HomeMy WebLinkAboutZMA201800005 Review Comments 2018-06-18 (2) PROJECT NARRATIVE— Zoning Map Amendment
June 18th, 2018
•
Revised September 4,2018
1628 STATE FARM BOULEVARD
CHARLOTTESVILLE,VA 22911
07800-00-00-6500
07800-00-00-6400
PROJECT PROPOSAL
The proposed 130 Room Hotel (Hilton Franchise-Hampton Inn, six (6) story—74' ± in height) lies in the
Pantops Mixed Use District as well as the Neighborhood Model District (NMD).The hotel helps mitigate
demand for rooms generated by the expanding Sentara Martha Jefferson Hospital, The University of
Virginia, and numerous surrounding historical sites and attractions. It is important to note that there has
not been a new hotel built in the Pantops area since the Hilton Garden Inn on or about 2005.
We have addressed the requirements of the NMD by removing all but drop off and ADA parking along the
front elevation. We placed the building as close as possible to the sidewalk, without creating an alley
affect, given the height of the building. The proposed Zoning Map Amendment provides inter-parcel
connectivity as well as-pedestrian connectivity leading to and from the entrance of the hotel to the
sidewalk along State Farm Boulevard, leading both to the East and the West. Architecturally,the building
is designed on all four sides to provide a human scale and a residential aesthetic.
CONSITSTENCY WITH COMPREHENSIVE PLAN
The hotel use is a by right use in the PD-MC Zoning District.
IMPACT ON PUBLIC FACILITIES&PUBLIC INFRASTRUCTURE
There is no proposed impact on sewer or water. Based on the result of the Traffic Impact Analysis by
Ramey Kemp&Associates, Inc., a 100'taper is being proposed at the north entrance.
IMPACT ON ENVIORNMENTAL FEATURE
The proposed project impacts managed steep slopes on the site.We are mitigating the impact by reducing
the number of parking spaces as well as the use of retaining walls.
PROPOSED PROFFERS TO ADDRESS IMPACT
The owner will reserve an easement over the northern 2.0 acres(final area to be determined at site plan).
At time of certificate of occupancy,owner will transfer property to County for a future park.
MODIFICATIONS REQUEST
1. The proposed hotel has no stepbacks in the building architecture
2. The minimum front building setback shall be 10'to porte cochere
3. The maximum front building setback shall be 35'to porte cochere
B28 Blackwell Park Lane,Suite 201 O H L E R Warrenton,VA 20186
PHONE 540.349.4500
ENGINEERING •
September 4,2018
Via Hand Delivery
Albemarle County
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,VA 22902-4596
Attn: Tim Padalino,AICP
Re: ZMA-2018-00005
Zoning Map Amendment — ls` Review
Response
PT Hotel,LLC
1628 State Farm Boulevard
Charlottesville,VA 22911
Albemarle County
BE#V172065
Dear Mr. Padalino:
Bohler Engineering is pleased to submit on behalf of Shamin Hotels, the Zoning Map Amendment 2nd
Submission for the PT Hotel, LLC Project in Charlottesville, Virginia. The following is our comment
response letter addressing comments received from various departments dated August 3, 2018. Each
comment is addressed and responded to as follows:
Additional Planning Comments:
Comment 1: Stepbacks: A front stepback is required for the proposed structure per County Code
Chapter 18 ("Zoning Ordinance") Sections 25A.6, 21.4, and 4.20(a); however, no
stepback is shown, annotated, or otherwise described or identified on any of the
application materials. More specifically,the proposed building height of sixty(60)feet is
permissible; however, County Code Chapter 18 ("Zoning Ordinance") Sections 25A.6,
21.4, and 4.20(a)require that the structure have a minimum front stepback of fifteen(15)
feet beginning with the fourth floor or any story beginning at a height more than forty
(40)feet above ground level,whichever is less,unless a different regulation is established
by the ZMA application plan.
With the submittal of this ZMA application plan, you have the ability [pursuant to Z.O.
Section 4.20(a)(6)] to propose different stepback parameters for the structure(s) on the
subject property(s) which, if approved, would replace the stepback requirements that are
otherwise established by Zoning Ordinance Sections referenced above.
However, as noted above, no such information is provided to demonstrate compliance
with the applicable stepback requirements; and no such modification or deviation from
the stepback requirements established by County Code are explicitly requested with this
ZMA proposal.
Therefore,the proposal should be revised and resubmitted(either by complying with the
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
• B O H L'E R Tim Padalino,AICP
' ENGINEERING PT Hotels,LLC
Zoning Map Amendment 1"Review Comments
September 4,2018
Page 2 of 4
stepback requirements, or by proposing to establish an alternative stepback requirement)
prior to being taken to the Planning Commission for a public hearing.
Response 1: The applicant is requesting that no stepback be required for the hotel.
Comment 2: Setbacks: The proposed primary structure is subject to minimum setback requirements
and maximum setback requirements per Zoning Ordinance Sections 25A.6, 21.4, and
4.20(a).
The proposal appears to comply with the applicable minimum setback requirements ("10
feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside
of the rightof-way;for off-street parking or loading spaces, 10 feet from any public street
right-of-way."). However, the proposal appears to not comply with the applicable
maximum setback requirements ("30 feet from the right-of-way or the exterior edge of
the sidewalk if the sidewalk is outside of the right-of-way...").
With the submittal of this ZMA application plan, you have the ability [pursuant to Z.O.
Section 4.20(a)(6)] to propose different setback parameters for the structure(s) on the
subject property(s) which, if approved, would replace the setback requirements that are
otherwise established by Zoning Ordinance Sections referenced above.
However, as noted above, it appears that the location of the building footprint relative to
the front property boundary appears to not comply with the applicable maximum setback
requirements; and no such modification or deviation from the applicable maximum
setback requirements established by County Code are explicitly requested with this ZMA
proposal.
Therefore, the proposal should be revised and resubmitted (either by complying with the
setback requirements, or by proposing to establish alternative minimum and/or maximum
setback requirements) prior to being taken to the Planning Commission for a public
hearing.
Response 2: The applicant is requesting a minimum building setback of 10' and a maximum
building setback of 35' to the porte cochere.
Comment 3: Viewshed and Visibility: The proposed hotel's height(60')and location(topographically
prominent site) create concerns about impacts to viewsheds from State Farm Boulevard
and from other locations in Pantops, as well as potential impacts to the viewshed from
Monticello.
Staff strongly recommend that this proposal include direct coordination with the Thomas
Jefferson Foundation to understand what concerns (if any) the Foundation has, and to
discuss potential mitigation techniques (as may be applicable). Any coordination with the
Thomas Jefferson Foundation should occur with Ms. Liz Russell at
lrussell@monticello.org
Staff also request and strongly recommend that the applicants provide some type of
visual analysis of the proposed hotel (as viewed from multiple locations along State Farm
Boulevard, and as viewed from multiple locations within the Pantops neighborhood), as
requested by members of the Pantops Community Advisory Committee during the
community meeting on 7/23/2018. This type of visual information would be very helpful
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
•
• F B O H L E R Tim Padalino,AICP
ENGINEERING
PT Hotels,LLC
Zoning Map Amendment I"Review Comments
September 4,2018
Page 3 of 4
in the County's evaluation of this proposal, and specifically in determining the
appropriateness of the proposed height,massing, and location.
Response 3: Coordination is ongoing with Liz Russell at the Thomas Jefferson Foundation and
elevations/renderings will be submitted under separate cover.
Comment 4: Review Process: Staff believes the questions, issues, and concerns identified in this
comment letter should be addressed through revision and resubmittal of the proposed
application plan and project narrative, to demonstrate compliance with County Code
requirements or to otherwise demonstrate a commitment to addressing and mitigating the
potential impacts associated with these questions, issues,or concerns.
Response 4: Comment noted.
Comment 5: (Advisory) Additional Future Permitting Requirements: If this ZMA application is
approved, the proposed hotel development would be subject to approval of a Site Plan
and Water Protection Ordinance(WPO)Plan/VSMP Plan.
Response 5: Comment noted.
Engineering-Frank Pohl,P.E.,C.F.M:
The County Engineer has indicated that these review comments can be addressed at the site plan and
VSMP review process.
Comment 1: VSMP permitting will be required [through the preparation and submittal of a Water
Protection Ordinance (WPO) Plan application, separate from the Site Development Plan
application].
Response 1: Comment noted.
Comment 2: Consider discharging stormwater at one of the rear corners to avoid piping under 4
retaining walls.
Response 2: Comment noted.
Comment 3: Consider providing interparcel connection to TMP 78-63.
Response 3: An interparcel connection has been provided to the western property line(Lot 6).
Albemarle County Fire&Rescue-Marshall Shawn Maddox
Comment 1: VSMP permitting will be required [through the preparation and submittal of a Water
Protection Ordinance (WPO) Plan application, separate from the Site Development Plan
application].
Response 1: Comment noted.
Comment 2: Consider discharging stormwater at one of the rear corners to avoid piping under 4
retaining walls.
Response 2: Comment noted.
Comment 3: Consider providing interparcel connection to TMP 78-63.
Response 3: An interparcel connection has been provided to the western property line(Lot 6).
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
• B O H L E R Tim Padalino,AICP
ENGINEERING PT Hotels,LLC
Zoning Map Amendment 1s1 Review Comments
September 4,2018
Page 4 of 4
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at(540) 349-4500.
Sincerely,
Bohler Engineering VA,LLC
atilLieto
C. Wright,P.E.
JCW/bb
H:\17\V172O65Wdministrative\Letters\180904 ZMA 1st Review CRL.doc
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
PROJECT NARRATIVE — Zoning Map Amendment
June 18th, 2018
Revised September 4, 2018
1628 STATE FARM BOULEVARD
CHARLOTTESVILLE,VA 22911
07800-00-00-6500
07800-00-00-6400
PROJECT PROPOSAL
The proposed 130 Room Hotel (Hilton Franchise-Hampton Inn, six (6) story—74' ± in height) lies in the
Pantops Mixed Use District as well as the Neighborhood Model District (NMD). The hotel helps mitigate
demand for rooms generated by the expanding Sentara Martha Jefferson Hospital, The University of
Virginia, and numerous surrounding historical sites and attractions. It is important to note that there has
not been a new hotel built in the Pantops area since the Hilton Garden Inn on or about 2005.
We have addressed the requirements of the NMD by removing all but drop off and ADA parking along the
front elevation. We placed the building as close as possible to the sidewalk, without creating an alley
affect, given the height of the building. The proposed Zoning Map Amendment provides inter-parcel
connectivity as well as pedestrian connectivity leading to and from the entrance of the hotel to the
sidewalk along State Farm Boulevard, leading both to the East and the West. Architecturally,the building
is designed on all four sides to provide a human scale and a residential aesthetic.
CONSITSTENCY WITH COMPREHENSIVE PLAN
The hotel use is a by right use in the PD-MC Zoning District.
IMPACT ON PUBLIC FACILITIES&PUBLIC INFRASTRUCTURE
There is no proposed impact on sewer or water. Based on the result of the Traffic Impact Analysis by
Ramey Kemp&Associates, Inc., a 100'taper is being proposed at the north entrance.
IMPACT ON ENVIORNMENTAL FEATURE
The proposed project impacts managed steep slopes on the site.We are mitigating the impact by reducing
the number of parking spaces as well as the use of retaining walls.
PROPOSED PROFFERS TO ADDRESS IMPACT
The owner will reserve an easement over the northern 2.0 acres(final area to be determined at site plan).
At time of certificate of occupancy,owner will transfer property to County for a future park.
MODIFICATIONS REQUEST
1. The proposed hotel has no stepbacks in the building architecture
2. The minimum front building setback shall be 10'to porte cochere
3. The maximum front building setback shall be 35'to porte cochere
nm
u T F 28 Blackwell Park Lane,Suite 201
Warrenton,VA 20186
PHONE 540.349.4500.4500
ENGINEERING
September 4,2018
Via Hand Delivery
Albemarle County
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,VA 22902-4596
Attn: Tim Padalino,AICP
Re: ZMA-2018-00005
Zoning Map Amendment — 1st Review
Response
PT Hotel,LLC
1628 State Farm Boulevard
Charlottesville,VA 22911
Albemarle County
BE#V172065
Dear Mr.Padalino:
Bohler Engineering is pleased to submit on behalf of Shamin Hotels, the Zoning Map Amendment 2nd
Submission for the PT Hotel, LLC Project in Charlottesville, Virginia. The following is our comment
response letter addressing comments received from various departments dated August 3, 2018. Each
comment is addressed and responded to as follows:
Additional.Planning Comments:
Comment 1: Stepbacks: A front stepback is required for the proposed structure per County Code
Chapter 18 ("Zoning Ordinance") Sections 25A.6, 21.4, and 4.20(a); however, no
stepback is shown, annotated, or otherwise described or identified on any of the
application materials. More specifically, the proposed building height of sixty(60) feet is
permissible; however, County Code Chapter 18 ("Zoning Ordinance") Sections 25A.6,
21.4, and 4.20(a) require that the structure have a minimum front stepback of fifteen(15)
feet beginning with the fourth floor or any story beginning at a height more than forty
(40)feet above ground level,whichever is less,unless a different regulation is established
by the ZMA application plan.
With the submittal of this ZMA application plan, you have the ability [pursuant to Z.O.
Section 4.20(a)(6)] to propose different stepback parameters for the structure(s) on the
subject property(s) which, if approved, would replace the stepback requirements that are
otherwise established by Zoning Ordinance Sections referenced above.
However, as noted above, no such information is provided to demonstrate compliance
with the applicable stepback requirements; and no such modification or deviation from
the stepback requirements established by County Code are explicitly requested with this
ZMA proposal.
Therefore,the proposal should be revised and resubmitted(either by complying with the
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERI NG.COM
•
B ®H L E R Tim Padalino,AICP
ENGINEERING PT Hotels LLC
Zoning Map Amendment 1st Review Comments
September 4,2018
Page 2 of 4
stepback requirements, or by proposing to establish an alternative stepback requirement)
prior to being taken to the Planning Commission for a public hearing.
Response 1: The applicant is requesting that no stepback be required for the hotel.
Comment 2: Setbacks: The proposed primary structure is subject to minimum setback requirements
and maximum setback requirements per Zoning Ordinance Sections 25A.6, 21.4, and
4.20(a).
The proposal appears to comply with the applicable minimum setback requirements ("10
feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside
of the rightof-way;for off-street parking or loading spaces, 10 feet from any public street
right-of-way."). However, the proposal appears to not comply with the applicable
maximum setback requirements ("30 feet from the right-of-way or the exterior edge a of
the sidewalk if the sidewalk is outside of the right-of-way...").
With the submittal of this ZMA"application plan, you have the ability [pursuant to Z.O.
Section 4.20(a)(6)] to propose different setback parameters for the structure(s) on the
subject property(s) which, if approved, would replace the setback requirements that are
otherwise established by Zoning Ordinance Sections referenced above.
However, as noted above, it appears that the location of the building footprint relative to
the front property boundary appears to not comply with the applicable maximum setback
requirements; and no such modification or deviation from the applicable maximum
setback requirements established by County Code are explicitly requested with this ZMA
proposal.
Therefore, the proposal should be revised and resubmitted(either by complying with the
setback requirements, or by proposing to establish alternative minimum and/or maximum
setback requirements) prior to being taken to the Planning Commission for a public
hearing.
Response 2: The applicant is requesting a minimum building setback of 10' and a maximum
building setback of 35' to the porte cochere.
Comment 3: Viewshed and Visibility: The proposed hotel's height(60')and location(topographically
prominent site) create concerns about impacts to viewsheds from State Farm Boulevard
and from other locations in Pantops, as well as potential impacts to the viewshed from
Monticello.
Staff strongly recommend that this proposal include direct coordination with the Thomas
Jefferson Foundation to understand what concerns (if any) the Foundation has, and to
discuss potential mitigation techniques (as may be applicable). Any coordination with the
Thomas Jefferson Foundation should occur with Ms. Liz Russell at
lrussell@monticello.org
Staff also request and strongly recommend that the applicants provide some type of
visual analysis of the proposed hotel (as viewed from multiple locations along State Farm
Boulevard, and as viewed from multiple locations within the Pantops neighborhood), as
requested by members of the Pantops Community Advisory Committee during the
community meeting on 7/23/2018. This type of visual information would be very helpful
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
roB O H L E R Tim Padalino,AICP
ENGINEERING PT Hotels,LLC
Zoning Map Amendment 1"Review Comments
September 4,2018
Page 3 of 4
in the County's evaluation of this proposal, and specifically in determining the
appropriateness of the proposed height,massing, and location.
Response 3: Coordination is ongoing with Liz Russell at the Thomas Jefferson Foundation and
elevations/renderings will be submitted under separate cover.
Comment 4: Review Process: Staff believes the questions, issues, and concerns identified in this
comment letter should be addressed through revision and resubmittal of the proposed
application plan and project narrative, to demonstrate compliance with County Code
requirements or to otherwise demonstrate a commitment to addressing and mitigating the
potential impacts associated with these questions, issues,or concerns.
Response 4: Comment noted.
Comment 5: (Advisory) Additional Future Permitting Requirements: If this ZMA application is
approved, the proposed hotel development would be subject to approval of a Site Plan
and Water Protection Ordinance(WPO)Plan/VSMP Plan.
Response 5: Comment noted.
Engineering-Frank Pohl,P.E., C.F.M:
The County Engineer has indicated that these review comments can be addressed at the site plan and
VSMP review process.
Comment 1: VSMP permitting will be required [through the preparation and submittal of a Water
Protection Ordinance (WPO) Plan application, separate from the Site Development Plan
application].
Response 1: Comment noted.
Comment 2: Consider discharging stormwater at one of the rear corners to avoid piping under 4
retaining walls.
Response 2: Comment noted.
Comment 3: Consider providing interparcel connection to TMP 78-63.
Response 3: An interparcel connection has been provided to the western property line(Lot 6).
Albemarle County Fire&Rescue-Marshall Shawn Maddox
Comment 1: VSMP permitting will be required [through the preparation and submittal of a Water
Protection Ordinance (WPO) Plan application, separate from the Site Development Plan
application].
Response 1: Comment noted.
Comment 2: Consider discharging stormwater at one of the rear corners to avoid piping under 4
retaining walls.
Response 2: Comment noted.
Comment 3: Consider providing interparcel connection to TMP 78-63.
Response 3: An interparcel connection has been provided to the western property line(Lot 6).
CIVIL AND CONSULTING ENGINEERS• PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
T.
' M
B O H L E R Tim Padalino,AICP
ENGINEERING PT Hotels,LLC
Zoning Map Amendment 1st Review Comments
September 4,2018
Page 4 of 4
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at(540) 349-4500.
Sincerely,
Bohler Engineering VA,LLC
I'', •
C. Wright,P.E.
JCW/bb
H:\17\V172065\Administrative\Letters\180904 ZMA 1st Review CRL.doc
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERI NG.COM