Loading...
HomeMy WebLinkAboutWPO201900065 Review Comments WPO VSMP 2020-03-07COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan Review Project title: VSMP Plan for Darden Towe Park Paving Improvements Project file number: WP02019-00065 Plan preparer: Matt Harrell, Kimley Horn Associates — matt.harrell(cbkimley-horn.com Owner or rep.: City of Charlottesville and County of Albemarle Steve Hoffmann, FES / shoffinann(a)albemarle.org Plan received date: 8 Nov 2019 (Rev. 1) 27 Jan 2020 Date of comments: 9 Dec 2019 (Rev. 1) 7 Mar 2020 — Approved pending purchase 0.4 lb. phosphorus nutrient credits. Reviewer: J. Anderson County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved pending purchase of 0.4 lb. phosphorus nutrient credits. Note: A single slight revision (several occurrences of Chesterfield County, CE-102, Notes ES-5, ES-6); otherwise, this VSMP plan is approved pending purchase of 0.4 lb. phosphorus nutrient credits. Need Owner signature on SWPPP Registration Statement; will obtain 9-Mar 2020. A. Stormwater Pollution Prevention Plan (SWPPP) — Addressed, except item 3; will address 9-Mar. The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Revise SWPPP cover to include ref. to WP0201900065. 2. Sec. 1 /Registration Statement: Sec. IV, C. Property owner status: Revise to public. 3. Sec. 1 /Registration Statement: Sec. VI, Certification: please sign /date. (Rev. 1) Persists. Engineering will obtain signature on 9-Mar 2020. 4. Sec. 3, Nature ofActivity Revise to include project description from CE-102. 5. Sec. 4/5: Relocate I I" x 14" ESC /SWM SWPPP inserts, p. 34-41/.PDF, to this point, to precede Sec. 6. 6. Sec. 6.E. — List a named individual responsible for pollution prevention practices. KHA personnel may be listed until contractor selected. 7. Sec. 6.F. — Expand on `Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows' beyond what is so far provided. For example (from unrelated SWPPP), c.nvv.v�l (detail removed with Rev. 1 comments): 8. Sec. 8, Qualified Personnel: Similar to 6E, list a named individual. Engineering cannot approve a SWPPP, VSMP plan, or issue a Grading Permit unless this section is complete. 9. Sec. 9, Signed Certification: Complete / sign and date. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Ref. Items 6.E., 6.F. (items 5, 6, above). (Rev 1) Addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, but please see item 8, below (slight edit required). Engineering Review Comments Page 2 of 2 1. Revise plan title to include ref. to WPO20190006�. (Rev. 1) Addressed. 2. Revise CV-101, CV-102 sheet titles to include `Existing Conditions. (Rev. 1) Addressed. CE-100: 3. Label parking lots, and material surface type. (Rev. 1) Addressed. 4. Recommend denote center drive aisle for construction traffic. (Rev. 1) Addressed. 5. In project site vicinity map, label Elk Drive (entrance to Darden Towe Park), Fontana Drive, Stony Point Road (Rt. 20), etc. (Rev. 1) Addressed. 6. Show water protection ordinance buffer on at least one sheet —proximity to stream buffer should not affect design, but should be shown. Ref image, below [blue circle: project location [image removed w/ Rev. 1]: (Rev. 1) Addressed. 7. CE-101, Inset A: Show initial location of portable sanitary facilities and rain gauge. (Rev. 1) Addressed. 8. CE-102: Delete reference to Chesterfield County (see General ESC Notes, 2). (Rev. 1) Partially addressed. Please edit /revise occurrences of Chesterfield County, CE-102, Notes ES-5, ES-6. 9. CS-101: Revise sheet title to site layout. VSMP Plan cannot approve a site plan. (Rev. 1) Addressed. 10. CS-501, Light Duty Pavement: confirm graded base aggregate base material label is to appear twice in this detail, rather than compacted subgrade. (Rev. 1) Addressed. 11. CG-201: Add similar language to reference to paragraph D (9VAC25-870-66), sheet flow, listed with point of analysis 1, to point of analysis 2, since only project -related runoff from improvements near the pavilion (upstream of POA 2) is sheet flow. (Rev. 1) Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. CG-101: 1. Label ESC `eels' (ESC measures). (Rev. 1) Addressed. Included in ESC legend (950 LF). 2. Clarify that invert out (377.82) is a proposed drainage outlet pipe for the existing water fountain near the pavilion. It is not a storm water outfall, or conveyance. (Rev. 1) Addressed. Applicant response: `As discussed, the 10-year peak runoff has been calculated as 0.16 cfs at the outfall by the dog park. The conserved open space details and level spreader details are provided on Sheet CG-102. The ELS [engineered level spreader ] is proposed to be a length of 2.Oft. see CG-101.' KHA: Please revise CE-102 as outlined in SWMP comment 8, above. Then, please submit two additional complete (revised) full-size print plan sets; also, please submit 2 additional CE-102 sheets (Engineering glad to slip sheet). Prncess� After approval, the County can hold a pre -construction conference. Applicants must complete the request for a pre - construction conference form. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hLtp://www.albemarle.ora/deptforms.asp?department--cdengMo WPO201900065 Darden Towe Park Pave Improve 030720rev1