Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SP202000005 Study 2020-03-04
S? 2oao - ocoo 5 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 `+3 z5 `-15 (o b Phone (434) 296-5832 Fax (434) 972-4126 PUBLIC WATER / SEWER CONNECTION EVALUATION THIS SECTION IS TO BE COMPLETED BY THE ALBEMARLE COUNTY SERVICE AUTHORITY ENGINEERING DIVISION 1. Distance to public water connection: 2. Access across adjoining property will / will not be required: 3. Distance to public sewer connection: 4. Access across adjoining property will / will not be required: COMMENTS: SIGNATURE: A.C.S.A. THIS SECTION IS TO BE COMPLETED BY THE PROPERTY OWNER 1. Provide contractor's written estimates. S e,-- a-`kGC-� 2. Estimated cost to install a well and associated electrical and plumbing equipment: rn� J 3. Estimated cost to install a water line for public connection (do not include ACSA fees): ��� 72s (QM01 mod' o© a 4. Estimated cost to install a septic system: �~ S l E q a 5. Estimated cost to install a sewer line for public connection: 5fwe-r Go�tr�cr� rU�Y 4V4►1q��+Z. THIS SECTION IS TO BE COMPLETED BY THE AGENT Connection to public water will / will not be required: Connection to public sewer will / will not be required: Signature: 5/19/06 TO: FROM: FOSTER WELL & PUMP COMPANY, INC. P.O. Box 260 Earlysville, Virginia 22936 (434)973-9079 Fax (434)973-8838 REID MURPHY DATE: SHANE FOSTER RE: PROPOSAL FEBRUARY 24, 2020 NEW WELL PRICING Listed below you will find the costs for drilling a 305' well and hooking it up to the office building. Drilling $11.00/ft PVC casing $8.00/ft Well cap $45.00 IIIB 50' grout $900.00 305' of drilling, III) 50' grout, 52' of PVC casing, well cap $4,716.00 Pump job for a 305' well $3,105.00 -3/4 horse power Franklin Electric motor, 10 gallon per minute Franklin Electric pump end, 275' of 1" poly pipe in the well, 280' of 12/2 flat wire with ground in the well, 1" pitless adapter, 100' of ditch to the house, 100' of 1" poly pipe in the ditch to the house, 120' of 12/2 of wire with ground in the ditch to the house, 44 gallon Well X-Trol pressure tank with kit, miscellaneous plumbing and electrical material, labor Total job cost for 305' IIIB well $7,821.00 We appreciate the opportunity to price this work. If you have any questions you can contact me at (434)973-9079. Thank you, Albemarle County Service Authority Ivy Water Main Extension Project Construction Cost Estimate - 100% Design Submittal Item No. Item Estimated Unit Unit Price Item Amount Quantities 1 Mobilization I $26,000.00 $26,000.00 Sump 2 18" Steel Casing Pipe 96 LF $1,350.00 $129,600.00 3 6" Class 52 Ductile Iron Water Main 819 LF $140.00 $114,660.00 4 4" Class 53 Ductile Iron Water Main 569 LF $100.00 $56,900.00 5 1" Water Service Connection (WSCB) 6 EA $750.00 $4,500.00 6 1.5" Water Service Connection 2 EA $750.00 $1,500.00 (WSCB) 7 1" Copper Pipe 258 LF $45.00 $11,610.00 8 1.5" Copper Pipe 19 LF $55.00 $1,045.00 9 2" Copper Pipe 14 LF $65.00 $910.00 10 Meter Box and 1" Setter 3 EA $1,700.00 $5,100.00 11 Meter Box and 5/8" Setter 3 EA $1,500.00 $4,500.00 12 Pressure Reducing Valve and Meter 6 EA $1,900.00 $11,400.00 o 13 1" Polyethylene Pipe (PE) 1,300 LF $35.00 $45,500.00 14 Dia. Gate Valve with Valve 5 EA $2,800.00 $14,000.00 Box 15 4-inch Dia. Gate Valve with Valve 5 EA $2,200.00 $11,000.00 16 Type A Blow -off Assembly 1 EA $3,100.00 $3,100.00 17 Fire Hydrant Assembly 2 EA $3,100.00 $6,200.00 N:\46480-017\Engineering\Cost_Est\100% Cost Estimate 2016-11-28.xls Page 1 of 11/28/2016 Item No. Item Estimated Unit Unit Price Item Amount Quantities 18 Automatic Flushing Assembly 1 EA $2,500.00 $2,500.00 19 Base Stone Aggregate (21A or B) 63 CY $50.00 $3,150.00 20 Asphalt Concrete Base Pavement (BM 227 SY $150.00 $34,050.00 25.0) 21 Asphalt Concrete Surface Course 1,064 SY $50.00 $53,200.00 (VDOT SM-9.5A) 22 Additional Unclassified Excavation 20 CY $40.00 $800.00 Ordered by the Engineer or Inspector 23 Additional Concrete - as Directed by 20 CY $40.00 $800.00 the Engineer or Inspector 24 Additional Select Fill 20 CY $60.00 $1,200.00 25 Over -Excavation of Unsuitable Sub- 25 CY $60.00 $1,500.00 grade with Porous Refill TOTAL OF ALL ITEMS $544,725.00 Assumptions: 1. E&S measures, trenching, backfilling, final grading, testing, seeding, maintenance of trafffic, and incidental restoration included in unit prices for water main. 2. Easement acquisition costs not included. 3. Estimate based on 2016 dollars. 4. Abandonment of existing water supply wells not included. 5. Relocation of existing utilities, if required, is not included. N:\46480-017\Engineering\Cost_Est\100% Cost Estimate 2016-11-28.xls Page 2 of 11/28/2016 Easton Construction 4978 Richmond Rd. Keswick, VA 22947 Name / Address BMC Holding, LC c/o Tim Coutter 400Locust A— wr- Ste. 3 Charlottesville, VA 22902 �Wp y3`� -.11 SL)' Estimate Date Estimate # 1,2/27/29-18 1 110 Project Description. Qty Rate Total Sewage Disposal System Installation Estimate for TM 58A2-14, 58A2-20 TBD Ivy Rd., Charlottesville, VA 22903 per Old Dominion Engineering Design Specs dataed November 19, 2018 Complete installation of drainfield per ODE Design specs ( includes 1 59,929.23 59,929.23 all Mbor and materials) * MATERIAL'S INCLIJDE TRAFFIC RATED TANKS IN PARKING AREA AND ROCK DUST USED FOR BACKFILL AROUND TANKS TO ENSURE A PROPER COMPACTION ** ELECTRICAL IS TO BE BROUGHT TO SUB PANEL LOCATION BY BUILDER *** ROCKIWATER CLAUSE - I€rack or ymnd water is discovered, all work will slap and it will be discussed with the Owner as to what steps need to, take piave to remove the rock or work arwnd the ground water. Any additional cast incurred from removal of rock and working with ground water will be the responsibility of the Owner and is not included in this estimate. VA Contractors License No.: 2705071284 VA Master Alternative waterworks No.: 1944001155 Total $59,929.23 4V3y' �o ��sa S.33