Loading...
HomeMy WebLinkAboutSDP202000010 Study 2020-03-02SHIMP ENGINEERING, P.C. Design Focused Engineering Jodie Filardo, Director of Community Development County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Cc: Adam Moore, VDOT Adam.Moore(cr�,vdot.vir ig nia.gov Kevin McDermott, Transportation Planner kmcdermottkalbemarle.org Megan Nedostup, Principal Planner mnedost Vkalbemarle.org March 2, 2020 RE: REGENTS SCHOOL REQUEST FOR INCREASED ENROLLMENT Dear Ms. Filardo, Condition #3 approved with SP2018-11 "The Regents School of Charlottesville," allows for operational changes at the Regents School site on tax map parcels 07600-00-00-01700 and 07500-00-00-06600 contingent upon the submittal of a formal request that includes a Traffic Impact Assessment (TIA) which demonstrates adherence to certain traffic impact thresholds. In accordance with Condition #3, this is a formal request for operational changes to increase student enrollment from 280 students to 328 students. As required by Condition #3, a Traffic Impact Assessment (TIA) is included with this request. The TIA, completed by EPR dated December 19, 2019, demonstrates that at an enrollment of 328 students, the proposed operational changes at the Regents School would not result in any movements with delays in excess of the thresholds outlined in Condition #3. As allowed by Condition #3 (e), the Traffic Impact Assessment dated October 12, 2018 and associated supplemental TIA's submitted with SP201800011 is being used as the baseline traffic data for this supplement. The TIA dated December 19, 2019adeJkRF 9sffi4 W ;lkWIHMM�16WiiMiiliti Ld'it%,Avi cents with a delay greater than 50 seconds; and b. The proposed operational changes would not result in any movements with a delay greater than 35 seconds, unless it will have a delay greater than 35 seconds in the future no -build, provided that if the future no -build shows a delay greater than 35 seconds the future build cannot increase by more than 10 seconds; and c. The proposed operational changes would not result in any movements increasing by more than 15 seconds between the future build and no build conditions; and d. Operations at the US 29 Bypass interchange at Fontaine Avenue Extended may not result in it being placed on the VDOT Top 100 Potential for Safety Improvement (PSI) locations for intersections or segments. The "no build condition" for 280 students with a 7:45 a.m. start time, compared to the proposed "build condition" for 328 students with 7:45 a.m. start time is provided below: 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com No Build March 6, 2019 1 Regents School Site Traffic Assessment Enrollment: 280; Start time: 7:45 a.m. 2028 Build AM Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.5 A/2.8 C/22.1 B Approach LOS/Delay A/1.5 A/2.8 C/22.1 10.4 Movement Queue 4 80 297 Build December 19, 2019 1 Regents School Site Traffic Assessment Enrollment: 328; Start time: 7:45 a.m. Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 D/34.9 B Approach LOS/Delay A/1.8 A/3.3 D/34.9 14.8 Movement Queue 10 91 375 Traffic Supplement #6 references Traffic Supplement #5 which was not accepted by the County for review because it was completed after a submittal deadline. For reference purposes, Supplement #5 has been included. The methodology for calculating trips in Supplement #6 is the same that was used for the October 12, 2018 traffic supplement. Thank you for your review of this request. Best Regards, Kelsey Schlein Planner Kelsey(a,shimp-engineering. com ATTACHMENTS: Traffic Supplement #6 dated December 19, 2019 completed by EPR Traffic Supplement #5 dated July 5, 2019 completed by EPR (for reference purposes) EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 E TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING DATE: DECEMBER 19, 2019 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER: SUPPLEMENT -SCHOOL ENROLLMENT THRESHOLD ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic analysis for the proposed Regents School Site to examine the threshold of the school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. This analysis assumed the school start time being 7:45 AM and all school trips arriving in the morning between 7:15-7:45 AM to examine the future year 2028 build conditions between 7:15-7:45 AM. Based on the findings in the prior supplement dated July 5th, 2019, the proposed Regents School was tested with an enrollment of approximately 330 students in the future year 2028. The test results indicated that the enrollment of 330 students in the future year 2028 will result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach, and the enrollment of 328 students in the future year 2028 will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. The following provides a brief summary of the information. Enrollment of 330 Students Trip Generation The trip generation of the proposed Regents School (330 students) was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 1 below. EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Table 1 Trip Generation (330 Students) Scenario 2028 AM w/ 330 students 2028 PM w/ 330 students In/Out Inbound Outbound Inbound Outbound Total Trips 142 91 91 142 Traffic Volumes 2028 No Build Traffic Volumes between 7:15-7:45 AM 2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement (3/6/2019) and illustrated in Figure 1 below. Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total , 7:15 4 4 41 4 67 0 0 120 ~ 2 2 290 14 Vehicle 7:30 8 2 55 3 78 1 1, 143 It 4 r Total 192 1/2 Hour 12 6 96 7 145 1 1 268 Fontaine Hour 24 12 192 14 290 2 2 536 24 P H F 0.91 Truck 12 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 0% 0% 14% 2% 100% 0% 29 SB Site Trip Distribution and Assignment Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm. Figure 2 Site Trip Distribution AM 29 SB 25% 0 0 ~ 73% «� i �► r o Fontaine 73% ~ 25% 29 SB EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 (330 students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 3 below. Figure 3 2028 Site Trips (330 Students) rM 29 5B 4-W r 0 EBT EBR i WBL WBT SBL SBT i i i SBR Total 7:15 26 9 0 42 0 0 14 92 Vehicl 7:30 40 14 0 62 0 0 22 137 e Total 112 Hour 66 23 A 0 ON 229 Hour 132 46 0 208 0 0 72 458 PHF Truck 1/2 Hour 1 0 0 1 0 0 0 HVP 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students) Combining the background traffic with the site trips as shown, Figure 4 below illustrates the build condition traffic volume calculation (330 students). Figure 4 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students) AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 30 13 41 46 67 0 14 212 74 2 290 ~ 222 Vehicl 7:30 48 16 55 65 78 1 23 285 I L1 r a Total 192 1/2 Hour 78 29 96 111 145 1 37 497 Fontaine Hour 156 58 192 222 290 2 74 994 156 PHF 0.87 Truck 58 1/2 Hour 2 0 0 2 2 1 0 HVP 3% 0% 0% 2% 1% 100% 0% 29 SB 2028 Build Conditions between 7:15-7:45 AM (330 Students) The future year 2028 build conditions between 7:15-7:45 AM (330 students) were analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 2 summarizes the analysis results: EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Table 2 2028 Build Conditions between 7:15-7:45 AM (330 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R I. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 E/35.6 c Approach LOS/Delay A/1.8 A/3.3 E/35.6 15.2 Movement Queue 9 94 382 Based on the results in Table 2, the enrollment of 330 students in the future year 2028 will result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach. Enrollment of 328 Students Trip Generation The trip generation of the proposed Regents School (328 students) was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 3 below. Table 3 Trip Generation (328 Students) Scenario 2028 AM w/ 328 students 2028 PM w/ 328 students In/Out Inbound Outbound Inbound Outbound Total Trips 141 90 90 141 Traffic Volumes Site Trip Distribution and Assignment The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 (328 students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 5 below. Figure 5 2028 Site Trips (328 Students) AM 29 5B 970 D 0 ~ - 41 4 r Fontain 132 44 7 29 5B EBT EBR WBL WBT SBL SBT SBR Total 7:15 26 9 0 41 0 0 14 90 Vehicl 7:30 40 13 0 62 D 0 21 136 e Total 1/2Hour 66 22 ON 0 ON 226 Hour 132 44 0 206 0 0 70 452 PHF Truck 1/2Hour 1 0 0 1 0 0 0 HVP EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students) Combining the background traffic with the site trips as shown, Figure 6 below illustrates the build condition traffic volume calculation (328 students). Figure 6 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students) AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 30 13 41 45 67 0 14 210 72 2 290 ~ 220 Vehicl 7:30 48 15 55 65 78 1 22 284 1 L► a Total 192 112 Hour 78 28 95 110 145 1 36 494 Fontaine Hour 156 56 192 220 290 2 72 988 156 PHF D.B7 56 Truck IJ2 Hour 2 0 D 2 2 1 D HVP 3% D% D% 2% 1% 1DD% D% 2028 Build Conditions between 7:15-7:45 AM (328 Students) The future year 2028 build conditions between 7:15-7:45 AM (328 students) were analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 4 summarizes the analysis results: Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 D/34.9 B Approach LOS/Delay A/1.8 A/3.3 D/34.9 14.8 Movement Queue 10 91 375 Based on the results in Table 4, the enrollment of 328 students in the future year 2028 will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. Finding Based on the analysis results above, an enrollment of 328 students is the threshold of the school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. End of Memorandum EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Attachment: 2028 Build Conditions Between 7:15-7:45 AM (330 Students) SimTraffic Reports 2028 Build Conditions Between 7:15-7:45 AM (328 Students) SimTraffic Reports SimTraffic Performance Report 2028 Build AM 330 Students 12/18/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied DelNeh (s) Total Del/Veh (s) 1.8 Total Network Performance WB SB All LT LTR 0.3 3.3 35.6 15.2 Denied Del/Veh (s) 0.3 Total DelNeh (s) 15.9 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 330 Students 12/18/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 9 94 382 0 34 154 5 74 329 708 507 520 Network wide Queuing Penalty: 0 N 1 Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 328 Students 12/18/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 1.8 Total Network Performance WB SB All LT LTR 0.3 3.3 34.9 14.8 Denied Del/Veh (s) 0.3 Total DelNeh (s) 15.5 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 328 Students 12/18/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 10 91 375 0 33 150 5 71 320 708 507 520 Network wide Queuing Penalty: 0 N Regents School Study Supplement SimTraffic Report EPR Page 1 EPRpc EPR, PAC. "ENGINEERING S� PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MEMORANDUM TO: JUSTIN SHIMP, P.E. ORGANIZATION: SHIMP ENGINEERING ................................................................................................... PHONE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT SUPPLEMENT 5—YEAR 2028 RESULTS WITH 320, 360, 400, 440, AND 480 STUDENTS FROM: BILL WUENSCH, P.E., PTOE; WEI HE ................................................................................. DATE: JULY 05, 2019 SENDER'S REFERENCE NUMBER: ............................................................................................................................................ YOUR REFERENCE NUMBER: ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE As requested, this document summarizes the year 2028 build scenario AM between 7:15-7:45 AM traffic results with 320, 360, 400, 440, and 480 students. The following provides the summary tables. Table 12028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 320 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SIB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.7 A/3.3 D/32.2 B Approach LOS/Delay A/1.7 A/3.3 D/32.2 13.5 Movement Queue 12 94 348 Table 2 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 360 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SIB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.8 A/3.4 E/47.4 c Approach LOS/Delay A/1.8 A/3.4 E/47.4 18.7 Movement Queue 18 107 460 Table 3 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 400 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SIB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.9 A/3.5 F/70.6 D FApproach LOS/Delay t A/1.9 A/3.5 F/70.6 26.6 ovement Queue 16 118 510 EPRpcEPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Table 4 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 440 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/2.0 A/3.8 F/110.9 E Approach LOS/Delay A/2.0 A/3.8 F/110.9 39.9 Movement Queue 16 119 561 Table 5 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 480 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/2.1 A/3.9 F/150.7 F Approach LOS/Delay A/2.1 A/3.9 F/150.7 51.4 Movement Queue 20 124 564 End of Memorandum Attachment: SimTraffic Reports SimTraffic Performance Report 2028 Build AM 320 Students 07/05/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 1.7 Total Network Performance WB SB All LT LTR 0.3 3.3 32.2 13.5 Denied Del/Veh (s) 0.3 Total DelNeh (s) 14.2 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 320 Students 07/05/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB TR LT 12 94 1 33 6 70 708 507 Network wide Queuing Penalty: 0 SB LTR 348 140 294 520 0 0 Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 360 Students 07/05/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 1.8 Total Network Performance WB SB All LT LTR 0.8 3.4 47.4 18.7 Denied Del/Veh (s) 0.8 Total DelNeh (s) 19.5 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 360 Students 07/05/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 18 107 460 1 35 186 9 76 398 708 507 520 Network wide Queuing Penalty: 0 M Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 400 Students 07/05/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB WB SB All Movements Served TR LT LTR Denied Del/Veh (s) 3.6 Total Del/Veh (s) 1.9 3.5 70.6 26.6 Total Network Performance Denied Del/Veh (s) 3.6 Total Del/Veh (s) 27.4 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 400 Students 07/05/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 16 118 510 1 36 247 8 81 536 708 507 520 Network wide Queuing Penalty: 0 W Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 440 Students 07/05/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 2.0 Total Network Performance WB SB All LT LTR 12.4 3.8 110.9 39.9 Denied Del/Veh (s) 12.4 Total DelNeh (s) 40.7 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 440 Students 07/05/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 16 119 561 1 40 356 8 87 639 708 507 520 Network wide Queuing Penalty: 0 27 Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 480 Students 07/05/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 2.1 Total Network Performance WB SB All LT LTR 38.1 3.9 150.7 51.4 Denied Del/Veh (s) 38.1 Total DelNeh (s) 52.2 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 480 Students 07/05/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 20 124 564 1 43 434 9 93 695 708 507 520 Network wide Queuing Penalty: 0 Regents School Study Supplement SimTraffic Report EPR Page 1