Loading...
HomeMy WebLinkAboutSUB201700046 Bond Reduction 2020-03-09John Anderson From: John Anderson Sent: Monday, March 9, 2020 4:08 PM To: Gregg P. O'Donnell; John A. Kessler Cc: Matthew Wentland; Kauppila, Joel; michael@chimp-engineering.com; Justin Shimp Subject: Planning Application Review for SUB201700046 Chesterfield Landing II - Road Plans. [ Engineering review - Road Plan bond release request ] Attachments: RE: SUB201700046 Chesterfield Landing Ph 2; SKM_364e-En20030913510.pdf The Review for the following application has been completed: Application Number = SUB201700046 Reviewer = John Anderson Review Status = Denied Completed Date = 03/09/2020 This email was sent from County View Production. Gregg, John Additional road plan bond reduction is not possible until VDOT accepts Chesterfield Landing, Phase II, Oxbow Drive, into the State Secondary System of highways. Please note Attached: Attachment 1: email, Matt Wentland, 3/9/2020 2:30 PM ( with Attachments) Attachment 2: 10-Oct 2019 correspondence (also included with above) + line -by-line road plan bond reduction (bond reduced, fall, 2019) The road plan has been reduced the maximum 80% for virtually every line item. Looking ahead, for final Chesterfield Landing Phase II road plan bond release: • VDOT acceptance is required prior to bond release. Please confirm status of VDOT punchlist (acceptance) items. For example: is base asphalt repaired (sections were identified required to be repaired, or replaced). • Please confirm surface asphalt has been placed on Oxbow Drive (all portions of Oxbow Drive included with SUB201700046, Chesterfield Landing, Phase II). Provide surface asphalt inspection reports (depth of asphalt consistent with design ). • Provide developer certification of completion, unless submitted in Sep, 2019 —link to form: http://www.albemarle.org/upload/images/forms_center/departments/Community Development/forms/Engineering_and _WPO_Forms/Road Inspections_& Acceptance- Certificate of Completion_for Subdivision _03-16-09.pdf . • Provide update on Developer Agreement with Albemarle County to maintain sidewalks outside VDOT right-of-way. • Note I: Albemarle Planning Division will present board agenda item in May, 2020, requesting board approval of VDOT-Albemarle Agreement; i.e., that county will maintain walks outside VDOT right-of-way. • Note2: Albemarle in turn must execute Agreement with developer (SM Charlottesville) that developer will maintain sidewalks outside VDOT right of way, as Albemarle will not maintain them. Please update Engineering re. status of Sidewalk Maintenance Agreement between county and developer. Please also see 10-Oct 2019 correspondence (Attached). Although denied (no further reduction possible at this time, unless surface asphalt placed —to be checked later this week; to be accompanied by inspection reports), no additional bond reduction inspection request fee is required to release the bond. Please help us with bullet items, above. Thanks for your help and patience. best, J. Anderson 434.296-5832 -3069