Loading...
HomeMy WebLinkAboutARB201900160 Review Comments 2020-01-08After viewing the location of the Block 1A proposal and other projects already reviewed in the development, it was the consensus of the ARB that ARB review was not required. c. ARB-2019-160: Albemarle High School Metal Panels Staff Contact: Khris Taggart Following staff's overview of the proposal noting the limited extent of the additional metal, and after confirming that the metal would match that which was already installed, the ARB agreed that staff level review of the application was appropriate. d. Minutes Approval: December 16, 2019 Motion: Mr. Stoner moved to approve the December 16, 2019 meeting minutes. Mr. Van Der Werf seconded the motion. The motion was carried by a vote of 3:0 (Hancock absent) e. Next ARB Meeting: Tuesday, January 21, 2020 ADJOURNMENT The meeting was adjourned at 2:45 p.m. to the next ARB meeting on Tuesday, January 21, 2020 in Lane Auditorium, Second Floor, County Office Building at 1:00 p.m. Stan Binsted, Chair Recorded and transcribed by Carolyn Shaffer, Clerk Albemarle County Architectural Review Board FINAL Action Memo Minutes January 6, 2020 6