Loading...
HomeMy WebLinkAboutSP202000005 SP Checklist 2020-03-03SPECIAL USE PERMIT APPLICATION CHECKLIST for "Ivy Proper" — TMPs #58A2-14 and #58A2-20 Completed by: After the mandatory pre -application meeting, County staff will mark this checklist TMP appropriately so that it is clear to the applicant which information specified in 11/8/19 Zoning Ordinance Section 33.33 must be submitted with the official application. Required for Provided with application? application (County Staff) (Applicant) X X ZONING ORDINANCE SECTION 33.33: YES NO X )( A. A narrative of the project proposal, including its public need or benefit; X X B. A narrative of the proposed project's consistency with the Comprehensive Plan including the land use plan and the master plan for the applicable development area; X C. A narrative of the proposed project's impacts on public facilities and public �( infrastructure. X D. A narrative of the proposed project's impacts on environmental features. X Y, E. One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions. X X F. A conceptual plan showing, as applicable: X 1. the street network, including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; X 2. typical street cross -sections to show proportions, scale and streetscape/cross- sections/circulation; X 3. the general location of pedestrian and bicycle facilities; X 4. building envelopes and parking envelopes; X 5. public spaces and amenities; X )< 6. areas to be designated as conservation areas and/or preservation areas; X 7. conceptual stormwater detention facility locations; X 8. conceptual grading; X K. Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form: • Trip Generation Estimates for proposed use(s) 1� • (please see corresponding Pre -Application Meeting Memo dated 11/8 for complete details regarding the information that must be submitted with the Special Use Permit application) Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. (SEE PAGE 2 of 2 — OVER) SPECIAL USE PERMIT CHECKLIST Page 1 of 2 Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist ired for application. ignat a of person completing t s checkl Print Name z / O z� Date y-3 q -/ 5 & o Daytime phone number of Signatory SPECIAL USE PERMIT CHECKLIST Page 2 of 2