HomeMy WebLinkAboutSDP202000010 Study 2020-03-02SHIMP ENGINEERING, P.C.
Design Focused Engineering
Jodie Filardo, Director of Community Development
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
Cc: Adam Moore, VDOT Adam.Moore(cr�,vdot.vir ig nia.gov
Kevin McDermott, Transportation Planner kmcdermottkalbemarle.org
Megan Nedostup, Principal Planner mnedost Vkalbemarle.org
March 2, 2020
RE: REGENTS SCHOOL REQUEST FOR INCREASED ENROLLMENT
Dear Ms. Filardo,
Condition #3 approved with SP2018-11 "The Regents School of Charlottesville," allows for operational
changes at the Regents School site on tax map parcels 07600-00-00-01700 and 07500-00-00-06600
contingent upon the submittal of a formal request that includes a Traffic Impact Assessment (TIA)
which demonstrates adherence to certain traffic impact thresholds. In accordance with Condition #3,
this is a formal request for operational changes to increase student enrollment from 280 students to 328
students. As required by Condition #3, a Traffic Impact Assessment (TIA) is included with this request.
The TIA, completed by EPR dated December 19, 2019, demonstrates that at an enrollment of 328
students, the proposed operational changes at the Regents School would not result in any movements
with delays in excess of the thresholds outlined in Condition #3. As allowed by Condition #3 (e), the
Traffic Impact Assessment dated October 12, 2018 and associated supplemental TIA's submitted with
SP201800011 is being used as the baseline traffic data for this supplement. The TIA dated December
19, 2019adeJkRF 9sffi4 W ;lkWIHMM�16WiiMiiliti Ld'it%,Avi cents with a delay greater
than 50 seconds; and
b. The proposed operational changes would not result in any movements with a delay greater
than 35 seconds, unless it will have a delay greater than 35 seconds in the future no -build,
provided that if the future no -build shows a delay greater than 35 seconds the future build
cannot increase by more than 10 seconds; and
c. The proposed operational changes would not result in any movements increasing by more
than 15 seconds between the future build and no build conditions; and
d. Operations at the US 29 Bypass interchange at Fontaine Avenue Extended may not result in it
being placed on the VDOT Top 100 Potential for Safety Improvement (PSI) locations for
intersections or segments.
The "no build condition" for 280 students with a 7:45 a.m. start time, compared to the proposed "build
condition" for 328 students with 7:45 a.m. start time is provided below:
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com
No Build
March 6, 2019 1 Regents School Site Traffic Assessment
Enrollment: 280; Start time: 7:45 a.m.
2028 Build AM
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/1.5
A/2.8
C/22.1
B
Approach LOS/Delay
A/1.5
A/2.8
C/22.1
10.4
Movement Queue
4
80
297
Build
December 19, 2019 1 Regents School Site Traffic Assessment
Enrollment: 328; Start time: 7:45 a.m.
Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/1.8
A/3.3
D/34.9
B
Approach LOS/Delay
A/1.8
A/3.3
D/34.9
14.8
Movement Queue
10
91
375
Traffic Supplement #6 references Traffic Supplement #5 which was not accepted by the County for
review because it was completed after a submittal deadline. For reference purposes, Supplement #5
has been included. The methodology for calculating trips in Supplement #6 is the same that was used
for the October 12, 2018 traffic supplement.
Thank you for your review of this request.
Best Regards,
Kelsey Schlein
Planner
Kelsey(a,shimp-engineering. com
ATTACHMENTS:
Traffic Supplement #6 dated December 19, 2019 completed by EPR
Traffic Supplement #5 dated July 5, 2019 completed by EPR (for reference purposes)
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
E
TO: JUSTIN SHIMP, P.E.
FROM: BILL WUENSCH, P.E., PTOE;
WEI HE
ORGANIZATION: SHIMP ENGINEERING DATE: DECEMBER 19, 2019
PHONE NUMBER:
SENDER'S REFERENCE NUMBER:
RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER:
SUPPLEMENT -SCHOOL ENROLLMENT THRESHOLD
❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE
The purpose of this memorandum is to summarize a supplemental traffic analysis for the
proposed Regents School Site to examine the threshold of the school enrollment that will not
result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp
intersection greater than 35 seconds in the future year 2028.
This analysis assumed the school start time being 7:45 AM and all school trips arriving in the
morning between 7:15-7:45 AM to examine the future year 2028 build conditions between
7:15-7:45 AM.
Based on the findings in the prior supplement dated July 5th, 2019, the proposed Regents
School was tested with an enrollment of approximately 330 students in the future year 2028.
The test results indicated that the enrollment of 330 students in the future year 2028 will result
in the delay of 35.6 seconds on Route 29 Southbound Ramp approach, and the enrollment of
328 students in the future year 2028 will not result in the delay of any movements at Fontaine
Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year
2028.
The following provides a brief summary of the information.
Enrollment of 330 Students
Trip Generation
The trip generation of the proposed Regents School (330 students) was calculated using the
same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and
summarized in Table 1 below.
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Table 1 Trip Generation (330 Students)
Scenario
2028 AM w/ 330 students
2028 PM w/ 330 students
In/Out
Inbound
Outbound
Inbound
Outbound
Total Trips
142
91
91
142
Traffic Volumes
2028 No Build Traffic Volumes between 7:15-7:45 AM
2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement
(3/6/2019) and illustrated in Figure 1 below.
Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM
AM 29 SB
EBT
EBR
WBL
WBT
SBL SBT
SBR
Total
,
7:15
4
4
41
4
67 0
0
120
~
2 2 290 14
Vehicle 7:30
8
2
55
3
78 1
1,
143
It 4
r
Total
192
1/2 Hour
12
6
96
7
145 1
1
268
Fontaine
Hour
24
12
192
14
290 2
2
536
24
P H F
0.91
Truck
12
1/2 Hour
1
0
0
1
2 1
0
HVP
9%
0%
0%
14%
2% 100%
0%
29 SB
Site Trip Distribution and Assignment
Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in
Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local
residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm.
Figure 2 Site Trip Distribution
AM
29 SB
25%
0
0
~ 73%
«�
i
�►
r o
Fontaine
73%
~
25%
29 SB
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
The site trips were assigned to the road network based on the trip generation and the
distribution as noted above. The build condition site trips for the future year 2028 (330
students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in
Figure 3 below.
Figure 3 2028 Site Trips (330 Students)
rM 29 5B
4-W
r 0
EBT EBR
i
WBL WBT SBL SBT
i i i
SBR Total
7:15
26 9
0 42 0
0 14 92
Vehicl 7:30
40 14
0 62 0
0 22 137
e Total
112 Hour
66 23
A 0
ON 229
Hour
132 46
0 208 0
0 72 458
PHF
Truck 1/2 Hour
1 0
0 1 0
0 0
HVP
2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students)
Combining the background traffic with the site trips as shown, Figure 4 below illustrates the
build condition traffic volume calculation (330 students).
Figure 4 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students)
AM 29 SB
EBT
EBR
WBL
WBT
SBL SBT
SBR
Total
7:15
30
13
41
46
67 0
14
212
74 2 290 ~ 222
Vehicl 7:30
48
16
55
65
78 1
23
285
I L1 r
a Total
192
1/2 Hour
78
29
96
111
145 1
37
497
Fontaine
Hour
156
58
192
222
290 2
74
994
156
PHF
0.87
Truck
58
1/2 Hour
2
0
0
2
2 1
0
HVP
3%
0%
0%
2%
1% 100%
0%
29 SB
2028 Build Conditions between 7:15-7:45 AM (330 Students)
The future year 2028 build conditions between 7:15-7:45 AM (330 students) were analyzed in
Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site
Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of
service, delay, and queue analyses. The following Table 2 summarizes the analysis results:
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Table 2 2028 Build Conditions between 7:15-7:45 AM (330 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
I. Rte 29/Fontaine SB
Movement LOS/Delay
A/1.8
A/3.3
E/35.6
c
Approach LOS/Delay
A/1.8
A/3.3
E/35.6
15.2
Movement Queue
9
94
382
Based on the results in Table 2, the enrollment of 330 students in the future year 2028 will
result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach.
Enrollment of 328 Students
Trip Generation
The trip generation of the proposed Regents School (328 students) was calculated using the
same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and
summarized in Table 3 below.
Table 3 Trip Generation (328 Students)
Scenario
2028 AM w/ 328 students
2028 PM w/ 328 students
In/Out
Inbound
Outbound
Inbound
Outbound
Total Trips
141
90
90
141
Traffic Volumes
Site Trip Distribution and Assignment
The site trips were assigned to the road network based on the trip generation and the
distribution as noted above. The build condition site trips for the future year 2028 (328
students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in
Figure 5 below.
Figure 5 2028 Site Trips (328 Students)
AM 29 5B
970 D 0 ~ -
41 4 r
Fontain
132
44
7
29 5B
EBT
EBR
WBL WBT SBL SBT
SBR Total
7:15
26
9
0 41 0
0 14 90
Vehicl 7:30
40
13
0 62 D
0 21 136
e Total
1/2Hour
66
22
ON 0
ON 226
Hour
132
44
0 206 0
0 70 452
PHF
Truck
1/2Hour
1
0
0 1 0
0 0
HVP
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students)
Combining the background traffic with the site trips as shown, Figure 6 below illustrates the
build condition traffic volume calculation (328 students).
Figure 6 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students)
AM 29 SB
EBT
EBR
WBL
WBT
SBL SBT
SBR
Total
7:15
30
13
41
45
67
0 14
210
72 2 290 ~ 220 Vehicl 7:30
48
15
55
65
78
1 22
284
1 L► a Total
192 112 Hour
78
28
95
110
145
1 36
494
Fontaine Hour
156
56
192
220
290
2 72
988
156 PHF
D.B7
56 Truck IJ2 Hour
2
0
D
2
2
1 D
HVP
3%
D%
D%
2%
1% 1DD%
D%
2028 Build Conditions between 7:15-7:45 AM (328 Students)
The future year 2028 build conditions between 7:15-7:45 AM (328 students) were analyzed in
Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site
Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of
service, delay, and queue analyses. The following Table 4 summarizes the analysis results:
Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/1.8
A/3.3
D/34.9
B
Approach LOS/Delay
A/1.8
A/3.3
D/34.9
14.8
Movement Queue
10
91
375
Based on the results in Table 4, the enrollment of 328 students in the future year 2028 will not
result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp
intersection greater than 35 seconds in the future year 2028.
Finding
Based on the analysis results above, an enrollment of 328 students is the threshold of the
school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route
29 Southbound Ramp intersection greater than 35 seconds in the future year 2028.
End of Memorandum
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Attachment:
2028 Build Conditions Between 7:15-7:45 AM (330 Students) SimTraffic Reports
2028 Build Conditions Between 7:15-7:45 AM (328 Students) SimTraffic Reports
SimTraffic Performance Report
2028 Build AM 330 Students 12/18/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied DelNeh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.3
3.3 35.6 15.2
Denied Del/Veh (s) 0.3
Total DelNeh (s) 15.9
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 330 Students 12/18/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
9
94
382
0
34
154
5
74
329
708
507
520
Network wide Queuing Penalty: 0
N
1
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 328 Students 12/18/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.3
3.3 34.9 14.8
Denied Del/Veh (s) 0.3
Total DelNeh (s) 15.5
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 328 Students 12/18/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
10
91
375
0
33
150
5
71
320
708
507
520
Network wide Queuing Penalty: 0
N
Regents School Study Supplement SimTraffic Report
EPR Page 1
EPRpc EPR, PAC. "ENGINEERING S� PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902
MEMORANDUM
TO: JUSTIN SHIMP, P.E.
ORGANIZATION: SHIMP ENGINEERING
...................................................................................................
PHONE NUMBER:
RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT
SUPPLEMENT 5—YEAR 2028 RESULTS WITH 320, 360, 400,
440, AND 480 STUDENTS
FROM: BILL WUENSCH, P.E., PTOE;
WEI HE
.................................................................................
DATE: JULY 05, 2019
SENDER'S REFERENCE NUMBER:
............................................................................................................................................
YOUR REFERENCE NUMBER:
❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE
As requested, this document summarizes the year 2028 build scenario AM between 7:15-7:45
AM traffic results with 320, 360, 400, 440, and 480 students. The following provides the
summary tables.
Table 12028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 320 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SIB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SIB
Movement LOS/Delay
A/1.7
A/3.3
D/32.2
B
Approach LOS/Delay
A/1.7
A/3.3
D/32.2
13.5
Movement Queue
12
94
348
Table 2 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 360 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SIB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SIB
Movement LOS/Delay
A/1.8
A/3.4
E/47.4
c
Approach LOS/Delay
A/1.8
A/3.4
E/47.4
18.7
Movement Queue
18
107
460
Table 3 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 400 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SIB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SIB
Movement LOS/Delay
A/1.9
A/3.5
F/70.6
D
FApproach LOS/Delay
t
A/1.9
A/3.5
F/70.6
26.6
ovement Queue
16
118
510
EPRpcEPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902
Table 4 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 440 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/2.0
A/3.8
F/110.9
E
Approach LOS/Delay
A/2.0
A/3.8
F/110.9
39.9
Movement Queue
16
119
561
Table 5 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 480 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB
Fontaine WB
Rte 29 SB
Overall
EBT/R
WBL/T
SBL/R
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/2.1
A/3.9
F/150.7
F
Approach LOS/Delay
A/2.1
A/3.9
F/150.7
51.4
Movement Queue
20
124
564
End of Memorandum
Attachment: SimTraffic Reports
SimTraffic Performance Report
2028 Build AM 320 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.7
Total Network Performance
WB SB All
LT LTR
0.3
3.3 32.2 13.5
Denied Del/Veh (s) 0.3
Total DelNeh (s) 14.2
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 320 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB
TR LT
12 94
1 33
6 70
708 507
Network wide Queuing Penalty: 0
SB
LTR
348
140
294
520
0
0
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 360 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.8
3.4 47.4 18.7
Denied Del/Veh (s) 0.8
Total DelNeh (s) 19.5
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 360 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
18
107
460
1
35
186
9
76
398
708
507
520
Network wide Queuing Penalty: 0
M
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 400 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane
EB WB SB All
Movements Served TR LT LTR
Denied Del/Veh (s) 3.6
Total Del/Veh (s) 1.9 3.5 70.6 26.6
Total Network Performance
Denied Del/Veh (s) 3.6
Total Del/Veh (s) 27.4
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 400 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
16
118
510
1
36
247
8
81
536
708
507
520
Network wide Queuing Penalty: 0
W
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 440 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 2.0
Total Network Performance
WB SB All
LT LTR
12.4
3.8 110.9 39.9
Denied Del/Veh (s) 12.4
Total DelNeh (s) 40.7
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 440 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
16
119
561
1
40
356
8
87
639
708
507
520
Network wide Queuing Penalty: 0
27
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 480 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 2.1
Total Network Performance
WB SB All
LT LTR
38.1
3.9 150.7 51.4
Denied Del/Veh (s) 38.1
Total DelNeh (s) 52.2
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 480 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB
WB
SB
TR
LT
LTR
20
124
564
1
43
434
9
93
695
708
507
520
Network wide Queuing Penalty: 0
Regents School Study Supplement SimTraffic Report