Loading...
HomeMy WebLinkAboutARB202000013 Staff Report 2020-02-27ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2020-13: Brookhill Blocks 9, 10 and 11 Initial Plan Review Type Initial Site Development Plan and Preliminary architectural review Parcel Identification 046000000019B4 (part) Location On the east side of Rt. 29, approximately 550' south of Ashwood Blvd. Zoned Neighborhood Model District (NMD)/Entrance Corridor (EC) Owner/Applicant Crocket Corporation/Collins Engineering (Scott Collins) Magisterial District Rivanna Proposal To construct 85 attached townhouses in 23 blocks with associated site improvements. Context Blocks 9, 10 and 11 are located in the northwest section of the Brookhill development. Block 9 is adjacent to Rt. 29. Block 10 is to the east of Block 9, and Block 11 is to the southeast. (See Attachment A.) Brookhill Block 4B is to the south. Residential development (Forest Lakes and Montgomery Ridge) is to the north and east. Visibility The residential units of Block 9 will be the most visible from the EC street. Blocks 10 and 11 are not expected to have much visual impact on the EC due to their increasing distance from the street and the topography that falls away to the east. The visibility of Block 9 will be reduced by the landscape buffer that is required along Rt. 29. The lower portions of many of the Block 9 units will be below the grade of the EC street and shielded by topography as viewed from the street. The roofs and upper portions of the units will be visible through the trees of the wooded buffer and, in the future, through trees added to the buffer. ARB Meeting Date March 2, 2020 Staff Contact Margaret Maliszewski PROJECT HISTORY The ARB reviewed and recommended approval of an Initial Site Plan for these blocks on August 20, 2018 under ARB-2018-103. The corresponding Initial Site Development Plan (SDP-2018-52) was approved in September 2018; however, the applicant did not meet the 1-year deadline for submittal of the Final Site Plan, so a new Initial Site Plan submittal is required. Some changes have been made to the layout since 2018. The closest internal road (Koch Court) running roughly parallel to Rt. 29 has been reduced in length and the blocks of houses are distributed more completely along its length. A large stormwater management facility is proposed at the north end of this road where none was previously proposed. Retaining walls are proposed along the western and southern side of the lots adjacent to Rt. 29 and along the west and south sides of the stormwater facility. The layout of residential units differs in the center of the block, as well, but this area is not expected to have much visual impact on the EC street. Basic architectural designs have been submitted with this application. ANALYSIS Gray highlight = means the guideline can't be reviewed at initial site plan stage, but recommendations can be provided for final Yellow highlight = means the guideline can only be reviewed for location/configuration at the initial plan stage Regular text = means the guideline can be reviewed at initial plan stage, can be made a condition of initial plan approval, and can be the basis for denial REF GUIDELINE I ISSUE I RECOMMENDATION Purpose, Compatibility with significant historic sites; Compatibility with the character of the Entrance Corridor; Structure design 1 The goal of the regulation of the design of development within the The proposed designs are for residences, so The architecture of designated Entrance Corridors is to insure that new development they incorporate basic architectural Blocks 10 and 11 does within the corridors reflects the traditional architecture of the area. elements derived from traditional not require ARB review Therefore, it is the purpose of ARB review and of these residential buildings, but the overall due to anticipated lack of Guidelines, that proposed development within the designated character of the residences has no specific visibility. Entrance Corridors leflect elements of design characteristic of the connection to local historic architectural significant historical landmarks, buildings, and structures of the trends. Provide dimensioned Charlottesville and Albemarle area, and to promote orderly and architectural elevations attractive development within these corridors. Applicants should Maximum building height is identified as 3 for review. Provide note that replication of historic structures is neither required nor stories or 40'. The architectural elevations material call -outs on the desired. show two-story units, but no dimensions are provided. The ground elevation drops elevations. 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, away from the EC moving eastward, Eliminate Arctic white, land, and vegetation. In order to accomplish the integration of effectively eliminating the visibility of the woodland cream, buildings, land, and vegetation characteristic of these sites, the residences in Blocks 10 and 11 from the cobblestone, sail cloth, Guidelines require attention to four primary factors: compatibility EC. pearl grey, and light mist with significant historic sites in the area; the character of the from the color options for Entrance Corridor; site development and layout; and landscaping. Residential units closest to the EC have their rear elevations facing the EC. These lots 1 and 20 — 33. 3 New structures and substantial additions to existing structure) should respect the traditions of the architecture of historicallt elevations are largely devoid of significant buildings in the Charlottesville and Albemarle area. architectural detail and character. Photographs of historic buildings in the area, as well as drawings of architectural features, which provide important examples of this The materials list identifies primary tradition are contained in Appendix A. building materials as Hardiplank and stone, though the elevations and renderings show 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area'A no stone. Siding colors (Attachment B) historic structures is not intended to impose a rigid design solution range from white to tan, gray, green and for new development. Replication of the design of the important brown. Some of these are light shades, historic sites in the area is neither intended nor desired. The including Arctic white, woodland cream, Guideline's standard of compatibility can be met through building cobblestone, sail cloth, pearl grey, and scale, materials, and forms which may be embodied in architecture light mist. The proposed colors are which is contemporary as well as traditional. The Guidelines allow compatible with other Brookhill blocks individuality in design to accommodate varying tastes as well a� but, given the character of the rear special functional requirements. elevations, eliminating the lightest shades from the color options for the units closest 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the forms to the EC could further ensure a and features of the significant historic buildings in the area, coordinated appearance along the EC. exemplified by (but not limited to) the buildings described id Proposed roof material is "Onyx" Duration Appendix A [of the design guidelines]. The standard of asphalt shingles by Owens Corning. compatibility can be met through scale, materials, and forms which may be embodied in architecture which is contemporary as The required buffer along Rt. 29 is well as traditional. The replication of important historic sites in expected to reduce some of the visual Albemarle County is not the objective of these guidelines. impact of the development on the EC. As such, the buffer will also serve to promote orderly and attractive development. 5 It is also an important objective of the Guidelines to establish a The landscape buffer that is required along See landscape pattern of compatible architectural characteristics throughout th4 Rt. 29 will establish a level of unity and recommendations. Entrance Corridor in order to achieve unity and coherence. coherence along the corridor for the Building designs should demonstrate sensitivity to other nearby development. The buffer will also help structures within the Entrance Corridor. Where a designated reduce visibility of the residences. corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. 10 Buildings should relate to their site and the surrounding context of buildings. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive whole. 11 The overall design of buildings should have human scale. Scale The proposed residences are 2-stories tall, None. should be integral to the building and site design. with and do not appear over -scaled. 13 Any appearance of "blankness" resulting from building design The side elevations include a substantial See #9. should be relieved using design detail or vegetation, or both. amount of blank wall area, with only two single windows and two paired windows. Using muted colors on these elevations would help reduce visual impacts. 14 Arcades, colonnades, or other architectural connecting devices Connecting devices are not proposed. None. should be used to unify groups of buildings within a developmeak 15 Trademark buildings and related features should be modified to The proposed buildings are not None. meet the requirements of the Guidelines. "trademark" in the traditional sense as it has been applied to the Entrance Corridors, but the villa design has likely been built elsewhere. 16 Window glass in the Entrance Corridors should not be highly tinted Given the site conditions, window glass is None. or highly reflective. Window glass in the Entrance Corridors not expected to have a significant impact should meet the following criteria: Visible light transmittance on the EC. (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications on the proposed window lass should be submitted with the application,forfinal review. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the Accessory structures and equipment None. overall plan of development and shall, to the extent possible, bQ associated with the residences in Block 9 p om atible with the building designs used on the site. are expected to be of the variety and scale typically seen in residential yards. 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these features Topography and the wooded buffer along will still have a negative visual impact on the Entrance Corridor Rt. 29 are expected to minimize visibility street, screening should be provided to eliminate visibility. a. of these items to a sufficient degree. Loading areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above -ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of: a. Walls, b. Plantings, and c. Fencing. 21 The following note should be added to the site plan and the The note does not appear on the plans. Add the standard architectural plan: "Visibility of all mechanical equipment from the mechanical equipment Entrance Corridor shall be eliminated." note to the site and architectural drawings. Lighting A note on Sheet 1 states that no lighting is Provide sufficient details proposed. If exterior wall -mounted fixtures in the site plan to show are proposed, sufficient detail is needed in that all proposed light the plan to show that the fixtures meet the fixtures meet the requirements of the lighting ordinance. requirements of the lighting ordinance. Add the standard lighting note to the plan. Landscaping 7 The requirements of the Guidelines regarding landscaping are The Brookhill Code of Development Revise the buffer planting intended to reflect the landscaping characteristic of many of the requires a 100'-deep buffer along the EC to include a greater area's significant historic sites which is characterized by large street, composed of a 30' planted buffer variety of trees and shade trees and lawns. Landscaping should promote visual order and a 70' natural undisturbed buffer. The shrubs, both deciduous within the Entrance Corridor and help to integrate buildings into plan shows trees added into bare areas of and evergreen. the existing environment of the corridor. the 70' buffer, and in graded areas of the 30' buffer. The buffer requirement 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar supersedes the 35'-spaced street tree characteristics. Such common elements allow for more flexibilitt requirement. in the design of structures because common landscape features will help to harmonize the appearance of development as seen Trees added to the buffer include sweetbay from the street upon which the Corridor is centered. magnolias, Shumard oaks, and redbuds. The tree selection is somewhat limited, and 32 Landscaping along the frontage of Entrance Corridor streets should include the following: shrubs are required in the mix. a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3'/z inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one witll the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: Sidewalks and street trees are shown along None. a. Large trees should be planted parallel to all interior roads. Such most of the streets. trees should be at least 2'/2 inches caliper (measured six inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. 34 Landscaping along interior pedestrian ways: a. Medium trees should be planted parallel to all interior pedestrian ways. Such trees should be at least 2%2 inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: Some limited on -street parking is provided None. a. Large trees should align the perimeter of parking areas, located throughout the development. A small 40 feet on center. Trees should be planted in the interior of parking parking lot is proposed at the south end of areas at the rate of one tree for every 10 parking spaces provided Flora Lane. It is not expected to be visible and should be evenly distributed throughout the interior of the from the EC. parking area. b. Trees required by the preceding paragraph should measure 21/2 inches caliper (measured six inches above the ground); should bed evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: The residences in Block 9 are grouped in See #9. a. Trees or other vegetation should be planted along the front of blocks of 3 and 4 units. The 4-unit blocks long buildings as necessary to soften the appearance of exterior measure approximately 130' long. In most walls. The spacing, size, and type of such trees or vegetation cases, the front and rear elevations of the should be determined by the length, height, and blankness of such individual units project forwardiback from walls. adjacent units. Although the rear elevations b. Shrubs should be used to integrate the site, buildings, and other lack architectural character and detail, structures; dumpsters, accessory buildings and structures; "drive topography and trees in the buffer, and the thru" windows; service areas; and signs. Shrubs should measure at use of muted colors, are expected to least 24 inches in height. sufficiently mitigate the appearance. 37 Plant species: a. Plant species required should be as approved bi The Russian sage is not a native plant. Recommendation: revise the Staff based upon but not limited to the Generic Landscape all non-native plants to Plan Recommended Species List and Native Plants for Virginia native species. Landscapes (Appendix D . 38 Plant health: The following note should be added to the landscape The note does not appear on the plan. Add the standard plant plan: "All site plantings of trees and shrubs shall be allowed to health note to the plan. reach, and be maintained at, mature height; the topping of trees it prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Site Development and layout/ Development pattern 6 Site development should be sensitive to the existing natural The development exhibits an organized None. landscape and should contribute to the creation of an organized pattern of roads and sidewalks. The development plan. This may be accomplished, to the extent residences in Block 9 are not exactly practical, by preserving the trees and rolling terrain typical of the parallel to the EC street; they are oriented area; planting new trees along streets and pedestrian ways and along Koch Court, a new street located choosing species that reflect native forest elements; insuring that between Rt. 29 and Archer Avenue, which any grading will blend into the surrounding topography thereby travels north/south through the western end creating a continuous landscape; preserving, to the extent of the development. Greenways, stream practical, existing significant river and stream valleys which may buffers, and wooded buffers border the be located on the site and integrating these features into the design blocks. Despite the wooded buffer along of surrounding development; and limiting the building mass and Rt. 29, the general view of the area will height to a scale that does not overpower the natural settings of the change; the development will be evident site, or the Entrance Corridor. beyond the buffer. 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within the corridor should be as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of the site to Significant grading is required to develop None. surrounding conditions by limiting the use of retaining walls and by the property as proposed. Throughout the shaping the terrain through the use of smooth, rounded land forms plan, grading generally has an engineered that blend with the existing terrain. Steep cut or fill sections are appearance, including that which is enerally unacceptable. Proposed contours on the grading plan sha, proposed into the 30' buffer along the EC. e rounded with a ten foot minimum radius where they meet the These areas will be replanted. The adjacent condition. Final grading should achieve a natural, rather replanting and the 70' buffer are expected than engineered, appearance. Retaining walls 6 feet in height and to sufficiently minimize the impacts of the taller, when necessary, shall be terraced and planted to blend with the grading on the EC. landscape. 41 No grading, trenching, or tunneling should occur within the drip line Tree protection fencing is not shown on the Show tree protection of any trees or other existing features designated for preservation in plans, but is needed. fencing on, and the final Certificate of Appropriateness. Adequate tree protection coordinated throughout, fencing should be shown on, and coordinated throughout, the the grading, landscaping, grading, landscaping and erosion and sediment control plans. and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 20 Surface runoff structures and detention ponds should be designed to A stormwater management facility has None. fit into the natural topography to avoid the need for screening. When been added to the north end of Block 9. It visible from the Entrance Corridor street, these features must be is not expected to be visible from the EC fully integrated into the landscape. They should not have the due to topography. appearance of engineered features. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. 1.100TIuMWK01]a►31rOJU1uIBiel IM11Y113M Staff recommends the following as the primary points of discussion: 1. Anticipated visibility of blocks 9, 10 and 11 2. The need for review of the architectural designs for Blocks 10 and 11 3. The appropriateness of the proposed architectural designs and building colors Staff recommends that the ARB forward the following recommendations to the Agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: ■ The ARB recommends approval of the Initial Plan without conditions. ■ Note that a Certificate of Appropriateness is required prior to final site plan approval. Regarding recommendations on the plan as it relates to the guidelines: o Revise non-native plants to native species. • Regarding conditions to be satisfied prior to issuance of a grading permit: o Show tree protection fencing on, and coordinated throughout, the grading, landscaping, and erosion and sediment control plans. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to final site plan approval. The following items must be addressed, in addition to all items on the Final Site Plan Checklist. 1. The architecture of Blocks 10 and 11 does not require ARB review due to anticipated lack of visibility. 2. Provide dimensioned architectural elevations for review. Provide material call -outs on the elevations. 3. Eliminate Arctic white, woodland cream, cobblestone, sail cloth, pearl grey, and light mist from the color options for lots 1 and 20 — 33. 4. Add the standard mechanical equipment note to the site and architectural drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 5. Provide sufficient details in the site plan to show that all proposed light fixtures meet the requirements of the lighting ordinance. 6. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 7. Revise the buffer planting to include a greater variety of trees and shrubs, both deciduous and evergreen. 8. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 9. Revise the plans to show adequate tree protection fencing. TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawin Date/Revision Date ARB Plan 1 Cover 1/21/20 IA Proffers 1/21/20 1B Proffers 1/21/20 2 Overall Master Plan 1/21/20 3 Overall Block Plan 1/21/20 4 Existing Conditions 1/21/20 5 Layout Plan 1/21/20 5A Layout Plan 1/21/20 6 Utility Plan 1/21/20 6A Utility Plan 1/21/20 7 Layout & Utility Plan 1/21/20 8 Layout & Utility Plan 1/21/20 9 Grading & Drainage Plan 1/21/20 9A Grading & Drainage Plan 1/21/20 10 Grading & Drainage Plan 1/21/20 11 Grading & Drainage Plan 1/21/20 12 Landscaping Plan 1/21/20 13 Landscaping Plan 1/21/20 14 Site Section Ma 1/21/20 15 Site Section Profiles 1/21/20 Preliminary Plan 12 Notes & Details 1/21/20 13 Notes & Details 1/21/20 14 Stormwater Management Plan 1/21/20 Material samples: Owens Corning Duration Shingles: Onyx; Hardiplank siding: assorted colors (physical samples and color swatches, see Attachment B); Stone (color photocopy) 10 ATTACHMENT A r Brookhill Development Land Use Map 01 {. ILI fr1 i 16& a 'Ik Oa tiS 11 A. • *� , ;%MLtifYl;141k i dF +# r ram'+ VL= j . umm og*WT► A ]*HU4a DF"TY Brookhill Blocks 9, 10 and 11 are located in the northwest corner of the development. 11 ATTACHMENT B Applicant's proposed materials/colors table T Brookhill Villas Stanley Martin Homes Material Table Feature Color Material Siding Various Hardi lank / Board & Batton / Stone Fascia / Trim White Aluminum Doors Various Fiberglass Windows White Vinyl Roof Onyx Asphalt Shingles Siding Colors Antic White Woodland Cream Cobblestone Sail Cloth Timberhark Night Grey Sandstone Beige Pearl Grey Grey Slate Rich Expresso Heathered Moss Light Mist Khaki Brown 12