HomeMy WebLinkAboutSP201800011 Study 2019-03-06EPfOEPR� "ENGINEERING & PLANNING RESOURCES" S(, �' 9O2 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MEMORANDUM TO: JUSTIN SHIMP, P.E. ORGANIZATION: SHIMP ENGINEERING PHONE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT SUPPLEMENT FROM: BILL WUENSCH, P.E., PTOE; WEI HE DATE: MARCH 6, 2019 SENDER'S REFERENCE NUMBER: YOUR REFERENCE NUMBER: ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic assessment for the proposed Regents School Site. This document was performed to examine the impact of the proposed Regents School on Fontaine Avenue/Route 29 Southbound Ramp intersection assuming the school with the start time of 7:45 AM. To accomplish the goal, this analysis examined the future year 2028 conditions and assumed that all school trips arrived in the morning between 7:15-7:45AM. The no build and build conditions were analyzed as needed to compare future build conditions with future no build conditions. The future build conditions were also compared to the future build conditions from the prior Regents School Site Traffic Assessment (10/12/2018) which summarized the impact of the proposed Regents School on the AM peak hour. The following provides a brief summary of this information. Trip Generation The trip generation was obtained from the prior Regents School Site Traffic Assessment (10/12/2018) and summarized below. Table 1 Trip Generation Scenario 2028 AM 2028 PM 2038 AM 2038 PM In/Out Inbound Outbound Inbound Outbound Inbound Outbound Inbound Outbound Total Trips 100 63 45 72 200 127 91 143 EPRpc EPR, PrC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Traffic Volumes Existing Traffic Volumes The existing traffic counts were performed at Fontaine Avenue/Route 29 Southbound Ramp intersection on Thursday, February 7th, 2019, a typical weekday when no special events occurred. The traffic count document is attached. For analysis purposes, this effort examined the traffic volumes between 7:15-7:45AM and doubled the traffic volumes between 7:15-7:45AM for Synchro traffic analysis as needed for a design hour volume equivalent. Figure 1 illustrates the traffic volume calculation and the traffic volumes (hour) that were analyzed. Figure 1 Existing Traffic Volumes AM 29 SB 2 i 2 238 4-14 41 j y r 158 Fontaine 22 04 29 SB 2028 No Build Traffic Volumes EBT EBR WBL WBT SBL SOT SBR Total 7:15 4 3 34 4 55 0 0 100 • Vehicle 7:30 7 2 45 3 64 1 1 123 Total 1/2 Hour 11 5 79 7 119 1 1 223 Hour 22 10 158 14 238 2 2 446 PHF 0.91 Truck 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 05% 0% 14% 2% 100% 0% Also, growth rates from the prior Regents School Site Traffic Assessment (10/12/2018) were utilized for this analysis. Figure 2 illustrates the year 2028 no build traffic volume calculation. Figure 2 2028 No Build Traffic Volumes 2 4J Fontaine 29 SB 29 SB 14 192 EBT EBR WBL WBT SBL SET SBR Total 7:15 4 4 41 4 67 0 0 120 Vehicle 7:30 8 2 55 3 78 1 1 148 Total 1/2 Hour 12 6 96 7 145 1 1 268 Hour 24 12 192 14 290 2 2 536 PHF 0.91 Truck 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 0% 0% 14% 2% 100% 0% EPRpEPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E 1EFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Site Trip Distribution and Assignment Trip distribution was also obtained from the prior Regents School Site Traffic Assessment (10/12/2018). Figure 3 illustrates the assumed trip distribution. It should be noted that 2% of the trips were assumed from/to the local residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm. 3 Site Trip Distribution 29 SO M 0 0 «J t 4 29 SO 4-0 r 0 The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 with 230 students are summarized and doubled for Synchro traffic analysis as illustrated in Figure 4. Figure 4 2028 Site Trips 1 ! AM 29 S8 Fontaii 29 SO ■ r 0 2028 Build Traffic Volumes EBT EBR WBL WBT SOL SOT SBR Total 7:15 18 6 0 29 0 0 10 63 Vehicle 7:30 28 10 0 44 0 0 15 97 Total 1/2 Hour 46 16 00 0 00 160 Hour 92 32 0 146 0 O 50 320 PHF Truck 1/2 Hour 1 0 0 1 0 0 0 HVP Combining the background traffic with the site trips as shown, Figure 5 illustrates the build condition traffic volume calculation. EPR, P,C. "ENGINEERING & PLANNING RESOURCES" EpR ), 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Figure 5 2028 Build Traffic Volumes AM 29 SB EBT EBR WBL WBT SBL SB 52 2 29 J 4 4 Fontaine 29 SB ~ 160 T 192 T SBR Total 7:15 22 10 41 33 67 0 10 183 Vehicle 7:30 36 12 55 47 78 1 16 245 Total 112 Hour 58 22 96 80 145 1 26 428 Hour 116 44 192 160 290 2 52 856 PHE 0.87 Truck 1/2 Hour 2 0 0 2 2 1 0 HVP 3% 0% 0% 3% 1% 100% 0% Traffic Impact Assessment of the Proposed Regents School on 7:15-7:45AM The future year 2028 no build and build conditions were analyzed as needed to compare future build conditions with future no build conditions. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018), SimTraffic was utilized for the level of service, delay, and queue analyses. The following tables summarize the analysis results: Existing AM Existing AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/0.7 A/2.1 A/8.2 A Approach LOS/Delay A/0.7 A/2.1 A/8.2 5.3 Movement Queue 0 35 118 2028 No Build AM Year 2028 No Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/0.8 A/2.3 B/10.3 A Approach LOS/Delay A/0.8 A/2.3 B/10.3 6.6 Movement Queue 0 53 159 2028 Build AM Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.5 A/2.8 C/22.1 B Approach LOS/Delay A/1.5 A/2.8 C/22.1 10.4 Movement Queue 4 80 297 EPR, PAC. "ENGINEERING & PLANNING RESOURCES" EPRj902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Based on the analysis results, the traffic operation in the future year 2028 build conditions will be acceptable with the proposed Regents School with the start time of 7:45AM. The overall intersection level of service will be LOS B, the level of service for Fontaine Avenue will be at LOS A, and the level of service for Route 29 Southbound Ramp will be LOS C. The queue on Route 29 Southbound Ramp will be manageable at approximately 300 feet. Comparison to the Impact of the Proposed Regents School on the AM Peak Hour The future year 2028 no build and build conditions traffic analysis results were obtained from the prior Regents School Site Traffic Assessment (10/12/2018) for comparison purpose. The following tables summarize the analysis results from the prior Regents School Site Traffic Assessment (10/12/2018): Existing AM Existing AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.3 A/2.1 C/16.3 B Approach LOS/Delay A/1.3 A/2.1 C/16.3 11.1 Movement Queue 0 51 316 2028 No Build AM Year 2028 No Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.5 A/2.3 E/4SA D Approach LOS/Delay A/1.5 A/2.3 E/45.4 30.1 Movement Queue 4 57 > 500 2028 Build AM Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.7 A/2.7 F/115.7 F Approach LOS/Delay A/1.7 A/2.7 F/115.7 64.5 Movement Queue 8 73 > 500 Based on the results above, assuming the school start time at background traffic peak hour, in the future year 2028 build conditions, the overall intersection level of service will be a failing level of service LOS F, the level of service for the Fontaine Avenue approach will be at LOS A, and the level of service for Route 29 Southbound Ramp will be LOS F. The queue on Route 29 Southbound Ramp will spill back onto Route 29. Comparing the traffic impacts of the proposed Regents School on 7:15-7:45AM and on AM peak hour, the impact on 7:15-7:45AM is minor and manageable. EPR) 3 EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Findings Based on the analysis performed in this memorandum, the principal findings are as followings — 1. The traffic operations in the future year 2028 build conditions will be acceptable with the proposed Regents School with the start time of 7:45AM. The overall intersection level of service will be LOS B, the level of service for Fontaine Avenue will be at LOS A, and the level of service for Route 29 Southbound Ramp will be LOS C. The queue on Route 29 Southbound Ramp will be manageable at approximately 300 feet. 2. Assuming the school start time at during the background traffic peak hour (after 7:45AM), in the future year 2028 build conditions, the overall intersection level of service will be failing level of service LOS F, the level of service for Fontaine Avenue will be at LOS A, and the level of service for Rte 29 Southbound Ramp will be LOS F. The queue on Rte 29 Southbound Ramp will spill back onto Rte 29. 3. Comparing the traffic impacts of the proposed Regents School on 7:15-7:45AM and on AM peak hour, the impact on 7:15-7:45AM is minor and manageable. End of Memorandum - Attachment: Traffic Count Document 27 0f I )6 i k 11 l� 0 •0�0�00� v0000�ao Northbound