HomeMy WebLinkAboutSP202000005 SP Checklist 2020-03-03SPECIAL USE PERMIT APPLICATION CHECKLIST for
"Ivy Proper" — TMPs #58A2-14 and #58A2-20
Completed by:
After the mandatory pre -application meeting, County staff will mark this checklist
TMP
appropriately so that it is clear to the applicant which information specified in
11/8/19
Zoning Ordinance Section 33.33 must be submitted with the official application.
Required for
Provided with
application?
application
(County Staff)
(Applicant)
X
X
ZONING ORDINANCE SECTION 33.33:
YES
NO
X
)(
A. A narrative of the project proposal, including its public need or benefit;
X
X
B. A narrative of the proposed project's consistency with the Comprehensive Plan
including the land use plan and the master plan for the applicable development area;
X
C. A narrative of the proposed project's impacts on public facilities and public
�(
infrastructure.
X
D. A narrative of the proposed project's impacts on environmental features.
X
Y,
E. One or more maps showing the proposed project's regional context and existing
natural and manmade physical conditions.
X
X
F. A conceptual plan showing, as applicable:
X
1. the street network, including circulation within the project and connections to
existing and proposed or planned streets within and outside of the project;
X
2. typical street cross -sections to show proportions, scale and streetscape/cross-
sections/circulation;
X
3. the general location of pedestrian and bicycle facilities;
X
4. building envelopes and parking envelopes;
X
5. public spaces and amenities;
X
)<
6. areas to be designated as conservation areas and/or preservation areas;
X
7. conceptual stormwater detention facility locations;
X
8. conceptual grading;
X
K. Other special studies or documentation, if applicable, and any other information
identified as necessary by the county on the pre -application comment form:
• Trip Generation Estimates for proposed use(s)
1�
• (please see corresponding Pre -Application Meeting Memo dated 11/8 for
complete details regarding the information that must be submitted with the
Special Use Permit application)
Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit.
(SEE PAGE 2 of 2 — OVER)
SPECIAL USE PERMIT CHECKLIST Page 1 of 2
Read and Sign
I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on
this checklist ired for application.
ignat a of person completing t s checkl
Print Name
z / O z�
Date
y-3 q -/ 5 & o
Daytime phone number of Signatory
SPECIAL USE PERMIT CHECKLIST Page 2 of 2