TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
February 20, 2020
Matt Wentland
c/o Albemarle County Community Dev.
401 McIntire Rd, Rm. 227
Charlottesville, VA 22902-4596
608 Preston Avenue P 434.295.5624
Suite 200 F 434.295.8317
Charlottesville, VA 22903 www.timmons.com
RE: Western Albemarle High School Site Improvements — Plan Review — WP02019-00054 -
Comment Response Letter
We have reviewed all of your comments from February 5, 2020 (Rev. 1) and made the
necessary revisions. Please find our responses to the comments below in bold lettering.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code Section 17-405. A
SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures
necessary. This SWPPP is disapproved, and the reasons are provided in the comments
below.
1. Provide a signature on the Registration Statement. The Registration Statement
instructions should not be submitted.
A signature will be provided once a contractor has been selected.
(Rev. 1) Comment not addressed. A permit cannot be issued until addressed.
A signature will be provided once a contractor has been selected for the project.
2. The 6th order HUC must be provided on the Registration Statement.
Registration statement as been updated with a 6th order HUC.
(Rev. 1) Comment addressed.
3. A Notice of general permit coverage must be included prior to final approval. (17-
405.A.2).
General Permit coverage has been provided in section 11.
(Rev.1) Comment addressed.
4. Qualifications and contact information for qualified personnel is required. (17-405.13
and 9VAC25-850-10 et seq.).
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
The school board is the owner of the project and Joseph Letteri is the contact for
the project. Once a contractor has been selected after bidding, the qualified
personnel information may be changed over for final signature before the DEQ
permit is applied for.
(Rev. 1) Response noted.
5. Provide a signed certification (9VAC25-870-370).
A signed certification will be provided once a contractor has been selected.
(Rev. 1) Comment not addressed. A permit cannot be issued until addressed.
A signed certification will be provided once a contractor has been selected.
6. Provide a Delegation of authority (17-405.C.).
A delegation of authority has been proved in section 10 and will be filled out once
a contractor has been selected.
(Rev. 1) Response noted.
7. Now that the WPO number has been generated, please include it on the plan cover
sheet and calculations packet.
WPO number has been added to the plan cover sheet and the cover of the calc
book.
(Rev. 1) Comment addressed.
8. Please include the requirement for record drawings (17-422).
Requirements have been added to sheet C3.0.
(Rev. 1) Comment addressed.
9. General Permit, Part II.G.2.a(2) prohibits the use of representative inspections for
construction activities discharging to impaired waters. Please delete the paragraph.
Paragraph has been removed as requested.
(Rev. 1) Comment addressed.
10. Provide a copy of the General Permit prior to final approval.
Acknowledged
(Rev. 1) Response noted.
11. Please note that additional comments may be generated based on the response to
the comments provided.
Acknowledged
(Rev. 1) Response noted.
B. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or
disapprove a SWMP. This plan is disapproved.
1. The drainage areas for level spreaders appear to be incomplete. The entire areas
draining to them must be included on the plans, and in the calculations. Level
spreader #2: if any roof drains discharge to the courtyard, the volumes must be
noted and included in calculations.
Level spreader calcs have been adjusted and revised and are called out to
reference inlet and pipe calcs in the calc book. There are no surface roof drains
discharging to the courtyard.
(Rev. 1) Commend addressed.
2. On Sheet C5.2, the access road to the field house does not appear to be included in
the drainage area, except at the lower end. This is related to comment #2 above.
Include all of the areas draining to BMPs.
Drainage areas have been revised and now include the access road to the field
house.
(Rev. 1) Comment addressed.
3. Sheet C6.0: In the water quality calculation box, the post -development impervious
land cover does not match the total from the labels on the drawings on the same
page. Please correct.
Water quality and box and post impervious box have been corrected and labels
have been removed from the drawing.
(Rev. 1) Comment addressed.
4. The Sedimentation Basin elevation call "663.25" appears to be incorrect. Please
correct.
This comment appears to have been on the Biofilter. Biofilter and detail have
been removed from design.
(Rev.1) Comment addressed.
6. Provide arrows indicating direction of stormwater flow (17-405.A.5.a).
Flow arrows are shown on sheet C5.0 and C5.1.
(Rev. 1) Comment addressed.
7. Provide a description of the long-term operation and maintenance plan (17-
403.A.5).
Biofilter has been removed from design.
(Rev. 1) Comment addressed.
8. Level spreader #1 is not shown on the profile on C7.0. It is labeled, but not shown
like the others. Please show.
Level spreader #1 is now shown on the profile sheet C7.0.
(Rev. 1) Comment addressed.
Revision 1 Comments:
9. Please contact Ana Kilmer in our office prior to purchasing the 0.30 Ib/yr of nutrient
credits.
Comment Acknowledged. Ana will be contacted prior to the purchasing of nutrient
credits.
C. Erosion and Sediment Control Plan (ESCP)
Virginia Code 62.1-44.15:55 requires the VESCP authority to approve or disapprove an
ESCP. This plan is disapproved, and the reasons are provided in the comments below.
The erosion control plan content requirements can be found in County Code section 17-
402.
1. Sheet C1.0 General Notes, #8 refers to VDOT. Please delete.
Note has been deleted.
(Rev. 1) Comment addressed.
2. Include a note to minimize soil compaction, per 17-402.A.6.
Section 17-402 of Albemarle County Code does not have a section A.6. Please
provide more information on the note required.
(Rev. 1) Comment withdrawn.
3. Sheets C3.2 and C3.3 legends: labels for SF and SSF appear to be switched. Please
correct.
Legend has been updated.
(Rev. 1) Comment addressed.
4. Sheets C2.0 and C3.4: provide topo in the locations of "wash rack".
Additional topo has been provided in the location of the eastern wash rack and
proposed contour and note have been added to ensure eastern wash rack drains
to sump.
(Rev. 1) Comment addressed.
5. The Wash Rack detail specifies the use of a sediment trapping device. Please show
such devices.
Sump area has been added for western wash rack. Eastern wash rack drains to
sediment trap.
(Rev. 1) Comment addressed.
6. Provide the land disturber as required by 17-402.C.4.
Land disturber information will be provided with final SWPPP when available
before permit is applied for from DEQ.
(Rev.1) Response noted.
7. The inspection log templates do not include all of the information required to be
inspected (see 9VAC25-880-70, Part II sections B and G.) Please provide all of the
required information, to ensure that the inspector documents a thorough
inspection.
Inspection log templates have been added to section 12
(Rev. 1) Comment addressed.
D. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404. This plan is
approved, for the reasons provided below.
1. Show area(s) to be used for porta john, construction waste and other support
activities.
Areas have been shown on Pollution Prevention Plan
(Rev.1) Comment addressed.
2. See comment above for the sediment trap on the ramp project for wash waters (14-
404.B.1.a).
Comment above has been acknowledged and wash waters have been taken into
consideration.
(Rev. 1) Comment addressed.
3. The location of the temporary materials storage trailer described in Section F of the
PPP narrative is not shown on the plan.
A temporary materials storage trailer has been added to the plans
(Rev. 1) Comment addressed.
We have included PDF copies of the plans and calculations for your review. If you have any
questions or comments, please feel free to give me a call at 434.295.5624.
Sincerely,
Jonathan Showalter, PE
Project Manager