HomeMy WebLinkAboutARB201900052 Review Comments 2019-05-20At the May 20 meeting, the ARB directed staff to handle the review and approval of the Brownsville
Elementary School Modular Classroom project. Based on our discussions with the ARB, the following
revisions are needed for approval:
1. Revise the Color Detail sheet to show the building color as Old Town Gray.
2. Revise the site plan to show landscaping added to screen the view of the building from the
t:.�' Entrance Corridor street.
Revise the site plan to include cut sheets for the proposed light fixtures. Light fixtures should be
a`-- full cutoff fixtures. Revise the lighting note on sheet C3 to coordinate with the revised fixtures.