Loading...
HomeMy WebLinkAboutARB201900058 Correspondence 2020-01-07 Margaret Maliszewski From: Margaret Maliszewski Sent: Tuesday,January 7, 2020 4:55 PM To: Keane Rucker;Justin Shimp; Kyle Redinger; Chris Elam Subject: RE:ARB-2019-58: Pantops Storage -ARB review comments Thanks, Keane.Would it be possible for you to also email PDFs of the submittal? Thanks. Margaret From: Keane Rucker<keane@shimp-engineering.com> Sent:Tuesday,January 7, 2020 4:53 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org>;Justin Shimp<justin@shimp-engineering.com>; Kyle Redinger<kyle.redinger@gmail.com>; Chris Elam <celam@gmfplus.com> Subject: RE:ARB-2019-58: Pantops Storage-ARB review comments CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links oropen attachments unless you are sure the content is safe. i Hi Margaret, We have resubmitted paper copies plans with that form today. As a response, 1. Material samples are forthcoming. 2. Lighting plan has been revised in the following ways: -wall sconce mounting height moved from 10' to 12'.This change reduced the footcandle levels on the north wall of the building, maximum levels are now<20 fc. -added more detailed/straightforward notation on mounting heights -added more detailed breakdown of fixture notation -lighting statistics table updated (the software had updated the photometric plan, but not the results table,this has been corrected) Thank you for your review,we are grateful for how you have been so responsive and easy to work with through this process. Best, Keane From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Tuesday, December 31, 2019 4:38 PM To:Justin Shimp<justin@shimp-engineering.com>; Kyle Redinger<kyle.redinger@gmail.com>; Keane Rucker <Keane@shimp-engineering.com>; Chris Elam<celam@gmfplus.com> Subject:ARB-2019-58: Pantops Storage-ARB review comments Good afternoon. 1 I have reviewed the site plan with revision date of 12/17/2019 and the architectural plans dated December 2019 (received 12/16/19). The following items remain outstanding. Please submit the material samples and an updated lighting plan to address these comments. 1. Provide updated material samples for review, including window glass. 2. Footcandle readings on the photometric plan have been revised with no corresponding change in fixtures and no corresponding change in the lighting statistics table.Applicant's comments state that mounting height has changed, but this is not reflected in the plan. Please explain the change that has been made and revise the submittal to show maximum light levels of 20 fc on the plan and in the statistics table. A resubmittal form is attached to this message. Please include it with your revised submittal and let me know if you have ,questions. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 2