� DROP INLET ------------------------------------------------ ]POWER POLES .......... TELEPHONE OR TELEGRAPH ]POLES ............... TELEPHONE OR TELEGRAPH LINES ............... - •• -T�g •• - HEDGE-------------------------------------------------------- TREES-------------------------------------------------------- HEAVY WOODS -------------------------------------- GROUNID ELEVATION - - - - - - - - - - - - - - - - - - -- DATUM LINE GRADE ELEVATION ....................................... DATUM LINE �I WRY CARR GREER / \ ELEiI �1ENT ARY SCHOOL ST14., ; \ ol.I c�,` r tv JACK JOUST T MIDDLE SCHOOLy SCALE 0 1S0' 300' THE COMPLETE ELECTRONIC PDF VERSION OF THE PLAN ASSEMBLY AS AWARDED, INCLUDING ALL SUBSEQUENT REVISIONS, WILL BE THE OFFICIAL CONSTRUCTION PLANS. FOR INFORMATION RELATIVE TO ELECTRONIC FILES AND LAYERED PLANS, SEE GENERAL NOTES. DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT, THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE DEPARTMENT'S 2016 ROAD AND BRIDGE SPECIFICATIONS, 2016 ROAD AND BRIDGE STANDARDS, 2009 MUTCD, 2011 VIRGINIA SUPPLEMENT TO THE MUTCD, 2011 VIRGINIA WORK AREA PROTECTION MANUAL AND AS AMENDED BY CONTRACT PROVISIONS AND THE COMPLETE ELECTRONIC PDF VERSION OF THE PLAN ASSEMBLY. THE ORIGINAL APPROVED TITLE SHEET(S), INCLUDING ORIGINAL SIGNATURES, IS FILED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY. ANY MISUSE OF ELECTRONIC FILES, INCLUDING SCANNED SIGNATURES, IS ILLEGAL AND ENFORCED TO THE FULL EXTENT OF THE LAW. 21312020 INTOOF ROUTE 657 LAMBS RDA INTOOF ROUTE 657 (LAMBS RD) PROJ. EN/8-002-975, PE-10/ -A 30ot45.68 PROD. EN/8-002-9759 C-50/ / STATE r LULMAL AIU J I Al L SHEET FHWA 534 PROJECT ROUTE PROJECT N0. DATA 37028 EN/8-002-975 V A. 9885 (SEE T ABULAT / N ELO� l FOR SECTION IUMBER$1 DESIGN PARAMETER Desi n Spred mph) Min. Horizontal Radius (f t ) Stopping Sight Distonce (ft) Min. Pavement Width (ft) Se �ppaon from R00 ratioy (ft) Sidewalk Buffer Strip Width (ft) Minimum SideWalk Width (ft) Minimum SideWolk Se ration from Slope (f t ) Cross Slope (/. ) Maximum Grade Min . To al Shoulder �lidth (ft) Ditch Front Slope (H:V) 1p �\ (BASE B/D) o � \ Q •�O I \ ^O� C V ------ ^ I 8 0 o Q ID T - I I \ 20 III \ \ K o Q ALBEMARLE + �Q' HIGH SCHOOL CIO FROJ. EN/8-002-9759 C-504 (ADDITIVE B/D ITEM #3) ALBEMARLE COUNTY POPULATION 99,014 (2010 CENSUS) DESCRIPTION REFERENCE POT 205.54.49 LAM S ROAD CO STR. ,@ POT 3I9.59.74 L, S LANE CONTR. ,@ STATE LENGTH INCLUDING LENGTH EXCLUDING PROJECT SECTION FEDERAL AID TYPE UPC BRIDGE(S) BRIDGES) TYPE DESCRIPTION NO, PROJECT NO. CODE NO. PROJECT FEET MILES FEET WLES PE-101 PENIS 113507 2186,48 0.41 2186.48 0.41 PRELIM, ENG Fr: 0.36 MI. W. OF INT. OF RTE. 657 (LAMBS ROAD) To: 0.05 MI, E. OF INT. OF RTE. 657 (LAMBS ROAD) r- C-501 1000 113507 1239.18 0.23 1239.18 0.23 CONSTRUCTION Fr. 0.29 MI. W. OF INT. OF RTE. 657 (LAMBS ROAD) I 0.06 MI, W. OF INT. OF RTE. 657 (LAMBS ROAD) ITo: oC-502 1000 113507 381.40 0.07 381.40 0.07 CONSTRUCTION Fr: 0.36 MI. W, OF INT. OF RTE. 657 (LAMBS ROAD) I To: 0.29 MI. W. OF INT. OF RTE. 657 (LAMBS ROAD) 00 C-503 1000 113507 565.90 0.11 565.90 0.11 CONSTRUCTION Fr: 0.06 MI, W. OF INT. OF RITE. 657 (LAMBS ROAD) w To: 0.05 MI. E. OF INT. OF RTE. 657 (LAMBS ROAD) C-504 1000 113507 412.86 0.08 412.86 0.08 CONSTRUCTION Fr: 0.28 MI, W, OF INT. OF RTE 657 (LAMBS ROAD) To: 0.04 MI. fly. OF INT. OF RTE. 657 (LAMBS ROAD) NOTE: PROJECT LENGTH BASED ON ROUTE 9885 AND ROUTE 657 CONSTRUCTION BASELINES DESIGN CRITERIA SHARED USE PATH (AASHTO) 18 (typical); 12 (minimum) 60 (typical); 27 (minimum) Varies 8 (Due to Certain Constraints); 10 typ. 5 2 (Moximum) 100 2 (6:1 Maximum slope) 5 (Adjacent slope steeper than 2:1 W/ drop of 4 +) Varies Kimley-Horn & Associates Richmond, Virginia ROADWAY ENGINEER SIDEWALK (AASHTO) N/A 4 1 FINAL PLANS I 21312020 THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. LOCALLY ADMINISTERED PROJECTS ALBEMARLE COUNTY NAME OF LOCALITY (SIGNATURE) -------------- ---------------- NAME OF RESPONSIBLE LOCAL GOVERNMENT OFFICAL (TYPED) --------------------------------------- RECOMMENDED FOR APPROVAL FOR RIGHT OF WAY ACQUISITION ---------------------------------------- DATE TITLE OF POSITION (SIGNATURE) NAMEOFRESPONSIBLE LOCAL GOVERNMENT OFFICAL (TYPED) - -- RECOMMENDED FOR APPROVAL FOR CONSTRUCTION --------------------------------------- DATE TITLE OF POSITION Copyright 2019 Albemarle County, VA PROJECT SHEET EN18-002-975 2/l/2020 4:34:07 PM d11350701A.dgn Plotted By, mlchoel.mltchell O N O N N U C 0 0 a c 0 c L 0 T E Y 0 T 0 0 + 3 0 c U U 0 a C c O c 0 i E T O a 0 C 0 c 0 0 N L 0 -C 0 3 0 3 c E 0 C O c O N C m L N 0 O E C c 0 0 m L 0 M n 3 L U -C 3 L 0 w C U c 0 a� O a L a U a 0 L + L O C 0 C m C c m O U O C E c 0 0 L -C N U) L O C c c 0 U) + n O -C 3 L 0 + C C E E 0 0 PROJECT MANAGER -VAZZ_W=,OAILI,&J4)_8Z29 01_ SURVEYED BY, DATEb&BSURILEY_&_MAPPLN-G.//C-OZ/2312Q1g_______ DESIGN SUPERVISED BY_XddllfljELL_PE._ DESIGNED BYICLMLEr-L-1Q1311L-&— A=fO AZEZLNC__________________ SUBSURFACE UTILITY BY, DATE DESIGN FEATURES RELATING TO CONSTRUCTION _�ATION OR TO REGULATION AND CONTROL OF TRAFFIC INDE "`7 ]P' MAP OT' SHEETS MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT ALBE4MRLE COUIVTY � PRQI.EN/8-002-975 W oc p 2 �Fc9Fs sl I slD s 601 INGLE Jack Jo tt LE MR Rd U 6 'P AHEM c�E LA o r ILLAG �.o RI� Alblmar BERT `J� a opa `+ Q 09 S SEE GRID G3 G4 r 1 HESSIAN HILLS WAY ■ MIN OR �A ' PK� HS Ro ,�¢ EwoO cr Ro ¢ 9 lvy - K o m O S92 f 2 HESSIAN HILLS CIR HILLS RIDGE Creek Gt ' o R,y 6 C 3 HESSIAN 4 BARRACKS PL OP s GE 5 BARRACKS CT ¢ RD EST PF OP O' Fqa TURTLE oN ROgO AC4,OUq °O M N TV U EQE� 99�(� o OC ACA T ERR ELL 9p s� co° l �O °Q a�'`p�a v REY NAflD DR cCo °9 '° tA \ c 0 R 1 T4�lY FARM � _ c, m wN 77 � $ ENNINCT SOlO 4$ S� O F HO OR °Q�a . _' M �yyoy 9FFNTTONEC RCS INO Opp 0 �lm�/a0 _"0 9'- QO 29 fC Fq 3N CC ,`Q0 p VgVER OR Oa oo S 5 o D AN - \➢, = 'Pt oy /a o T °j P Ctr tp�` i0S �,SaF pip COLONNADES m "-3 a¢ \05 F/F� k c ��C Plaza,,. Q s LAKE ° CANTERBURY a° eo 5 3 _ , 9 °Qe �v ''� Aq K! �tr P o ¢ RO -.. tia`T WO gtp\41 C OOHH c FRANKU F! 0 ti 9 °.A,v°4E a yT0 ♦8 e4 O° E 9f (��G\P � OU 04Y Q 9 9 �K1pV`N` ' FARMINGTON ` NEi DNrs Saint - /(��n cHSTCT Q �tiE y 5Q 5 x O o o SEE toN NlV Y 0 i lA MAP El fieldL. c °qc D9 `¢ `a 5 ° FOR ENLARG p ° AULCONER G < a iv V }� �y a� DpIAY CT q 9ry 55 5 y U N IV R °�H Y a"` racks Ra /o �. � ° AC 1p ON S N00r MQOE��/gy'fF� GENTi1Y L Ao oQ P S' QW C�99Oe R ° OAS PARK 0FC e/ �✓ �o RoBd P Ctr �9O o 14 fk t / e '.J erLy l CONDOS :�\ OROU Q� FRRUCE ¢ o RW/ 09 y Pro- A, Ol0 yti OR / �O r�/i o CSpia MMb OkFO� 8 FI11 B�OF°90 9O OP S�o �./ qD 9p N P~ Q OK�S °4t/ 6O1 °G ` Q 9 4� SO9 Ll 7� qo 9O2yFFo F - P/ 4� m 61!'�YOYd $ O OW J� �= 3� Ep�SO 0 Pail M4S ,. QJ~/W WjaS aOq�!?' QOO 0 51 T ! = AY 0 GC Univ A s 0 a" Arena °o �9� °c c° 3SyE 00 w qOe° #4 f wEsrw ° nJo lV o cF EONAM 90 .L .. tin' VA ¢ / ViS f ftr \ y / r SQ f Hall G Bnai F n Hip `� ry 4h C0A r NEE BET ARDW000 LG `^. "' Q\. �`.a �Z AAV MHERS7 a i o� ♦Od � � / " _ �2p00 .° °e� /kS 'Q /� °$ c °°i P9Z 4t1 E!y 9oG ¢ Si O i BOSSE EL- ,,bi000 QOS`L` eET ^ MY/Q ,.f 4 0 29 eea yLEW 1 $09 0 e S DEER ptR i o 0 5 W S Rp O O Ob9FSF CC3RMICK c a i°v g e ROTUNpq [r Sr 0 RO . 9 0� �� 4/�\_ " IANoy y N 0 _ RID D E12 I, �, Rp i 1-4 BROw1- S ti 1 CATALPA 2 CATALPA CT 3TUPELO CT MCC i e r•C °0 G �O . O O L Foe 2Q \ \. 9'�0 �, 4 TUPELO TEAR 5 JEFFERSON RIDGE DR I IIIficcofrtM�_ Dlservatoq I \ S on Stadiu (DaYI ! r 6SILVERBELLTERR 7 SILVERBELL CT 8 WATER OAK CT t0 I p�HarrlSo ill. TW o9 3 ;� (q ).� F,y7E 0 W ? M ST . Am 9 LACEBARK TERR .• I % r vF old) O/ c �. .. 4//,ti Sr OQ' C v l�R` o a X. �v g0 'IW4E �3 k(0 0 \EVq T 3 ll'c. I"�GHA HFF I GS'HF y P $ iy yt 1pOD N, /' g/, ti �b ST ,pia �US CT rn $ •`.c s y Z �PgICE A 9 �q yCl Q l FO F �\O ST E r L< �z Q 'y St F s I 9 0 YE,\MOSOP H Bold E ,p p �.., Qjr h 9GP AD 7e�ily y E A Er DDA O 6ROp FORE E., UIIlNr IRS VO O@ < QQS/ WE3TE L C' ~m PZ ROBERTSON a t pvE SJdy�°J� OOgw� a`" $ 0 F TSOAlF CG O Pp� �`r AVE P p�E E EQ�O`Q.e QES 702 2 Q �a ONT p`1 q- V \Dti to AYMOND A E QQi TAAIIAIDGE ROB, a s. °�`/� Fe Hills 2Q// <9q, `� 4FO ESEARC ARID xv, ;1$HLLLL D 100 s OE R q j� ��-- TR s S00NG EXT FRYS II W $ F�� rQ (E ESTM hnsonl R 0 Y ES y,OQ / qaU, ° °ro Exi 1 ` SPRING N08 PEE/Q7 �o O9� ¢ $ 09 v pO Q �0 \ S°a i Q RKs ¢■ O ., P 'toa 41,E f9'Zb \�_ \4 'V YYL R �j aPo Ft�11 j'e) e �r 1� VIEv don Avenu q. Park `F4 I LL K A o �'yd"� NLOTTESV°�CEOARW000 OP ti °° '� � 11 P Nppp15 � o ,� S l R`• ON �/ EQ °may PQO �iE`�. G4 0 F TRI3 Sf 1�`Z' 3�1 R� �.°� ,� �ON,OSE\EK��F qD ° °H \`Y \OE e•�o o YSa xN LANDIN 4 CIR 29 SAS SFIERIN OD p 40 ' r90 RIDGE ¢ �%Q`WP ____' >� ollll N OOEF ollq ,p f P/!Q ��q `arC EacksS 18 SQY N f!pF° E\ OR I L yG, _ 00 F.AR S RO °\\\\G �PCS OL N �1= rn RU �,SrA �C1`�00 r'! C 'i OE a RO J`� ,x 5 F° m� c F /tiC RFrI�FYF 4p? O � .. i `IC .. A N A •_�__ w_� A ` O _ C PE A 4 Avon Copyright KAPPA Map Group Permitted Use Number BJE071J SCALE 0 30001 60001 SHEET N0. DESCRIPT ION STATIONS I TITLE SHEET IA LOCATION MAP / INDEX OF SHEETS IF(l) THRU IF(2) WATER QUALITY AND QUANTITY DATA SHEET n/71 rllnll n/n1 nl—A77—nA/ A/nrl—n 2C(U THRU 2C(3) EROSION AND SEDIMENT CONTROL NARRATIVE AND DETAILS 2D(U THRU 2D(4) BMP DETAILS 47— LL 3 SIDEWALK PLAN 3A EROSION AND SEDIMENT CONTROL PLAN (SINGLE PHASE) LAMBS LANE STA.300.00 TO STA.306.75 E�r';�r' i y(_ _ I ILAMBS LANE STA. 300.00 TO STA. 306.75 4 SHARED USE PATH AND SIDEWALK PLAN 4B EROSION AND SEDIMENT CONTROL PLAN (SINGLE PHASE) 5 SHARED USE PATH AND SIDEWALK PLAN 5A EROSION AND SEDIMENT CONTROL PLAN (SINGLE PHASE) 5D BASE BID ONLY INSET 6(I) DRAINAGE DESCRIPTIONS 6(2) STORM SEWER PROFILES 6(3) STORM SEWER DETAILS al��//-//�l� �!�/--�r� E7� !'—17�3r�t1��!'1rw17��IIli���t�l� lr !•���'lr Mom TOTAL CROSS SECTION SHEETS:28 (SEE CROSS SECTION SHEET I FOR INDEX OF SHEETS) SHARED USE PATH STA.99.97.62 TO STA.I06+50 LAMBS LANE STA.306.75 TO STA.314+25 SHARED USE PATH STA.99.97.62 TO STA.109.08.84 SHARED USE PATH STA.99.97.62 TO STA.106.50 LAMBS LANE STA.306.75 TO STA.314.25 SHARED USE PATH STA.I06{50 TO STA.109.08.84 LAMBS ROAD ST A. 202+33.97 TO ST A. 207+13.15 LAMBS LANE STA.314+25 TO STA.319+59.74 SHARED USE PATH STA.I06.50 TO STA.109.08.84 LAMBS ROAD STA.202-33.97 TO STA.207.13.I5 LAMBS LANE STA.314.25 TO STA.319.59.74 FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. _C I 21112020 4:34:23 PM d11350701F(1).dgn Plotted By: mlchael.mltchell N O Al N c N N 0 0 a C L O x E T C 0 O C O N L 3 0 L 3 F� 0 L 0 U C L L O a O a E 0 0 L 0 a 0 3 + L L 3 0 U C C 0 a a U U N a N 0 T 0 a C m c U u) 0 0 ID c E L V) c 0 0 m L N L a 0 W a 0 L 3 L 0 CC E E 7 O PROJECT MANAGER JyATT_KERTYAk.L4_34)_8Z29.5Q1_______________ SURVEYED BY, DATE d&B-SLJBLEY_&_MAPPIN-GJIQ,-OZ/2322Q/g DESIGN SUPERVISED BY_LLYTQ&E11_PE._____________________ DESIGNED BY-KLO-FY--�lQEIV--& A=fLATEZLAlf__________________ SUBSURFACE UTILITY BY, DATE AQCLlV_4BK_0Z1J112Q14 WATER QUALITY SUMMARY ❑EQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version3.0 8MP Design Specifications List., 2013 Draft Stds &Specs Wpdafe SummorySheef Site Summary - Linear Development Project*** !=mr.evv^: Prinf Total Rainfall (in): 43 Total Disturbed Acreage: 2.11 Site Land Cover Summary Pre -Re Deve I oo me rrt Land Cover facresl A soils BSolis O: Soils DSoils Totals %af Total Forest/Open (acres) 0.00 0.92 0.00 0.00 0.92 44 Managed Turf (acres) 0.00 1.15 0.00 0.00 1.15 54 Impervious cover (acres) 0.00 0.03 0.00 0.00 0.03 2 2.11 100 Post-ReDevelooment Land Cover facresl A soils RSoils CSoils DSoils Totals of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 1.72 0.00 0.00 1.72 82 Impervious cover (acres) 0.00 0.39 0.00 0.00 0.39 18 2.11 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Post Post- Pre- (Post-ReDevel opment Development &NewIm ervi ous p ) ReDeveloprnent (New lmpenrious) eDeveed Re Devel oprnent site RV 0.34 0.21 0.95 0.16 Treatment Volu me ft3 2,5S9 1,367 1,222 1,016 TP Load (lb/yr) 1.63 1 O.S6 0.77 0.64 Baseline TP Load (lb/yr): 0.718582143955 'neaucnen oeuw new deve��ymenrread �:m noon nor rapu:�eo Total TP Load Reduction Required (lb/yr)0.76 N/A­NjAxxs ""This is o linear development project Final Post -Development Load (Post -Re Development & New Impervious) Pre - Re Development TN Load (lb/yr) 11.64 4.74 ------------------------------------------------------------------------------------------------------ Site Compliance Summary- ***Linear Development Project Pre- Final Post- Post -Re Dev el op m en ReDevelopment Development TP Load TP Load per acre per acre TP Load per acre (lb/acre/yr) Ih acre r Ib acre r 0.36 0.77 DA9 Maximum%Reduction Required Reb " Note, % Reduction will reduce post -development TP lood to less thon or epuol to baseline food of 0.721b/yr(0.41.;bloc/yr) Pre-ReDevelopment Load 2015 (Post-Dev Reduction Requirement=Post-Dev TP load- baseline load of0721b/yrj, hoseNne loud=siteoreox 041 lb/oc/yr Total Runoff Volume Reduction (ft3) 0 Total TP Load Reduction Achieved (I b/y r) 0.00 Total TN Load Reduction Achieved (Ib/y r) 0.00 Remaining Post Development TP Load (lb/yr) 1.63 Remain ing TP Load Reduction (Ib/yr) Required 0.76 THIS PROJECT IS REOUIRED TO REDUCE THE TOTAL PHOSPHOROUS LOAD BY 0.76 LB/YR OVERALL. THIS REOUIRE4dENT IS TO BE SATISFIED VIA A PURCHASE OF NUTRIENT OFFSET CREDITS. N ENERGY BALANCE SUMMARY [OUT FALLS A, B, & C) PRE -DEVELOPMENT Outfall Area (acres) CN Tc (minutes) Runoff Volume (cu ft) 1-yrQ (cfs) A 1.36 57.0 1 12 1283 0.21 B 0.49 61.0 10 684 0.17 C 0.14 61.0 5 178 0.07 POST -DEVELOPMENT Outfall Area (acres} CN Tc (minutes} Runoff Volume �cu ft} 1-yr Q (cfs} 1-yrQ Allowable (cfs) 1-yr Q Improvement Required (cfs) A 1.41 68.3 12 3430 1.17 0.06 1.11 B 0.49 65.0 10 945 0.29 0.10 0.19 C 1 0.14 1 68.6 1 5 1 316 1 0.15 1 0.03 1 0.12 WATER QUANTITY SUMMARY Wo, 1, \LN\ DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT DETENTION SUMMARY [OUT FALLS A, B, & C) 1-YEAR (Cfs) 10-YEAR (Cfs) 100-YEAR (Cfs) Post -Development I nflow to BMP A 4.17 10.91 20.93 Post -Development Outflow from BMP A 0.99 2.88 19.14 Post -Development I nflow to BMP B 1.32 3.37 6.37 Post -Development Outflow from BMP B 0.66 2.75 6.21 Post -Development Inflowto BMP C 1.02 2.38 4.31 Post -Development 0utflow from BMP C 0.78 2.18 4.25 Stormwater Outfall Table Site Area (Acres) 2.11 Outfall A* {outfall B* Outfall C** Outfall D Outfall E*** Outfall F Pre -Development Drainage Area From Site (Acres) 1.36 0.49 0.14 0.03 0.03 0.07 Post -Development Drainage Area From Site (Acres) 1.41 0.49 0.14 0.03 0.03 0.01 Pre -Development Overall Drainage Area (Acres) 10.55 8.40 0.38 3.21 1.54 0.54 Post -Development Overall Drainage Area (Acres) 10.61 8.40 0.38 3.21 1.54 0.48 Runoff Reduction (cf) 0 0 0 0 0 0 Receiving Channel Type (Natural, Restored, or Manmade) Manmade Manmade Manmade Manmade Natural Natural Channel Protection Compliance Method Energy Balance Energy Balance Energy Balance 2 yr. Post Q is Non -Erosive and conveyed by Manmade Systems until 1%D of watershed 2 yr. Post Q is Non -Erosive and conveyed by Manmade Systems until 1%D of watershed Energy Balance Flood Protection Compliance Method 10 yr. Post Q < 10 yr. Pre Q 10 yr. Post Q r 10 yr. Pre Q 10 yr. Post Q < 10 yr. Pre Q Confines 10 yr. Post Q unti 1 1%D of watershed Confines 10 yr. Post Q until 1% of watershed 10 yr. Post Q < 10 yr. Pre Q 1-year 2-year 10-year 1-year 2-year 10-year 1-year 2-year 10-year 1-year 2-year 10-year 1-year 2-year 10-year 1-year 2-year 10-year CN Existing 69.3 N/A 69.3 89.2 N/A 89.2 82.3 N/A 82.3 N/A 73.9 73.9 N/A 81.2 81.2 77.9 N/A 75.3 RVExisting (CU FT) 27399 N/A 93565 60834 N/A 134993 1,830 N/A 4627 N/A 14618 30331 N/A 9674 18179 271 N/A 5338 QExisting (CFS) 9.56 N/A 35.76 23.28 N/A 49.92 0.91 N/A 2.25 N/A 7.31 15.02 N/A 4.79 8.86 0.14 N/A 2.64 CN Developed 70.7 N/A 70.7 89.5 N/A 89.5 84.9 N/A 84.9 N/A 74.1 74.1 N/A 81.6 81.6 61.0 N/A 74.6 RVDeveloped (CU FT) 29928 N/A 97226 61452 N/A 135256 2066 N/A 4967 N/A 14757 30530 N/A 9834 18387 13 N/A 4640 QDeveloped (CFS) 8.41 N/A 31.12 23.06 N/A 49.90 0.78 N/A 2.18 N/A 7.38 15.11 N/A 4.87 8.95 0.01 N/A 2.30 Qallowed (CFS) 8.45 N/A 35.76 23.09 N/A 49.92 0.79 N/A 2.25 N/A N/A 40.00 N/A N/A 9.00 2.33 N/A 2.64 VDeveloped (ft/s) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 19.27 N/A N/A 3.50 N/A N/A N/A N/A VAllowed (ft/s) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A (Paved) N/A N/A 4.00 N/A N/A N/A N/A VExisting (ft/s) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 19.22 N/A N/A 3.48 N/A N/A N/A N/A Outfall Location (Lats/Longs) 38.0770,-78.5034 38.0771,-78.5004 38.0770,-7(g.5054 38.0782,-78.5043 38.0791,-78.5043 38.0763,-78.5049 NOTE: All 1-year calculations are derived from the drainage area within the site boundaries. All 2-year and 10-year calculations are derived from the overall drainage area reaching the outfall. *Detention Basins [BMP A and BMP B] are utilized at Outfalls A and B to meet water Quantity requirements. All calculations for these outfalls reflect overall pre -development undetained runoff vs. overall post -development detained runoff. See Energy Balance Summary and Detention Summary [this page] for more information. **An Underground Detention System [BMP C] is utilized at Outfall C to meet water Quantity requirements. All calculations for this outfall reflect overall pre -development undetained runoff vs. overall post -development detained runoff. See Energy Balance Summary and Detention Summary [this page] for more information. BMP Chas been designed to meet the water Quantity requirements necessary under the scenario that Additive Bid Item #1 is constructed along with the Base Bid. ***Calculations at Outfall E are analyzed at the point of confluence between Outfall E and a watershed totaling 22.66 acres [1%O Point]. THIS PROJECT IS DESIGNED ACCORDING TO PART IIB TECHNICAL CRITERIA FOR WATER OUANTITY AS STATED IN VSMP REGULATION 9VAC25-870-62 (et seq.). EACH OUTFALL IS DESIGNED TO MEET CHANNEL PROTECTION CRITERIA AND FLOOD PROTECTION CRITERIA. FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. r I 21112020 4:34:32 PM d11350701F(2).dgn Plotted By: mlchoel.mltchell C) N N N U C 0 0 a 0 T E Y O + T O 0 3 D + 0 U O O O x i E 0 0 a 0 0 c 0 0 0 L 0 -C + 7 C t 3 0 3 + C E U 0 0 0 m L L N O O E 0 0 0 a 0 C a L a N 3 r U -C 3 0 O w C U C O N O a L a U .a L + 0 0 c c 0 0 + E 7 L c C 0 -C C y N O C 0 n 0 U .3 0 + Cc E ti O PROJECT MANAGER -VAZZ_W=,YAN_&J4)_87295Q1—___ SURVEYED BY, DATE.LRIBS1/R1LEY_&_MAPP1N-G.11Q,-OZ/2312Q1g_______ DESIGN SUPERVISED BYA1LMLTfdE11_PE._____________________ DESIGNED BYICLMLEr---/Q1311L-& A=fO AZEZLVC SUBSURFACE UTILITY BY, DATE WATE]LD'V QUALITY AND GUANTITY DATA SHFA(ET Richmond, Virginia HYDRAULIC ENGINEER �IY AMKYS1S'PO1N7 WATERSHED CF6R OUTFALL E7 � (OUT FALL E) I I II I \ II I ---- / OUTF LL A I ;I I orrc, , .... \\ \ / OUT FALL C / /i / I LEGS D PROJECT AREA ("A -SITE") — — — — POST -DEVELOPMENT OVERALL DRAINAGE AREAS W_ POST -DEVELOPMENT "A -SITE" IMPERVIOUS LAND COVER ILJ JJr � a � p j 1=________-- IQ'. I ✓ I I . . .............. . All \ ITfALL I J DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. -C I 21112020 4:34:45 PM d11350702C(l).dgn Plotted By: michoel.m/tchell N N N PROJECT MANAGER JyAZZ_KERTYAk.L4_34)_8Z29501_______________ SURVEYED B Y , D AT E N&B -SLJB LEY_ & _M-APPIN-GJIC,-OZ/23220/g DESIGN SUPERVISED BY_LYTD&E/1_PE._____________________ DESIGNED BY-KLO—FY--�lOR11L-&- A=fLATEZLAlf__________________ SUBSURFACE UTILITY BY, DATE_(:CUILIABK,_0Z1_112014_____________ E&S CONTIDXOL NA TI D ATIVE & DETAIL SHEET 1XJ11V GFNFRAI CONSTRUCTION NOTES FOR F&S PIAN 0 THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2.) ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3.) ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4.) A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5.) PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6.) THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7.) ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8.) DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9.) THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. /0.) ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. /0 ALL EARTH MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY,FREE OF ROOTS, STUMPS, WOOD,RUBBISH,AND OTHER DEBRIS. 12.) BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13.) ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301OF THE CODE OF ALBEMARLE. 14.) BORROW,FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 A.M.TO 9:00 P.M. l5.) BORROW,FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT,OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16.) THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF PROPERTY. 17.) TEMPORARY STABILIZATION SHALL BE AS ON SHEET 2F, ROADSIDE DEVELOPMENT SUMMARY. 18.) PERMANENT STABILIZATION SHALL BE AS ON SHEET 2F, ROADSIDE DEVELOPMENT SUMMARY. 19.) MAINTENANCE. ALL MEASURES ARE TO BE INSPECTED WEEKLY AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME 1S FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20.) ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED,SUBJECT TO APPROVAL BY THE COUNTY EROSION AND CONTROL INSPECTOR. 2I.) CONTRACTOR WILL BE REQUIRED TIO KEEP THE PROJECT'S STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND POLLUTION PREVENTION PLAN (PPP) UP TO DATE AT ALL TIMES. 22.) CONTRACTOR WILL BE REQUIRED TO COMPLETE ALL RECUIRED EROSION AND SEDIMENT CONTROL INSPECTIONS AS RECUIRED IN THE SWPPP AND DOCUMENT THE INSPECTION ON VDOT FORM C-107. 23.) CONTRACTOR SHALL HAVE AN ESCC CERTIFIED PERSON ON -SITE WHEN LAND DISTURBING ACTIVITIES ARE TAKING PLACE. SEQUENCE/MAINTENANCE: a.) Contractor shall provide 48 hours notice to the project manager prior to the start of construction. b.) The CRLD must be at the pre -construction meeting. c.) Community Development Inspector must be notified of the offsite borrow or spoillocation at the on -site pre -construction meeting. d.) All erosion control measures will be installed as the first step in the clearing process. e.) No erosion control measure Will be removed Without approvol of the Community Development Inspector. f.) All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities until stabilization is achieved. g.) Access to properties shall be maintained at all times. h.) Driveway material shall be replaced with some or better material. i.) The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control device shall be made immediately. j.) The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the Comunity Development Department. k.) The contractor shall have pipe barrels and riser structures on -site prior to any land disturbance permit issuance. MS-1 Any area that has reached final grade must receive temporary or permanent soil stabilization within 14 days. Areas not at final grade that will remain dormant longer than 30 days must have temporary soil stabilization within seven days. Areas that will be dormant longer than one year must have permanent soil stabilization. MS-2 All soil stockpiles and borrow areas must be stabilized or protected with sediment trapping measures. Temporary protection and permanent stabilization shall be applied to all on -site soil stockpiles and borrow areas and soil intentionally transported from the project site. MS-3 Permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion. MS-4 Sediment basins and traps, and perimeter ESC measures intended to trap sediment must be constructed as a first step in any land -disturbing activity and shall be made functional before upslope land disturbance takes place. MS-5 Stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions immediately upon installation. MS-6 Sediment basin and trap design information. ** MS-7 Cut and fill slopes must be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. MS-8 Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. MS-9 Whenever water seeps from a slope face, adequate drainage or other protection must be provided. MS-10 Inlet protection is required for all storm inlets that will be made operable during construction MS-11 Before newly constructed storm water conveyance systems are made operational, adequate outlet protection and any required channel lining must be installed in both the conveyance channel and receiving channel. MS-12 When work in a live watercourse is performed, precautions must be taken to minimize encroachment, control sediment transport, and stabilize the work area to the greatest extent during construction. Non -erodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used if armored by non -erodible cover materials. MS-13 When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of non -erodible material must be provided. MS-14 All applicable federal, state, and local regulations related to working in or crossing live watercourses must be met. MS-15 The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. MS-16 Underground utility lines shall be installed in accordance with the following standards in additions to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. C. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged so that it does not adversely affect flowing streams or off -site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Re -stabilization shall be accomplished in accordance with these regulations. f. Comply with all applicable safety regulations. MS-17 Construction entrances are required at all access points to the construction site. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This applies to individual development lots as well as to larger land -disturbing activities. MS-18 All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures must be permanently stabilized to prevent further erosion and sedimentation. MS-19 Adequate outfall information ** ** MS-6 and MS-19 deal with the design aspects of the plan. For further information, please consult the latest edition of the Virginia Erosion and Sediment Control Handbook. Also, refer to the sediment basin/trap design tables and the adequate outfall table located on the "Erosion and Sediment Control Standard Details/Calcs."sheet. Any variance to the above listed minimum standards must be requested and approved in writing. DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT EROSION AND SEDIMENT CONTROL NARRATIVE SITE I QC:ATIQN: This project is located at the Albemarle County Public Schools complex housing Mary Carr Greer Elementary School, Jack Jouett Middle School and Albemarle County High School. PRO,IF('T f)FSCRIPTIC)N: Project construction Will consist of pedestrian safety improvements along Lambs Lane. EXISTING SITE CONnITIC) S: The site contains on asphalt -paved Local Rood With paved shoulders and roadside ditches. Site topography ranges from flat to moderate slopes. ADJACENT AREAS: This site is adjacent to commercial properties, With access from Route 10 and from connecting streets. OFF -SITE AREAS: Several off -site areas Will be disturbed for the project. Areas include construction of fill and cut slopes, construction of temporary erosion and sediment control measures, utility relocations, and permanent drainage features (including culverts and/or storm sewer). SC)II S: The project corridor consists of fine sandy loam and gravelly sand loam (Hydrologic Soil Group B) CRITICAI AREAS: Critical areas for this project include the outfall located between the entrance to Albemarle High School and Jack Jouett Middle School. FRC)SIO �A JP SFPI FLIT CC) TRC)I MFASURFS: Erosion and Sediment Control plans have been included and depict erosion control construction sequencing, temporary silt fence, temporary seeding, inlet protection, check -dams and permanent seeding. PERUALIENT STARII 17ATION-* All disturbed areas will be stabilized with permanent seeding immediately following finished grading. Seeding will be done per the Roadside Development Summary Sheet 2F. ,;ToRKAWATFR RUNC)FF CONSInERATIC)LIS: This project complies with part IIB of the VSMP regulations. It meets Channel Protection and Flood Protection criteria at both outfalls through the use of underground detention pipes or a detention basin. CAI CHI ATIONS: Pipe Capacity and Channel Adequacy calculations are included in corresponding Drainage Narrative Report. FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. r I 21112020 4:34:48 PM d11350702C(2).dgn Plotted 8yr michael.mitchell O N O N N U C 0 0 a C c 0 c L 0 T _0 E Y 0 T 0 0 •3 a w U c N 0 0 0 0 m h a C c 0 C 0 I E D 0 0 0 0 C c 0 0 -C D 0 0 c Iu t 3 0 3 C 0 U 0 m 0 c 0 O L 9 0 0 0 a L L 0 3 .0 U 3 0 w C U 0 0 a L a U a w 0 r 0 T C 0 '0 '0 a) C c N 6 U aLi 0 0 0 c E� N c 0 0 c a) L a) L a In c C 0 0 0 r 3 L 0 } Cc 0 r r PROJECT MANAGER-A/(ATL_W=MAA &f4J_8Z2_45Q1_______________ S U R V E Y E D B Y , D AT E &&8-SUDIZEY_ & _MAPPII�G,LLC, _0Z/2312Q1g _ _ _ _ _ _ DESIGN SUPERVISED BY_ALMLTf11ELL_PE.____________________- DESIGNED BY _KbVLEY-_H_0RAL -&- A=_CL TES,INC- SUBSURFACE UTILITY BY, DATE ACCUZ1_18&_OZ/JIl2QI_9____________- 1992 III I II I I �jf_L�� I D.o DROP INLET II Pq., WITH GRATE SEDIMENT SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE, Source: Va. DSWC 1992 III - 38 R 0 CK CHECK DAM 3 3.07 Plate 3.07-3 3.20 1 h N 1992 3.07 BL 0 CK & GRA VEL C URB INLE T SEDIMENT FIL TER CURB INLET RUNOFF OVERFLOW WATER WITH SEDIMENT SEDIMENT WIRE SCREEN / 2" X 4" WOOD STUD FILTERED WATER p G r TIII n IIII�I I� CURB INLET SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE Source: Va. DSWC 1992 III - 45 Source: Adapted from Installation of Straw and Fabric Filter Source: Va. DSWC Plate 3.20-1 Barriers for Sediment Control, Sherwood and Wyant 111 - 187 III - 25 Plate 3.07-8 3.05 Plate 3.05-2 TABLE 6-1 GENERAL EROSION AND SEDIMENT CONTROL NOTES ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia ' Regulations 4VAC50-30 I Erosion and Sediment Control Regulations. ES-2: The plan approving authority must be notified one week prior to the pre - construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. ES-3: All erosion and sediment control measures are to be placed prior to or as the first step in clearing. ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. ES-7: All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. ES-8: During dewatering operations, water will be pumped into an approved filtering device. ES-9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. VI - 15 Albemarle County Design Standards Manual - Engineering STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE EXISTING 27 2% PAVEMENT \--6" MIN. 21A AGGREGATE BASE PROFILE STONE 70' MIN. CONSTRUCTION ASPHALT PAVED ACCESS -� I WASHRACK (EXISTING 2% 2% PAVEMENT I2% T + *MUST EXTEND FULL WIDTH -0 POSITIVE DRAINAGE TO SEDIMENT OF INGRESS AND EGRESS } TRAPPING DEVICE OPERATION PLAN 12' MIN. POSITIVE DRAINAGE 2i TO SEDIMENT TRAPPING DEVICE FILTER CLOTH-/ SECTION A -A A nnumutun water tap of 1 nich must be nistaffed with a nrinnmum 1 nich ballcock shutoff valve supplying a wash hose 1,tiith a channeter of 1.5 niches for adequate constant pressure. Wash water must be carried away from the entrance to an approved settling area to remove sediment. All sediment shall be prevented from entering stoma (banns, clutches or watercourses. PAVED WASH RACK NO SCALE 1992 Page 8 of 23 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT 2016 ROAD & BRIDGE STANDARDS EC-2 12" MAX. 4:1 OR FLATTER 6" MAX. STEEPER THAN 4:1 ANCHOR SLOT I I� 0 CENTER ROW MAY BE I 2. ELIMINATED WHEN WHEN SLOPE I I I IS LESS THAN 4:1 I JUNCTION SLOT I I I I I 5' MAX. 4:1 OR FLATTER 3'MAX.STEEPER THAN 4:1 CHECK SLOT �I_ ANCHOR SLOT I I I I T MI /\�\ TERMINAL FOLD ,j" ` I -=�, I I I I I I I I I 1 EDGE AND END JOINTS TO LAP J01N��/� I- ' I 1 BE OVERLAPPED 2" MINIMUM. I 2" MIN. -- I I I I COMBINE THIRD ROW OF STAPLES FROM EACH STRIP IN LAP WITH ALTERNATE SPACING. TERMINAL FOLD I I I I 9" MAX. I I I I I I I I I 12 III- 2ARIABLE,Y ARIABLE_I - �. : - = -- : - I, _-IIII�I III III I I I I CHECK SLOT JUNCTION SLOT Il ter' To z° NOTES: V TO 2 �--I� " 1. APPROXIMATE 200 STAPLES REQUIRED JUNCTION SLOT 1RIABLE. PER 4' X 225' ROLL. Im 2. ANCHOR SLOTS, JUNCTION SLOTS AND CHECK SLOTS TO BE BURIED 6" TO 12" o AND VA .N0. 11 MIN. I I I I I t0 3. MAX. SPACING C-C CHECK SLOTS GAGE WIRE 100' SLOPE 4% OR LESS 50' SLOPE VARIABLE STEEPER THAN 4Y,. VARIABLE 4.STAPLES FORMED FROM NO.8 STEEL I= PLAN VIEW WIRE 8" STAPLE MINIMUM LENGTH FOR SANDY SOIL 6" STAPLE MINIMUM STAPLING DIAGRAM LENGTH FOR OTHER SOIL. CUT OR FILL SLOPE INSTALLATION DITCH INSTALLATION GENERAL NOTES: 1. ROLLED EROSION CONTROL PRODUCT IS TO BE LOCATED AS INDICATED 4. FOR SOURCES OF APPROVED MATERIAL SEE VDDT'S APPROVED PRODUCTS LIST ON THE PLANS IN ACCORDANCE WITH THE DIMENSIONS SPECIFIED ON TYPICAL SECTION. FOR EC-2 MATERIALS TYPES 1, 2, 3, OR 4. 2. "T-TOP" STAPLES OR OTHER MANUFACTURER'S DESIGN APPROVED BY THE ENGINEER MAY BE SUBSTITUTED FOR THE STAPLES SHOWN. 3. WIDTH OF MATERIAL MAY VARY FROM MINIMUM DIMENSION BY INCREMENTS OF 4 OR 5 FEET. A COPY OF THE ORIGINAL SEALED AND SIGNED DRAWING IS ON FILE IN THE CENTRAL OFFICE. XVD❑T ROLLED EROSION CONTROL PRODUCT SPECIFICATION REFERENCE ROAD AND BRIDGE STANDARDS PROTECTIVE COVERING INSTALLATION CRITERIA SHEET 1 OF 1 REVISION DATE 07/16 (TEMPORARY USE) VIRGINIA DEPARTMENT OF TRANSPORTATION 244 606 113.02 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS FILL SLOPE SECTION DROP STD EC-3 MATERIAL VERTICALLY - DOWNSLOPE i Sr v / AI FR i lq TOE OF FILL MAINTAIN SLOPE ANGLE 'OVERLAP AT ROLL TERMINAL / 4Q 2'-0" -111-1I o - N SOIL SHALL BE TAMPERED PRIOR TO LAYING TOP LAP OVER BERM TRENCH INTO BERM AND PROGRESS DOWNSLOPE SLOPE LINING - WET CUT SLOPE WATER SEEPAGE WHEN WATER SEEPAGE IS PRESENT IN A SLOPE THAT REQUIRES INSTALLATION OF EC-3 THE FOLLOWING DETAIL MAY BE USED WITH THE APPROVAL OF THE DISTRICT MATERIALS ENGINEER. STD EC-3 TYPE 3- VDOT No.3 AGGREGATE WRAPPED IN NON -WOVEN GEOTEXTILE FABRIC EXTENDED 12" ABOVE SOURCE OF WATER BOTTOM OF CUT SLOPE EC-3 TOP OF CUT SLOPE SDIL�, '_'NP,JER T pgLE C,2" DEPTH SLOPE LINING - DRY CUT SLOPE STD EC-3 TYPE 3 TOP OF CUT SL1 SOIL --A, - 2'-D" I NOTES: ' I' 1. SLOPE SURFACE SHALL BE SMOOTH AND FREE OF ROCKS, LUMPS OF DIRT, GRASS, AND 1- STICKS. MAT SHALL BE PLACED FLAT ON SURFACE FOR PROPER SOIL CONTACT. _ 2. STAKES SHALL BE WOOD OR METAL AS RECOMMENDED BY THE MANUFACTURER AND SHALL BE A MINIMUM OF 18 INCHES IN LENGTH. BOTTOM OF FILL SLOPE 3. EC-3 MATERIALS SHALL BE IN ACCORDANCE WITH THE APPROVED - I' PRODUCT LIST. - 17 `` 1- 4. FOR SOURES OF APPROVED MATERIALS SEE VDOT'S APPROVED PRODUCTS LIST FOR BOTTOM OF CUT SLOPE- ST-D. EC-3, TYPE 3 MATERIALS. 4'-0" 5. SLOPES SHALL BE SEEDED IMMEDIATELY PRIOR TO INSTALLATION OF ST'D. EC-3 TYPE 3 MATERIAL. OR SHOULDER A COPY OF THE ORIGINAL SEALED AND SIGNED DRAWING IS ON FILE IN THE CENTRAL OFFICE. BREAK POINT SPECIFICATION ROLLED EROSION CONTROL PRODUCT �VD❑T REFERENCE SOIL STABILIZATION MAT ROAD AND BRIDGE STANDARDS 606 (PERMANENT SLOPE INSTALLATION) REVISION DATE SHEET 3 OF 3 606 VIRGINIA DEPARTMENT OF TRANSPORTATION 07/16 113.05 2016 ROAD & BRIDGE STANDARDS FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 21112020 4:35:03 PM d11350702C(3).dgn Plotted Byr michael.mitchell N N N PROJECT MANAGER L4TT-W=MAA�&f4J-8Z2-45Q1_______________ S U R V E Y E D B Y, D AT E&&E —1!(JRI1EY_ & _YAPPII�G,LLC, -OZ/2312Q1g DESIGN SUPERVISED BY-ALMIIfl1ELL-PE._____________________ DESIGNED BY-KbVLEY--H-0R1V--&-A=-CZATES,INC- SUBSURFACE UTILITY BY, DATE 14CCLZM-A8&-OZ,JIV2QI-9_____________ Sediment Basin Drainage Area (Ac,) Wet Storage Volume (CF) Dry Storage Volume (CF) Required Provided Required Provided TSB-1 1.97 3,5E4 3,809 3,554 3,993 Invo OLjt= Bottom Elev. Sediment Cleanout Elev. Dewatering Orifice Elev. Dewatering Orifice Dia. Outlet Pipe Dia. Top of Dewatering Device Elev. 550.00 551.00 552.00 4 in. 24" 552.50 Design High Tap of Riser Riser Crest Emergency Embankment Freeboard Water (25-yr Elev, Diameter Spillway Elev. Elev. Provided Storm) Elev. 553.00 4 ft. N/A 553.39 555.50 2.11 X pavement Pavement X Ln / / / / \ ' x - / / / -Cl / / / / / / / / / / / / / / / / D X` D 4-5 / / ' 0/ .J / / / / / / / / / / CD' / 0 EC-2,TY° RCD-2 55% �)b 552/ 55 X Kimley-Horn & Associates Richmond, Virginia ROADWAY ENGINEER 4-4 M REVISED STATE STATE ROUTE PROJECT EN/8-002-975 VA. 9885 C-50/ DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT O1 1 1 1 P- I 1 1 1 1 1 1 I I I / SHEET NO. 2C(3) THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. SCALE PROJECT o io D EN/8-002-975 SHEET NO. 2C(3) 21112020 4:35:05 PM d11350702D(l).dgn Plotted Byr michael.mitchell PROJECT MANAGERL4TT-W=MAA�&f4J-8Z2-45Q1--------------- SURVEYED BY, DATE&&E-1!(JRILEY-&-YAPPII�G,LLQ,-OZ/23Z2Q1g------- DESIGN SUPERVISED BY-ALMIIfl1ELL-PE.--------------------_ DESIGNED BY-KbVLEY--H-0R1V--&-A=-CZATES,INC- SUBSURFACE UTILITY BY, DATE 14CCLZV-A8&-OZ/JIl200-----------__ NOTESO l� See Sheet 2D(2) for BMP Section A'-A1 9 O and the outlet pipe prof/ lea 2) A BMP certi f i cati on for each of the BMPs must be submitted with the signature and seal by c licensed prof essi on(7l prior to project closure. 3) Grading of BMP shall be surveyed and submitted to the Engineer f or approval of f i ni shed volume prior to application of f i nal topsoil o X / / / / / / / / / / \ 1 ^ / / / / / / / / / / / / / / / Inv. OLjt= X—_ / / / Q - / / / / / / / / / / / / / / / / / 4 D-5 / / / / / / n� r evernt 55/��� gMP Pavement_.__: -- O O / / / / / / / / / / / / 4-1 _'0 \ k x / / / / / / / / / } REVISED STATE ROUTE VA. 9885 STATE PROJECT ElV 18-002-975 C-501 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT Kimley-Horn & Associates Richmond, Virginia ROADWAY ENGINEER / -4 / 4 / / / / O / / J / I I / / / / / \ / / / / / I I 1 / 1 1 1 I 1 1 1 1 1 1 1 / I / / / / / / / FINAL PLANS SHEET NO.1 2D(l) THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. SCALE 0 10' 20' - -I PROJECT SHEET NO. EN/8-002-975 2D(l) 21112020 4:35:07 PM d11350702D(2).dgn Plotted Byr michoel.mitchell O N O N N U C 0 O 0 a c O 0 T E Y + T + O + 7 O L + •3 N a O L y U C N N O U O m t4 a C O C L O x T E Y T O 0 O c C, 0 L + 0 t L + 0 L 3 s� U O 0 0 U C O N L L N Q 0 LL E C O + O N N 7 N N L 0 a 0 3 L U L 3 L O w + U 0 0 0 a a U Vl 0 T 0 10 + c N N U L N N 0 O + C E� 7 L N C C O N O C L N L N C N y L L 0 U) c O + a 0 r + 3 L 0 + cc 0 r r PROJECT MANAGER L4TT-W=MAA� &f4)-8Z2-45Q1--------------- S U R V E Y E D B Y , D AT E &&E —'!URILEY- &-YAPPII�G,LLQ, -OZ/2312Q1g - - - - - - - DESIGN SUPERVISED BY-ALMITfl1ELL-PE.--------------------_ DESIGNED BY-KbVLEY--H-ORAL -&- A=-CL TE5,1N - SUBSURFACE UTILITY BY, DATE 14CCLZV-A8&-OZ/JIl2QI-9------------_ 11) 1 IM) imil)"i = mf 190�11[1 TOP OF EMBANKMENT BMP A - SECTION Al - Al (ELEV = 555.50) /0' TOP WIDTH 565 _- _�____ ____--, _-___-- TOP- -OF EMBANKMENT --- ---r---�---t----I---- t---- I ---- t---- I----rt---- r--- r----r---_ -__� € =1- 555.50) ---�--- , ---�—--r----I----T---,---- 100: R IELr J.9— -------Jt�TOP WIDTH 560---�--- r-------r----i---- - --i--- T i --r-- r----------i--- - -�------L--- i i --- i ---�----1-=_ TD /�� �---- I---- — --L----�-----�-------+'F1- ��—�VG�1—�-------� ----I 555 - ----�------------�-- - ---� ---�'---�--- -- ---�- __ ----i + +•�� I -- — — +- — — — — I ----r-- -- �71 ----fi----r--- —-�}-------r-------t----I 550----CRO(�1 -------r--- - rt-- --,---- I----r---I----,- ----I I~---���v*+-- rE--Ebp}�p� �{t —---��T—/ — ----———— r-- —----r—------r----� - i____I }}��_ I _1--�------------ ----! --- ----� --- ----� ----I 55 545--- —1----� Y1_= 1. 6rJ--—L----1----1----1----1------------L---J----L---J 0 /0 20 30 40 50 60 TO 80 6" DIAMETER ORIFICE (ELEV = 550.00) PIPE PROFILE 4-6 TO 4-5 PROPOSED GRADE 565 -- --- - 1�--—�----1- --a �_ ----- ----i---- -- ---- i----i �- ---r- (t-I----t----i----1 563 Q0�I----�,---t-�--p�----r----,----1 ---- - �'------r---- i ----� L— — — --- I r-----——— — ----I �—--L— L — — — — ----1----L—J----L--------� 555 ---�---L---------------� ----4-- - -----------a INV = 550.00 —� 550 40.w 1-40 ----r----I----1 ------------------ 545 0 24 LF /0 20 30 24" CONCRETE PIPE REO'D. /.8 7. DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 21112020 4:35:09 PM d11350702Df31.dgn Plotted Byr michael.mitchell N N N 0 N L + 0 U C O N 0 L 4- O a) Of t 0 a d L CL 3 L U 3 O w + U C 0 a) 0 a t n w U a) a V) -C 0 T O 10 a) C m U a) 0 0 + L C 0 L + C U) 0 U) C •N a) O + C' U 0 U a) r + L 3 L + 0 + C U 0 U) r r PROJECT MANAGER (4TT-W=MAA� &f4J-8Z2-45Q1--------------- S U R V E Y E D B Y , D AT E &&E —'!URILEY- &-YAPPII�G,LLQ, -OZ/2312Q1g ------- DESIGN SUPERVISED BY-ALMIIfl1ELL-PE.--------------------_ DESIGNED BY-KbVLEY--H-OR/lL -&- A=-CL TE5,1N - SUBSURFACE UTILITY BY, DATE 14CCLZV-A8&-OZ/JIl2QI-9------------_ �IRMP '.R DETAILS \\/ / r o /S\ Con o C C-0- 07� School i gn \ Edge of veme t \\ S \ \ ---------- ------------- - ------------ \ S ---- -- --- ----------------- ----------- ------------- 1.1 - ------------------- ---------------- --------- -- M --------- e n ----- S---_- -- _%aVerr�e0 __-- _-__- _-_------_- _- __ S \ \ 560 /6 \ 1-- --7 r) \ lV \ \ C . \ v v 562 560 9 \ P o 0 0 C o o O C 0 _ NOT ESo24 R \ ODS l See Sheet 2DA for BMP Section B'-B19 '\ l Section C'-C'9 and the outlet pipe profile. Q" 2) A BMP certi f i cats on for each of the \\ \ \ C B Ps must be submitted with the l M w \ S signature and seal by a licensed \ S prof essi onal prior to project closure. \\\C C/ / 3) Grath n of BMP shall be surveyed and C� \ 9 y submitted to the Engineer for approval of finished volume prior to Gppllocctloon of \ l l f i ncl topsoil. \ \ \ O \ 1nv'.)9-Ljt = 559.6,� \\ • rn & Associates )n d, Virginia \Y ENGINEER REVISED STATE ROUTE STATE PROJECT EN/8-002-975 C-501 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT 20� FINAL PLANS SHEET NO. 2D(3)1 THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. SCALE NOR 0 iu 20' 9 PROJECT SHEET NO. EN/8-002-975 2D(3) 21112020 4:35:11 PM d11350702D(4).dgn Plotted Byr michael.mitchell O N O N N 0 a 3 + L L 3 O a� 0 a L a U N a Vl N L + L O w T C O 10 N U L 0 0 L c O N O L L a U) c O + a 0 r + 3 L 0 + cc 0 r r PROJECT MANAGER L4TT-W=MAA� &f4)-8Z2-45Q1--------------- S U R V E Y E D B Y , D AT E &&E —'!URILEY- &-YAPPII�G,LLQ, -OZ/2312Q1g - - - - - - - DESIGN SUPERVISED BY-ALMITfl1ELL-PE.--------------------_ DESIGNED BY-KbVLEY--H-ORAL -&- A=-CL TE5,1N - SUBSURFACE UTILITY BY, DATE 14CCLZV-A8&-OZ/JIl2QI-9------------_ 11M'�P R DETAILS TOP OF EMBANKMENT BMP B - SECTION B1 - B1 (ELEV = 562.50) TOP OF €MBANK)VENT 4-'TOP WIDTH - (ELEV = 562.50), 570 L___�-_ _�_-__ ___-�_ -- f00 -i'-I.WS-(€E-�6f.4 )------------ ---- 4 =0p y�IDT- -- ------ ---� -------------------� L--- f--- -----------------t----I— — +-----����----�--- t---- --- ----i ----I G --- t--- } --- 1--- —} ----I—--t__-r��----} ---- r -------r--- 1----t ----I ---�---- ---1— — --T — T---T--1----I----r---I----�-----�----Y ----1 565---�---- ---�-_GRAL)E-1----T --- i-= -T---i----� -- r---� -- r_---_� -- r--- 1 560}-----------------------------� -==-i ---c-u�--T--��+ ----�- ---3"---'---------�----�----4----�-----a----� ----1 L_/S7�NV-----I--------I— --+-----------I—l----4----—I — — —— I ----1 L-----f-------�----t----I-- —t--- �Flr1,�iS��-6. ��—f-----+----i-----I----i-----I 555 --- r----T -------r----I---- — rt---- r---- r-----r---- r-----i---- r ---- 1 ---- — --- --------r-------r----1----T— I� S€T F€L. 6E��T}�----F---7----F --I - - - - r - - - - I --------�-------�----1----——— —I---- ----�-------� --- — — — — F -------� ----I r-------�-------�----1--------I---- ----�-------�-------�-------� ----1 ----------------------------- 550 r---1---- L---J---- L---- J---- L---- 1----1----1---- 1---- 1---- I ---- L--- J---- L----1 0 /0 20 30 40 50 60 TO 80 BMP B -SECTION Cl - C' EMERGENCY SPILLWAY (ELEV = 561.00) 6' WIDTH 57'0 -------- ---------------- r---�---- -----------------1 565 L___=====r== _= I I I I I I 560--���:- r------------$bT�{} OF BASIN ---r r ----——_J----fi----1----1 555 L 1-------T------,--`----- — — — — _ PrtClE E�r�S�M� - _ - - GROU 550 L-1--------L---J----L--- J 0 /0 20 30 PIPE PROFILE 5-/ TOP OF €MBANOENT 570-------------(EL-E1 = 562.50) PROPOSEo==--'------'- GRAD----r---y---fi--------1 565 --1----- I----� EXISTING GROUND-\ __— -�— -- ___ --3T -- "'---L---J------- I ---- i 560 --------�------1----a INV = 559.00 --4f - -25=CIF-—J IV = 558.75 555 _ _ -` � rVC =P1gP - f _ _'D: _ _ _ --I -------�— ---I----L — — --I — — --� 550----1----1----L---J----L --- J 0 /0 20 30 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 21112020 4:35:17 PM dII350703.dgn Plotted By: michoel.mitchell N N N .l .l _ PROJECT MANAGER -VALL-WE YAIL-&J4)-8Z29501 SURVEYED BY, DATE.L&B�LIRJLEY_&_Y/,PP1N-G.//C.-OZ/2312Q1g______ DESIGN SUPERVISED BY-XY1-TfHELL-PE,_____________________ o DESIGNED BYICLMLEr�1Qf2 L-& A=fO AZEZLVC----------------- o�° SUBSURFACE UTILITY BY, DATE ACCL/V-RK,OZZILZ2019----____-____ o� WRY CARR GREER ELEMENTARY SCHOOL *6457 Storm Manhole Rim = 557.921 Inv. Out = 553.67' (l5" RCP to 117507) *7507 Storm Manhole Rim = 556°I7' Inv. In = 553°37' (l5" RCP from *6457) Inv. Out = 553.23' 05" RCP to Approximate Direction) o�`G o�� ��0 *750I Storm Manhole ' Rim = 560.931 (a) Inv. In = 556.52' (l5" RCP from Approximate Direction) (b) Inv. In = 556.501(I5" RCP from Approximate Direction) Inv. In = 556.49' (l5" RCP from *7502) Inv. Out = 556.53' (l5" RCP to *7505) 5' 117502 Storm Manhole \\ \\ F:1 Co _-__ X 60 V.\ vG i 5 \ 9 x TREES TO BE ' 5 / REMOVED DO NOT PSPr DISTURB l8,\,y��� COUNTY OF ALBEM.ARL SCHOOL BOARD AL —' T 216.69 ACRES...,",', (PER ALBEM'ARLE .''GIS DATA). '% .• Curve LOBS_LNI _ l5° NsEr e PI = 304.23.28 :. \S DELTA = 74° 05' 24.63" (LT) D = 23° 52' 24' T = 181.15' O , L = 3/0.35' G RB PC 302-42.15 DISTURB FCC = 305.52.48 o SPECIAL DESIGNCURB AND GUTTER. E .. SHEET DET � 0 93 Curve LAtiIBS_LN2 ,��' 2° GQ 0)\ PI = 307.84.66 JACK JOUET T - -� DELTA = 490 22' 58.82" (LT) MIDDLE SCHOOL D = ll° 20' 45" . 1 1 I L = 435.26' 1 ❑: R = 505.00' d PCC = 305.52.4 8 PT 309-87.74 i cl-cAin REFERENCES (PROFILES, DETAIL & DRAINAGE DESCRIPTION SHEETS, ETC.) DENOTES PROPOSED PAVEMENT. Survey Alignment Data Sheet /C DENOTES DEMOLITION OF PAVEMENT Construction Alignment lD(l)-02) �" DENOTES MILL &OVERLAY PAVEMENT Data Sheet (PROJ. EN18-002-975, C-504) Erosion and Sediment 3A !ADDITIVE BID ITEM '31 Control (Single Phase) 4_ •.° : •: a. DENOTES PROPOSED CONCRETE ITEMS Entrance Profile 3B Drainage Descriptions 6(l) DENOTES CONSTRUCTION LIMITS IN CUTS Storm Sewer Profiles 6(2) _ _ _ _ Storm Sewer Details 6(3) [F— — — DENOTES CONSTRUCTION LIMITS IN FILLS Pavement Marking, )Varker 7(3) & Signing Plans Kimley-Horn & Associates, Inc. Kimley-Horn & Associates Richmond, Virginia Richmond, Virginia HYDRAULIC ENGINEER ROADWAY ENGINEER REVISED STATE STATE SHEET NO. ROUTEI PROJECT VA. 9885 EN18-002-975 3 C-50/ DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT \l SST C ly 2 G� 1 . 3- 7 10 _a f T G'\ o1D G .\ `moo f �6 q r 'Buses 0 y j S. I Sign S� r • /.: 66.56' DO NOT DISTURB 3-2 '�� U ST'D. CG-12, TYPE A REO'D. 14 EXIST. PIPE TO BE ABANDONED A ST'D. CG-12, TYPE B REQ'D. A/5EXIST. PIPE TO BE REMOVED A3ST'D. CG-2 REQ'D. Z4� ST'D. RADIAL CG-2 REQ'D. 5 ST'D. CG-6 REQ'D. 6 ST'D. RADIAL CG-6 REQ'D. ZL FULL DEPTH SAWCUT AqHYDR. CEMENT CONC. SIDEWALK REQ'D. AloADJUST EXISTING UTILITY TO GRADE A//EXISTING UTILITY TO BE RELOCATED (BY OTHERS) 12 EXIST. UTILITY TO BE REMOVED A k EXIST. PIPE TO BE CLEANED OUT UT /LIT Y OVI/NERS CENTURY LINK ALBE4ARLE COUNTY SERVICE AUTHORITY THOMAS RENOY JUSTIN RAY TU SA, OK 74103 168 SPOTNAP ROAD E AIL: renoyJt)omos@centurylink.com CHARLOTTESVILLE.VA 22911 E AIL: NotionolRelocdcenturylink.com TEL: (434) 977-4511 ext,124 LA10S NETWORK R/VANNA WATER AND SEWER AUTHORITY GAS WRY ZYLOWSKI 5A4 W.BROADSSTREET FORT 695TORIA MOORES CREEK LANE CITY OF CHARLOTTESVILLE 305 4T H STREET NW WAYNESBORO,VA 22980 CHARLOTTESVILLE.VA 22902 OFFICE: (540) 949-3466 TEL: (434) 977-2970 ext. 205 CHARLOTTESVILLE,VA 22903 FAX: (540) 943-3333 FAX: (434) 295-1146 OFFICE: (434) 970-3815 EMAIL: ZyloWski@chorlottesville,org EMAIL: morris jpealumosnet com DOM/N/ON ENERGY coMcAST ,gLBEMARLE COUNTY SCHOOLS ANDREW J. BROOKS ROBERT REJONIS 70/ E.CARY STREET PHUNG DINH OFFICE: (434) 872-4569 RICHMOND, VA 23219 4391 DALE BOULEVARD FAX: (434) 984-8018 TEL: (804) 771-3655 FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. WO RIDGE, VA 22193 EMAIL: RRejoniseakl2olbemorle.org CELL: (804) 514-2277 SCALE E AIL: Phung_Dinh@comcost.com EMAIL: AndreW.J.Brookscdomcom E AIL: NED-BLT_Be/twoyRegionDesignRequests@cob/ecomcost.com EMAIL: Facility,Locate,RequestLadominionenergy,com 0 A' 50' PROJECT SHEET NO. EN/8-002-975 3 21112020 4:55:20 PM dII550703A.dgn Plotted 8y: michael.mitchell N N N + 0 0 a v 0 c 0 T E 0 T 0 + 0 L + 3 0 L N + 0 a 0 0 T E Y T O 0 0 + 0 0 0 0 s L + 0 3 + 0 3 + 0 + 0 L 0 L 0 0 a) 0 a L L a 3 L U 3 O w + c v 0 0 Q. a U U 0 L + 0 T O N N U L 0 + E L L c 0 0 L 0 U) n 0 U I 3 L I- 0 E 0 O r PROJECT MANAGER -AIL4TT-W=MAA�&f4)-8Z2-45Q!_______________ SURVEYED BY, DATE 1�&B-SJRILEY_&_MAPP1l�G,LLQ,-OZ/23Z2Q1g_______ oO i DESIGN SUPERVISED BY-ALMLTflI ELL -PE._____________________ Ok \ DESIGNED BY XLMLEY--H-0RAL -&- A=-C1AZE5,1N-C- SUBSURFACE UTILITY BY, DATE 14CCd.ZV-48&-OZ/JLl2QL-9___________-- IP-B CD 0'' AT NEXT DOWNS READ v INLET p Q *6457 Storm Manhole Kimley-Horn & Associa ---- o \\:; \ / �� Rim = 557.921 Richmond, Virgin Inv. Out = 553.67' (l5" RCP to 117507) HYDRAULIC ENGIN C *7507 Storm Manhole Rim = 556.17' Inv. In = 553°37' (l5" RCP from *6457) k-A\ Inv. Out = 553.23 05 RCP to Approximate Direction) \ \ N - , �' , /G �' \� jam' \\`♦ \\ \\ G a� #7501 Storm Manhole Rim = 560.93' (a) Inv. In = 556.521 (l5 RCP from Approximate Direction) (b) Inv. In = 556.50' (I5" RCP from Approximate Direction) Inv. In = 556.49' (l5" RCP from *7502) Inv. Out = 556°33' (l5" RCP to #7505) 117502 Storm Manhole Rim = 559.76 \\\ ��� `♦ \ \\\ \\\ \� // Inv. Out = 556.87' 05" RCP to 17500 COUNTY OF ALBEMARLE SCHOOL BOARD AL *7503 Drain Inlet 216069 ACRES Top - 557.961(PER ALBEMARLE GIS DATA) \ / Inv Out - 555 06 (l5 RCP t 7504) *7504 Top = Drain Inlet 557.95' ° 5 Inv. ° In Inv. Out - ' (l " from p750 552°95 5 RCP 3) = 552°90' (l5" RCP to Approximate Direction) \\ \\ °�� �'\ �\ *7505 /5" RCP @ Conc Endwall \ \ \ PSPr - F �e� /� \ \ \ Out = 553°50' \\ COUNTY OF --BEMARLEND \ SCHOOL B ARD A� ,'� \, 0� PRGJ° E _ / - '� N/8 0 - �� \\ 2/6069 ACRES' '\ \�e�r / I ADD/T/VE - ' -� 0�2� % \ \\ (PER ALBEM . RLE .' GfS DATA). B/p DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT v n y/ / / / / s / / / P y�e��� , �s�o BASE B/ 9 5, C-5p/ D eke z a \ •. `'. '. �/fib , \ / ROUTE 9885 M IP-B, Ip_B __ fLAti1BS LAHEI \ \ f 2 QC0IVSTR� � - V,60 i �a IP-A _ �\\ �. - Qvj� / \ TSF-A\ \ � .• �' \' TSF- �� , � � �, 0� ./ c�\ \ \ \, �. \ / 3_ I IPA \ 0 _ - � 32 EROSION & SEDIMENT CONTROL LEGEND occcocAi�cc' I . '9n_ �X� TSF-A Q RCD-1 _ RCD-2 IP-A IP-B C/P sT se LOD 00 EC2,Ty,1 Denotes Temporary Silt Fence, St'd EC-5 Type A or B Denotes Rock Check Dam, Type I; St'd EC-4 Denotes Rock Check Dam, Type II; St'd EC-4 Denotes Inlet Protection, Type A; St'd EC-6 Denotes Inlet Protection, Type B; St'd EC-6 Denotes Culvert Inlet Protection, Type C; St'd EC-6 Denotes Temporary Sediment Trap; St'd EC-7 Denotes Temporary Sediment Basin Limits of Disturbance Denotes Temporary Diversion Dike, St'd EC-9 Denotes Rolled Erosion Control Product, Temporary, St'd. EC-2 Type 1 b, ` FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 2/1/2020 4:35:24 PM d11350704.dgn Plotted By, mlchoel.mltchell N N N I PROJECT MANAGER -VALL-WERZYAN-&J4)-8Z295Q1_ SURVEYED BY, DATE.LRIBSURLILY_&_M_APELN-G.L1C.-OZ/2312Q1-9______ DESIGN SUPERVISED BY-XMLGl1ELL-PE, DESIGNED BYICLMLEr--�lQ1311L-& A=fO AZEZLNC__________________ SUBSURFACE UTILITY BY, DATE Curve LAN BS_LN2 PI = 307+84.66 DELTA = 49.22' 58.82" (LT) D = //0 20' 45" T = 232.18" L = 435.26' R = 505.00' PCC = 305.52.48 PT = 309.87.74 /FCFNn 1.0.:... ••I DENOTES PROPOSED PAVEMENT ��] DENOTES DE40LIT10N OF PAVEMENT �.� DENOTES MILL & OVERLAY PAVE4ENT (PROJ. EN18-002-975, C-504) !ADDITIVE BID ITEM *31 DENOTES PROPOSED CONCRETE ITEMS L`- _ _ _ _ DENOTES CONSTRUCTION LIMITS IN CUTS DENOTES CONSTRUCTION LIMITS IN FILLS Curve L4BS_LN3 PI = 3/2+04.2/ DELTA = 13. 06' 07.54' (RT ) D = /0. 54' 49" T = 60.29' L = 120.05" R = 525.00" PC = 311,43.92 PCC = 312.63.97 Curve LOBS_LN4 PI = 3/3+68.47 DELTA = 38. 33' 18.64' (RT ) D = 19• /0' 42" T = 104.49' L = 201.04' R = 298.75' PCC = 3/2,63.97 PRC = 314,65.01 COUNTY OF ALBEMARLE SCHOOL BOARD AL 216.69 ACRES -R ALBEMARLE GI S DA, Inv. Out = 561.13' @ Conc. Endwcll EXIST. FEN( TO BE RE EXIST. RIP RAP TO BE RE40VED ST'D. FE-CL REO. EXIST. PAVED DITCH TO BE REMOVED AIST'D.CG-12,TYPE A REO'D. AIEXIST.PIPE TO BE ABANDONED SAT'D. CG-l2, TYPE B REO'D. l5 EXIST.PIPE TO BE REMOVED 22 A3ST'D. CG-2 REO'D. A ST'D. RADIAL CG-2 REO'D. 5 ST'D. CG-6 REO'D. ST'D. RADIAL CG-6 REO'D. 66. A FULL DEPTH SAWCUT AqHYDR.CE4iENT CONC. SIDEW ALK REO'D. AloADJUST EXISTING UTILITY TO GRADE A//EXISTING UTILITY TO BE RELOCATED (BY OTHERS) 12 EXIST. UTILITY TO BE RE40VED A kEXIST.PIPE TO BE CLEANED OUT Curve SUP-1 PI = 100.08.71 DELTA = 20.56' 48.00" (RT ) D = 95.29' 35" T = 11.09' L = 21.94' R = 60.00' PC = 99.97.62 PRC=100,19.56 -1 �1`!. 01 Curve SUP-2 P/ = 101.38.71 DELTA = 39.09' 30.47" (LT ) D = /7. 06' 12" T = 119.15' L = 228.95" R = 335.00" PRC=100.19.56 PRC=102.48.51 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT Curve SUP-3 PI = 102+76.78 DELTA = 50.2T 36.40" (RT ) D = 95.29' 35" T = 28.2T L = 52.84' R = 60.00' PRC=102.48.51 PRC=103+01.35 CPS /V-3g/5,9045972 E ��48227n Inn Q 65 h Curve SUP-6 PI = 106.16.02 DELTA = 7/0 14' 04.46" (RT ) D = /7. 37' 46" T = 232.83' L = 404.07" R = 325.00" PCC = 1031,83.19 PRC=107.87.26 Curve SUP-5 PI = 103.44.09 DELTA = 40.46' 25.8T (RT ) D = 49" 49' 2r T = 42.74' L = 8/.84' R = //5.00' PRC=103.01.35 PCC=103+83.19 FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 21112020 4:55:28 PM dII550704B.dgn Plotted Byr michael.mitchell N N N U C 0 0 0 a C C 0 C L 0 T _0 E Y + T + O + 7 O L + •3 N O L y U C N N O U O a C O O x I E T D O O + C O O + N 0 L + 0 O t L 0 O L + 3 + C i� 7 U O U L + C 0 N U C O N L L N Q 0 LL E C O + O N Of 7 N a L L O O L L 0_ N O 3 L 3 L O C N U C O N N O a L 7 a U + U N a Vl N L + L O w T C O N C N + C N N U L N y w O C N E 0 0 L 0 0 0 + n 0 U 3 L 0 E 7 O r PROJECT MANAGER L4TT-W=MAIA<&f4J-8Z2-45QI_______________ S U R V E Y E D B Y, D AT E&&B —'!(JRILEY_ & _MAPPII�G,LLQ, -OZ/2312Q1g _____ DESIGN SUPERVISED BY-ALMIIfl1Ell-PE.____________________- DESIGNED BY-KbVLEY--H-ORAL -&- A=-CL TEs,1NC- SUBSURFACE UTILITY BY, DATE 14CCLZV-A8&-OZ/JIl2QI-9_____________ LOD SEDIMENT CONTROL LEGEND 00 EC2,Ty,1 Denotes Temporary Silt Fence, St'd EC-5 Type A or B Denotes Rock Check Dam, Type I; St'd EC-4 Denotes Rock Check Dam, Type II; St'd EC-4 Denotes Inlet Protection, Type A; St'd EC-6 Denotes Inlet Protection, Type B; St'd EC-6 Denotes Culvert Inlet Protection, Type C; St'd EC-6 Temporary Sediment Trap; St'd EC-7 Denotes Temporary Sediment Basin Limits of Disturbance Denotes Temporary Diversion Dike, St'd EC-9 Denotes Rolled Erosion Control Product, Temporary, St'd. EC-2 Type 1 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 21312020 2:29:37 PM dII350705.dgn Plotted By, michoel.mltchell N O N N 0 U O a 0 C L 0 Y O 0 0 3 0 0 U O a c 0 0 E Y T 0 0 a 0 0 c 0 C 0 N L O 0 C 3 0 .3 C c U O C 0 U U C O L L N a 0 L E 0 L 0 a L a 3 .0 U L 3 L 0 C U C 0 b O n L a U a L L O T O C U L 0 0 1 C E L C C 0 L N L C L a U) C N 0 n U C O U L 0 c E 0 PROJECT MANAGER -VA T _W=46AlL_&J4)_8729501 _ �Z REVISED STATE #7509 `�� STATE ROUTE PROJECT SURVEYED BY, DATE d&BS_URJLEY_&_M_APP1N�.11C.1JZ/2312Q1g_______ Curve LAII�IBS_LN7 DESIGN SUPERVISED BY_XY1_TfHELL_PE,_____________________ Rim = 576.40' PI = 318-06.77 \x LOAVES & FISHES DESIGNED BYICLMLErNQf2 L-& A=fO LEZLNC------------------ Inv, In = 572,35' (6" PVC from Approximate Direction) 0 SUBSURFACE UTILITY BY, DATE ACQLI�IABK�Z�JLl20f9----____--___ Inv, In = 568.70' (24" RCP from Approximate Direction) DELI = 19 /7 14.00 ,`�L FOOD PANTRY INC EN/8-002-975 Inv, Out = 568.52' (24" RCP to *10437) Curve LOBS_LN6 D = 15' - 9' l5" F 0 3°26 ACRES VA. 9885 Curve LAtiIBS_LIVS PI = 3/6�73.75 T = 64.25' ��OF,� �Q (PER ALBEMARLE GIS DATA) C-50/ 10104 /8 RCP s -A PI = 315,35.19 Inv.ln= 557.17 DELTA = 7°44" 36.68" (RT) _ 127.27'\� � o� DESIGN FEATURES RELATING TO CONSTRUCTION DELTA = I2 48 46.79 (LT) Inv. 554.93 D = 5° 37' 18" = 578.09' qJF� \ '��` I -qp :� �F`� OR TO REGULATION AND CONTROL OF TRAFFIC D = 9' l0' 02° #IoloS 15°RCP T = 68.98' P C = 3/7*4�2.52 �� �`� G,'��c.�SJ, I MAY BE SUBJECT TO CHANGE AS DEEMED T = 70.18' Inv. In= 557.19 L = 137.74' PT = 318.69.79 's 'S' •-p_ I L = 139.7T lnv,Out= 554.91_ SI SFM Oq�'Y��ly _--------- R JNECESSARY BY THE DEPARTMENT 1,019.18 qJ �� R = 625.00' PRC = 3/6+04 78 - ads `� Kimley-Horn & Associates, Inc. Kimley-Horn & Associates PRC = 314.65.01 10270 Storm Manhole - Woods �� � \ ° �° F fl g g •� Rim 572.44 PRC 317 42.52 I Richmond, Virginia Richmond, Virginia \off Q °'� \ HYDRAULIC ENGINEER ROADWAY ENGINEER PRC = 316.04.78 Inv. In = 567.821(21" RCP From Approximate Direction) 12" Pop r PQ°�� G�� •W Inv, In = 564.39 (24 RCP From #10437) k „ Popla Inv. Out 564,24' (24" RCP To Concrete 'V' Ditch) Oa 12 r le 18 POP I �o 10437 Storm Manhole IS Map 4, OMP ; �\ `�'0\s BASE B/D ONLY INSET Rim = 573.80' Poplar 2 _ 551e99 Ln W = I I n Inv N W (SEE SHEET 5D) Inv. In 565.3/ (24 RCP from 7509) coSign lnv.0ut = 565.08' (24" RCP to #10270) I enance w a, \ , R' p \ , ` Curve LAti1BS_RDl cZ I "� Face tY CP#g 6e2244 \Rep �'\� C) W`� PI = 203.76.78 M? O I �? 0,91548655 0009 s`� `N �o x �' _ „ (LT) Q W J ( COUNTY OF ALBEMARLE co N d e E=11,482 g I �o ,School ' DELTA 7' 55 /8°98 I�I \ ►� �' g =567 946 24 Poplar : 552°$�,� Sign �� Fj� '� _ • �o SCHOOL BOARD AL �. ►� ow -� E 1 n,t I S 9 pax • �. D 3 00 ,56 v2I6°69 ACRES o \ • r;28, Poplar cA / ��� 0� �� �� T = /3/.56 v `I (PER ALBEMARLE GIS DATA) ��.�� 19" Oak ������ oo� Q 0�� ,��� L = 262.70' J &-COnc` /K1 `��h�, E o� \D' h0 R = 1,900.00' ROUTE 9885 Q \ \,7 r � S i q n �- • �1 �� 0 PC = 202+45.22 - - _ (LAMBS LANE) Q , -' •�o \ '� 2 ° G School - N 87 O '�PT = 205+07.92 V ,�, Edge of Pavemen _ST R. \ _ a) 7 5Q0 - _ _ Q _ -�\- - - -of Pavement Q- � i" � � � i" i" i" i" i" i" i" i" i" i" i" i�� ; i i" i" i" i" i i""i" i � ' �� Edge _ '\ " i " i i i i i i - - - - - - - - - " - - " - _ b \ CONNECT CHURCH /Vo - Ati1BS_LN5 �' �' i " _ - / I 553 og l sF 4.98 ACRES DO NOT PO �krng _ ,p �� ° ° ° ° ° ° ° o o ° ° o ° ° - - - - - _ _ LAMes `�N CO Edge of _ Pav_ement Inv �I 1 I I �' \ (PER ALBEMARLE GIS DATA) DISTURB �g --____ - _ _ ��, _ Usk ,J m No - - - 0 �I�I I�I� 10104 -------- /fix e h Sking' _ FD - -_ E� -°f.Po emit_ `�,3' • °h g F�� - 62.5 62 - \\ _ ° ° n --- - - v ° ° ° z 5 5 ,e 5 4 . • ° S -\ fn Q Q _ ° ° ° Bu - 56/ 60 559 ° ° ° tiq,Q ` Blocks o - ° 5 �� o c Ily DO NOT ° • ° ° ° T ljs. � '� KN�- 5 i 9 n/ ° Sig • ° -1 Sign 5' A/P B DISTURB S� sfu --------____-_- ,� ° 1477 _ 6 ash'' - ° , °9' 9 ° I n Out O W UP_ ' ' _ _ , <� Fp ° ' ° ° ��pass' V. C 0 o k �� Concrete W all �' -) � (�� ° ° U _ ° - ign - 7 0 - _ _ DO NOT v SHEET NO. 5 ° Do Noy` - __-- 6" Oar=�___--------- �I DISTURB ° ° O 2' GRADED o ° ° ° ° ° ° ° ° ° o ° ' DiS"B X _ \ SHOULDER ° • _ ° ° ° ° ° ° TREES TO BE LIJDO NOT ) ` r! s REMOVED DO NOT \ W DISTU B �. �� a DISTURB _; RC T I E DO NOT �, �` 'A O •� �� `\ ° ° .�, •�, 2 I t DISTURB o a q�-yso O -J �w Q GATES TO BE a A0 10 37 Curve SUP-6 �, \\ A3 PI = 1a6+16°a2 \ �� 2 REMOVED AND RESET Z LQ r" TREE TO BE o kTI\S�T.FENCEDELTA = 7/° l4'0446" (RT) �CBE REMOVED ° REMOVED D= 17° 37' 46" `vIlIl f , _56 lo v' CD T = 232.83 _ � sr�D• FL�CtSL REQ. T \ \ O1 COUNTY OF ALBEMARLE L = 404°07 POT 3/6 54.71 LAMBS LANE CONSTR. �3 33.45 RT. SCHOOL BOARD AL = R 325.00 PT 109.08.84 SUP CONSTR. 2I6°69 ACRES 08l9 (PER ALBEMARLE GIS DATA) PRC 1=07+87.26 g\� sphaDO NOT o ` \ DISTURB --- Curve SUP-7 �� C�� 0Ut urve SUP-8 , : �,� \ n . ut PI = 108+39°56 PI = 108.92.67 END PROD. EN/8-002-975, C-5 I o BEGIN' PROD. E /8-002-97 - ��� , 5 e out DELTA = 82° 09' 42.66" (LT) . C 503 _ • DELTA = 56° 34' 40.64" (RT) BASE BID `, #' � , �`, ���� �.. Er K 1564. 2 \ D 95 29 35 _ DD/T lV E„ BID /T EM 2 T _= 52.3/ T = 19.38 L _86.04, L = 35°55', ��� ��� 7509 o PRC107.8726 � °S R 60.00 R - 36 00 00 = ° PRC=108.73.3a . _ _ ��.. °5� ���-o No;f -... I Do C=108.73°30 = o� �o II - - _ - �� Sic PT 109+08.84 o ll ; �p�r I I -- �.o '°°,;°'° III .•o.... LEGEND ST'D. CG-l2, TYPE A REO'D• A EXIST. PIPE TO BE ABANDONED o I I P o5� I n in REFERENCES --=--=---------------- Q .__- %11,;,5, G& efi4� 56 • 2� (PROFILES, DETAIL & DRAINAGE ° ' ' ' A ST D. CG l2, TYPE B REQ D• A/5EXIST. PIPE TO BE REMOVED 51 DESCRIPTION SHEETS, ETC.) • • DENOTES PROPOSED PAVEMENT INSET L 3�ST'D•CG-2 REQ'D• \'------------ ----10473 DE OTES DEMOLITION OF PAVEMENT - �- - - " , LBE ARLE---------- Survey Alignment Data Sheet lC N - - HIGH SCHOOL ° ° 4 ST D• RADIAL CG-2 READ. � __ ��� Construction Alignment -------- Data _ c 3 8 ID(I)-02) DENOTES tillLL & OVERLAY PAVEMENT 55 ST'D.CG-6 REQ'D. �'� Sheet � � � � � 2D(3)-2D(4) (PROD. EN18-002-975, C 504) FINAL PLANS BMP B Details !ADDITIVE BID ITEM *31 A ST'D. RADIAL CG-6 REQ'D. - - - Edge of Building � � Shored Use Path Profile 4A � FULL DEPTH sAWcuT THESE PLANS A S ARE UNFINISHED • ° 4_ ..a a. DENOTES PROPOSED CONCRETE ITEMS N Erosion and Sediment Control (Single Phase) 5A AqHYDR.CE4iENT CONC. SIDEW ALK REQ'D. AND UNAPPROVED AND ARE N O T Entrance Profile 5B L�= _ _ _ _ _ DENOTES CONSTRUCTION LIMITS IN CUTS T 0 S E USED F 0 R ANY TYPE AloADJUST EXISTING UTILITY TO GRADE Parking Lot Sidewalk OF CONSTRUCTION. Cross Sections 5C EF-_ - _ DENOTES CONSTRUCTION LIMITS IN FILLS A//EXISTING UTILITY TO BE RELOCATED (BY OTHERS) Base Bid Only Inset 5D Al2EXIST.UTILITY TO BE REMOVED SCALE PROJECT SHEET NO. Pavement Nlorking, Marker 7(5)kEXIST.PIPEEN/8-002-975 5 & Signing Plans TO BE CLEANED OUT 0 A' 50' 21112020 4:55:34 PM d11350705A.dgn Plotted Byr michael.mitchell N N N c + 0 a v O 0 _ E 0 0 + 0 L 3 0 N N O a 0 0 E D 0 t 0 + 0 0 0 C, 0 0 L + 0 + 3 + 0 3 + U O 0 C L 0 L 0 0 a L a 3 L 3 0 U 0 0 a S a U a L 0 0 a) C U L 0 + E L + 0 L c t a 0 + 0 U I 3 L I- 0 c E U 0 r REVISED STATE PROJECT MANAGER �Z yLERIMgIJ<, L4.34J�72 SQL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -- STATE SURVEYED BY, DATE&&B_S1J8LEY_&_YAPPLI�G,LLQ,_0Z/23Z2Q1g------- #7509 �' ��� ROUTE PROJECT DESIGN SUPERVISED BY_ALMLTf1�ELL_PE.--------------------- Rim = 576.40' '�x LOAVES & FISHES DESIGNED BY XIMLEYLIQl3AL AS�OLLAZES,INC------------------ Inv. In = 572.35' (6" PVC from Approximate Direction) O Inv. In = 568.70' (24" RCP from Approximate Direction) `� FOOD PANTRY INC EN/8-002-975 SUBSURFACE UTILITY BY, DATE AQCLLY—AB&-OZ,JLV2Q1-9------------_ Inv. Out = 568.52' (24" RCP to *10437) �F�� O� _3.26 ACRES VA. 9885 (PER ALBEMARLE GIS DATA) C-501 10104 /8 RCP Inv. ln= 557.17 lnv°Out= 554.93 qJF� c'�+�......-_� DESIGN FEATURES RELATING TO CONSTRUCTION -qp \ OR TO REGULATION AND CONTROL OF TRAFFIC 410105 15" RCP �F` \a C��5], MAY BE SUBJECT TO CHANGE AS DEEMED Inv. ln= 557.19 `r ��— I I nv.I n= 57.1 9/ SI SF,yt 10 lt- NECESSARY BY THE DEPARTMENT 410270 Storm Manhole W od s Kimley-Horn & Associates, Inc. Kimley-Horn & Associates \ cry Rim = 572°44' � � \0� � � � � Richmond, Virginia Richmond, Virginia Qo�^ • I?,,pop HYDRAULIC ENGINEER ROADWAY ENGINEER r Inv. In = 567.82' (21" RCP From Approximate Direction) la \ P�� O�J`,C�• Inv. In = 564.39' (24" RCP From *10437) \ O Inv. Out = 564.24' (24" RCP To Concrete 'V' Ditch) Oak I Z' ° \ Wl r � g op 6, G �, 1 #10437 Storm Manhole / 18" Maple 24" MP.99 , \ S� O Rim - 573.80' I I POPIar i Inv.\\ \\ O J Inv. In 565.31' (24" RCP from *7509) CO ° ° S g ce R1 lnv. Out = 565.08' (24" RCP to #10270) �I oa � ci , n° P COUNTY OF ALBEMARLE �d e 6 jar Sc 9 2Gj o�. V SCHOOL BOARD AL �: ' ° =5 7° 4 ° In -- 2/6.69 ACRES o 8° oPl ER ALBEMARLE GIS DATA) \ 565 V \ \8. Con \� 1 E o�\ x0 W Q \\,o� r` n` i k LLJ--------- Co1�l�TR. ------ _ \ Q \�� h dge of Pavement — — Edge of veme Q Q _2 ' ` ------------- 4 1 7 5 , - - - - - - - - - - - �0� �` CO E e of e ent 5 � Rco-2 I n- L O ----- �x — t e' S` in \ 9 FO N P°s .5 562 Ex °f P Vemat 562 •J' Rc EC 2. rr. i se u e S6S 561 560 55�8 Q Q Rc _ NST U,S'KeSig , S 9 9n o - _ Gate Tres ° ; CInv. 11 t ` a k oncret Z lgn — — — — ` x Z DD 1043 NI I \ II \ \!! II f CO NTY OF ALBEMARLE POT 3h6}54.71 LAMBS LANE CONSTR. 3 . ' RT = CHOOL BOARD AL \\\N \. 2/6069 ACRES \\ P 8 84 ,: SUP CONSTR (P ALBEMARLE GIS DATA) \� \ Asphalt h i - --- . o \\ \ ! 575 ---- . ! END PROJ. EN/8-002-975, C-5 t, PROS. 18-002-975, C-503 !! BASE BID ADDIT EVE:\ B/D /TENT #2 \! \ \ \! 7 509 \ \ d? EROSIONI E TCONTROL�° REFERENCES & SEDM N LEGEND �o �Q) (PROFILES DETAIL & DRAINAGE X O porary Silt Fence, St'd EC-5 Type A or B ------ QO TSF-A Denotes Tem ���- -- - DESCRIPT ION SHEETS, ETC.) 2.5 C&G \ Q RCD-1 Denotes Rock Check Dam, Type I; St'd EC-4 --------------------- Survey Alignment Data Sheet lC RCD 2 Denotes Rock Check Dam, Type II; St'd EC-4 Construction Alignment /D(l)-lD(2) - - - - - - - - - - - - _ _ _ _ Data Sheet IPA Denotes Inlet Protection, Type A; St'd EC-6 '� X jL Denotes Inlet Protection, T e B� St'd EC-6 � \ Shared Use Path Profile 4A 0 y p �- Shared Use Path and ciP Denotes Culvert Inlet Protection, Type C; St'd EC-6 Sidewalk Plan 5 Entrance Profile 58 Parking Lot Sidewalk 5C Cross Sections Base Bid Only Inset 5D Pavement Marking, Marker 7(5) & Signing Plans Denotes Temporary Sediment Trap; St'd EC-7 Denotes Temporary Sediment Basin Limits of Disturbance Denotes Temporary Diversion Dike, St'd EC-9 Denotes Rolled Erosion Control Product, Temporary, St'd. EC-2 Type 1 THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. Edge of Building '1___1' IV CONNECT CHURCH 4.98 ACRES (PER ALBEMARLE GIS DATA) 5 1r \ In E II 1 X, I I Conc_Side V - � Concrete SCALE PROJECT MR EN/8-002-975 0 A' 50' SHEET NO. 5A SHEET NO. 5A 21312020 2:09:24 PM d11350705D.dgn Plotted By, michoel.mltchell PROJECT MANAGER -VA T-W=46AlL-&J4)-8Z295Q1_ SURVEYED BY, DATE.LRIBSURLILY_&_M_APELN-G.L1C.-OZ/2312Q1-9______ DESIGN SUPERVISED BY-XY1-TfHE11-PE, DESIGNED BYICLMLEr--�lQ1311L-& A=fO AZEZLNC__________________ SUBSURFACE UTILITY BY, DATE Curve BBA_l PI = 0.63.21 DELTA = 45. 42' 06.02" (RT ) D = 38• Il' 500 T = 63.21' L = 119.65' R = 150.00' PC = 0.00.00 PRC=1.19.65 /FCFNn Curve BBA_2 PI = 1.69.02 DELTA = 36. 26' 19.23" QT ) D = 38• ll' 50• T = 49.3T L = 95.40' R = 150.00' PRC=1.19.65 PT = 2.15.04 BASE BID ONLY INSET 1.00:.:.:.] DENOTES PROPOSED PAVEMENT ��] DENOTES DEMOLITION OF PAVEMENT �.� DENOTES MILL & OVERLAY PAVEMENT (PROJ. EN18-002-975, C-504) !ADDITIVE BID ITEM *31 DENOTES PROPOSED CONCRETE ITEMS L`- _ _ _ _ DENOTES CONSTRUCTION L/NITS IN CUTS DENOTES CONSTRUCTION LIMITS IN FILLS N N N Curve BBA_3 PI = 3.08.22 DELTA = 83. 46' 18.54" (RT ) D = 572.57' 28" T = 8.97' L = 14.62' R = /0.00' PC = 2.99.25 PT = 3.13.87 Ln 0 AIST'D. CG-12, TYPE A REO'D. A EXIST. PIPE TO BE ABANDONED SAT'D. CG-l2, TYPE B REO'D. AEXIST. PIPE TO BE REMOVED 22 A3ST'D. CG-2 REO'D. A ST'D. RADIAL CG-2 REO'D. 5 ST'D. CG-6 REO'D. ST'D. RADIAL CG-6 REO'D. 66. A FULL DEPTH SAWCUT AqHYDR.CE4iENT CONC. SIDEW ALK REO'D. AloADJUST EXISTING UTILITY TO GRADE ll EXISTING UTILITY TO BE RELOCATED (BY OTHERS) Al2EXIST. UTILITY TO BE RE40VED kEXIST.PIPE TO BE CLEANED OUT DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT 580---------------------------------------------------------------------------------------------------------------------------------------------------- PROP.GRADE 565..................:.................----------------- ............................... .----- ----- EXIST. GROUND 580 �' S' �" ;...... ;... - ;.... - rn Ln PROP. GRADE Ln L L(^� � �' _ `_ W _ Ln Ln 2%- -' n � Z� �� 575 .................. ........... :................. -' PROP. LO ASPHALT SIDEWALK 570 --- B2 1-1921 585------------------------------------ ---- 4.7' PROP, GRADE 580 �' ---------''''-- • M�y� ------------------ `•lJ � L0 27 v! v!! 7 At\ v l - L�- ----- PROP. ASPHALT 575 S�DEW ALX - - - EXIST: GROUND 570------------------------------------- ------ B,�`B,�51 NOTES: I) THE DESIGN SHOWN ON THIS SHEET SHALL BE CONSTRUCTED ONLY IF ADDITIVE BID ITEM *2 IS NOT CONSTRUCTED. 2) ALL PROPOSED /VPROVEVENT S DEPICTED IN THIS PLAN SET THAT ARE LOCATED EAST OF STATION 106.00 AND NOT SHOWN ON THIS SHEET ARE EXCLUDED FROV THE BASE BID. SCALE 0 5' 10' FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. 2/1/2020 4:35:41 PM d11350706(l).dgn Plotted By, michoel.mltchell O N O N N PROJECT MANAGER -VA T-W=46AlL-&J4)-8Z29501_ SURVEYED BY, DATE.LRIBSURLILY_&_M_APELN-G.L1C.-OZ/2312Q1-9______ DESIGN SUPERVISED BY-XY1-TfHE11-PE, DESIGNED BYICLMLEr--�lQ1311L-& A=fO AZEZLNC__________________ SUBSURFACE UTILITY BY, DATE SHEET 3 3-1 l STD. DI-7 REQ. GRATE A TYPE /// REQ. H=6.8', INV = 55/.20% RW = 557.96' 3-1 TO 3-2 EQ. (2' COVER) 9,E5'� RESISTAN�EJOINT TYPE INWIN) = 554.25% INV(OUT) = 553.95" 3-2 / STD. DI-7 REQ. GRATE A TYPE /// REQ. H=4.0', 1W = 553.95'. RN = 558.00' 3-2 TO 3-3 9' A�R�STT JNTYPQ. (24' COVER) ES RESISTANT lI 1N) = 553.95. INV(OUT) = 553.90' 3-3 0�RA OVER RO. I S D. H 1E & EQ. INV = 553.90% R/til = 559.58' SEE DETAILS ON SHEET 6(3) 3-3 TO 3-4 /5TlGff /// REQ. (4' COVER) OTCJPINE CLASS S ' YPE INWIN) = 553.90'. INV(OUT) = 553.80' 3-4 5J LF TD. yH- R MH-2 REQ. l STD. MH-1 FRA E & COVER REQ. ONNECT T ST. 0' EX 55RCP' DADESCRIPT1MNA SHEET 4 4 / INV �. 553 �5 �A REQ. 4-1 TO 4-2 33' -18- CONC. PIPE CLASS /// REQ. fl' COVER) SILT TIGHT JOINT TYPE INWIN) = 553.95', INWOUT) = 552.60' 4-2 / STD. DI-5 REQ. TYPE l GRATE REQ. STD. PG - A TYPE E COV�R H=3.5', INV = 552.50% Rl = 556.00' STD. IS-1 REO. 4-2 TO 4-3 76' -30" X l9" ELL. CONC. PIPE CLASS /// REQ. (3' COVER) SILT TIGHT JOT TYPE INV(IN) = 552.50'. INV(OUT) = 55120' 4-3 I STD. DI-5 REQ. TYPE /// GRATE REO. STD. PG-�A TYPE E CODER H=6.8', INV = 55/.20', RIM = 557.96' STD. IS-1 REQ. 4-3 TO 4-4 29' -24' CONC. PIPE CLASS /// REQ. (5' COVER) SILT HT JOINT TYPE NVUN) =G55/JO'. INWOUT) = 550.70' 4-4 4.6 n MH-1 RA� 0 C & OVER REQ. INV = 550.70', RIM = 556.00' STD. IS-1 REQ. 4-4 TO 4-5 59' -24' CONC. PIPE CLASS /// REQ. (I' COVER) SILT TIGHT JOINT TYPE INV(IN) = 550.60'9 INV(OUT) = 549.80' 4-5 ISTDFMH-1 STD. RA�II 0 & OVER REQ. INV = 549.70% RIM = 554.00' STO IS-1 I� REQ. CO CT TO EXIST. 24" RCP 4-6 6.0' ST SW 4h REQ. eorr ELEV = 147.00' 6" D)A TER ATER QUALITY ORIFICE REQ.. INV = 150.00' 6" DI ETER RlFICE REQ., lNV = l5/.50' SEE SHEET 2D(I) FOR DETAILS 4-6 TO 4-5 /l' -24" CONC. PIPE CLASS /// REQ. fl' COVER) LEAK RESISTANT JOINT TYPE INNVA) = 550.00. INV(OUT) = 549.80, SHEET 5 5-1 52' -4' SDR- 6 PVC REQ. (3' COVER) (DOUBLE LINE - 26' EACH LINE) Lf�AK REsIsrANr Jo/Nr rrPE lIN) = 559.00', INV(OUT) = 558.75' DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. r I 21112020 4:55:43 PM d11350706(2).dgn Plotted By: michoel.m/tchell 0 N O N N U C 0 0 0 a a 0 0 T E Y O 0 0 3 N CE 0 U O N 0 L O x T E Y 0 0 a 0 0 0 0 0 .o L O 3 0 3 E 0 L c 0 0 L a 0 a E c 0 0 L 0 0 L 0 3 3 U C O N O a L a U N a L 0 T C 0 U U) 0 0 C c E L 0 L C Q) L a U) 0 a O _ 01 L 0 CC E E 0 0 PROJECT MANAGER JyATT-KERTYAk.L4_34)-8Z29.5Q1_______________ SURVEYED BY, DATE d&B-SLJBVEY_&_MAPELV-GLLQ,-OZ12322Q1g DESIGN SUPERVISED BY-bLY1TQ&E11-PE°____________________- DESIGNED BY-KLO—FY--�lQEIV--& A=fLATEZLAlf__________________ SUBSURFACE UTILITY BY, DATE AQCLlV-4BK°-0Z1-112Q14 57C 0 fal 555 /8" 550 545 4-/ TO 4-3 N a� o O Ln ------------------ ------ O :--------- o 0 Q) � : o Ln a ------------ - ° N _- 00z 3267 L°F M cre fe 'oe:75.89: L.F. Ni 4°/3 , c� d? 30" , 19" El/lpticol Concrete Pipe 1. `n �v-------- ------------- 1.7/%----------------:ol Ln Ln `n n Ln 540 0.00 /-00 /-/4 4-3 to 4-4 55/./0 2.00 570 565 560 555 550 545 3-1 TO 3-4 O .II`^o C) :Ln --------0----------------------------------------------------------------- O--------------: ^,------ o C) Ln O :Ln C� O Co N p O:Ln Cc h Q O W) :Qz N --------------- - -- --�� --_-_-O•-(jam-------------- ----- 1 -T . Ln 95.15 L.F. Ln Ln o o 30" Concrete: Pipe Req'd. °� °� °� °'ca l{i Mi �6 M ryi Ln 0.32 % Ln Ln Ln L Ln --------------------------------------------------------- -------------------- ---------------------------- 9:28 L.F. 30" Concrete Pipe Req'd. 0.54 X. 22.02 L.F. ------------------=------------------;----------------------15°ConcretE-Pipe 0.4:5 7. 540 0+00 /-00 4-3 TO 4-4 570 565 ......... �...... O oLn O()� O �L! o Ln O CD or_ N N 560 r............. ocr-: 555 4-2 to 4-3 55/.20 ( 4-4 to 4-5 1.58 ) 550.60 . 2.00 L C Ln o L 28.71 L.F. `n 24' Concrete Pipe q'd. 545 ....... /j-9 . / ..... . 540 0.00 0.52 CO Ln Ln N N 3-4 to Outfall C 555°80 /.25 Req'd. /-37 570 565 60T N 555 4-3 to 4-4 550.70 2.00 550 545 540 4-4 TO 4-5 0 0 O N i ---------- 59°48 L.F. I 0 24" Concrete P1,oe Req'd. I CO CSoa 1.34 o Ln Ln ----------------------------------------- Ln 0+00 4-6 to 4-5 549.60 2.00: 4-5 to Outfoll A 549.70 2.00 0+63 DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT Notes: 0 Storm sewer pipes shown on the profile are represented by their inner diameter dimension, and do not include Wall thicknesses. 2) Only existing Utilities, at the time of the survey, are shown on the Storm Sewer Pipe Profiles. These profiles do not reflect either planned re -location of Utilities or proposed Utilities. The Contractor is also directed to any Utility Plans that moy exist as part of this plan assembly. 3) Not all Utilities are shown on the Storm Sewer Profiles, only those Utilities listed on the Utility Test Hole Data Sheet With the addition of Sanitary Sewer line crossings. 4) All Utility locations are approximate, and are based on information from the project's Test Hole Data Sheet. Utility information shown is specific to its corresponding Utility Test Hole location. 5) Utility Test Hole Information is located on Sheet IE. 6) Utility clearance dimensions shown assume the use of concrete pipe and corresponding pipe thicknesses (Worst case scenario). PROPOSED GRADE EXISTING GROUND ti W HORIZ : rr 25' FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. -C I 21112020 4:35:45 PM d11350706(3).dgn Plotted By, mlchoel.mltchell N N N PROJECT MANAGER -VA T-W=46AlL-&J4)-8Z2-4501_ SURVEYED BY, DATE.LRIBSURLILY_&_M_APELN-G.L1C.-OZ/2312Q1-9______ DESIGN SUPERVISED BY-XY1-TfHE11-PE, DESIGNED BY-KLMLEr--�lQ1311L-& A=fO AZEZLNC__________________ SUBSURFACE UTILITY BY, DATE _ STRUCTURE 18"W x3"H RECTANGULAR nmchiht- TuOni a�Lu ibr-io ib Ai i U YF//JL I/L// 1 YYMLL l0 YR W SE (ELEV = 555.84) I YR W SE (ELEV = 555.08) 30" CONC. PIPE OWN) = 553.90 TOP VIE SECT ION A -A 3-3 R14l = 559.58 TOP OF 8" WEIR INV = 555.90 --------------------------------- s- -------- N 6= D1 4ETER ORIFICE OPENING THROUGH WEIR WALL INV = 553.90 I8=W x3"H RECTANGULAR OPENING THROUGH WEIR WALL INV = 555JO l00 YR W SE (ELEV = 556.21) l5" CONC. PIPE INV(OUT) = 553.90 STRUCTURE INV = 553.90 NOTES: I. STRUCTURE TO FOLLOW VDOT STANDARD DETAILS UNLESS OTHERWISE DIMENSIONED ON PLANS. 2. STRUCTURE SHALL HAVE STD. ST-I. 3. ALL WEIR WALLS TO BE 8" NU WITH GROUT FILLED CORES. 4. REFER TO DRAINAGE DESCRIPTIONS ON SHEET 6(l) FOR ALL RIM AND INVERT ELEVATIONS. 5.INLET SHAPING AS NEEDED. 6. SHOP DRAWINGS FOR ALL DETENTION STRUCTURES SHOWN SHALL BE SUB4TTED TO ENGINEER PRIOR TO FABRICATION AND INSTALLATION FOR REVIEW AND APPROVAL. DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY THE DEPARTMENT FINAL PLANS THESE PLANS ARE UNFINISHED AND UNAPPROVED AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. r I