Traffic Volumes during School Peak Time
Traffic volumes during school peak time at 7:15AM-7:45AM were extrapolated based on the
02/07/2019 counts. Figure 1 illustrates the year 2038 no build traffic volumes. Figure 2
illustrates the new trips generated by the 460 students. Figure 3 illustrates the year 2038 build
traffic volumes.
Note —Synchro analyzes traffic performance in an hourly manner. For analysis purpose, traffic volumes
as shown in Figure 1, Figure 2, and Figure 3 are twice of the actual traffic volumes during 7:15AM-
7:45AM. These traffic volumes were applied as hourly volumes in Synchro to simulate the real traffic
performance at the study intersection.
Figure 12038 No Build Traffic Volumes
AM 29SB
EBT
EBR
WBL
WBT
SBL ISBT
SBR
7:15
4
4
50
4
82 0
0
144
4-16
r
2 2 3
7:30
8
3
67
4
95 1
1
179
1 3554
41 r
234
1/2 Hour
12
7
117
8
177 1
1
323
Vehicle
Fontaine
Total Hour
24
14
234
16
354 2
2
646
~
24
PHF
0.91
14
Truck 1/2 Hour
1
0
0
1
2 1
0
HVP
9%
0%
0%
14%
2% 100%
0%
29 SB
1
EPRijc
Figure 2 2038 Site Trips
AM 29 SR
EPR, PrC, ❑ENGINEERING ❑ PLANNING
902 E JEFFERSON ST. UNIT 101, CHARLOTTES❑ILLE, ❑A 22902
■ 0 0 ■
«1 i 4 r
Fontaine
186 ~
64
29 SB
Figure 3 2038 Build Traffic Volumes
AM 29 SB
102 2 354 ~ 308
ine
210 ~
78
29 SB
EBT
EBR
WBL WBT SBL
SBT SBR
7:15
37
13
0 58 0
0 20 128
7:30
56
19
0 88 0
0 30 193
1/2 Hour
93
32
0■ 0
0 ■ 321
Vehicle
Total
Hour
186
64
0 292 0
0 100 642
PHF
Truck
V2 Hour
1
0
0 1 0
0 0
HVP
EBT EBR WBL WBT SBL 'SBT SBR
7:15
41
17,
50 62 82
0 20 272
7:30
64
22,
67 92 95
1 31 372
1/2 Hour
105
39
117 154177
1 51 644
Vehicle
Total
Hour
210
78
234 308, 354
2 102 1288
PHF
0.87
Truck
1/2 Hour
2
0
0 2 2
1 0
HVP
2%
0%
0% 1% 1% 100%
0%
Traffic Volumes during Regular Peak Hour
Traffic volumes during regular peak hour at 7:45AM-8:45AM were obtained from the
02/07/2019 counts. Figure 4 illustrates the year 2018 existing traffic volumes. Figure 5
illustrates the year 2038 no build traffic volumes.
Ant
29 SB
F
32
r
418
67
r
164
Fontaine
~
43
18
29 SB
Figure 4 2018 Existing Traffic Volumes
Build Traffic Volumes
AM 295
43 v G77
*J 1 4
Fontaine
4;i ~
27
29 ,E
GG
r 244
Figure 5 2038 No
2
EPRp EPR, PAC. ❑ENGINEERING El PLANNING
902 E JEFFERSON ST. UNIT 101, CHARLOTTES❑ILLE, ❑A 22902
Traffic Results
Traffic performance (LOS, delay provided in seconds, and queue length provided in feet) was
analyzed and reported for the following scenarios -
1. 2038 School Peak Time (7:15AM-7:45AM) No Build AM;
2. 2038 School Peak Time (7:15AM-7:45AM) Build AM;
3. 2038 School Peak Time (7:15AM-7:45AM) Mitigation AM;
4. 2038 School Peak Time (7:15AM-7:45AM) Mitigation (WBL ONLY) AM;
5. 2038 Regular Peak Hour (7:45AM-8:45AM) No Build AM;
6. 2038 Regular Peak Hour (7:45AM-8:45AM) Mitigation AM.
1. 2038 School Peak Time (7:15AM-7:45AM) No Build AM
Movement/Approach
Fontaine EB
Year 2038 No Build AM (7:15-7:45)
Fontaine WB Rte 29 SB
EBT/R WBL/T SBL/T/R
Overall
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/0.9
A 2.5
/
B/13.0
q
Approach LOS/Delay
A/0.9
A/2.5
B/13.0
8.3
Movement Queue
0
53
193
2.2038 School Peak
Time (7:15AM-7:45AM)
Build AM
Year 2038 Build AM
(7:15-7:45)
Movement Approach
/
Fontaine EB
Fontaine WB
Rte 29 SB
EBT/R
WBL/T
SBL/T/R
Overall
1. Rte 29/Fontaine SB
Movement LOS/Delay
A/2.1
A/4.3
F/194.7
F
Approach LOS/Delay
A/2.1
A/4.3
F/194.7
63.9
Movement Queue
9
121
570
3.2038 School Peak Time (7:15AM-7:45AM) Mitigation AM
Year 2038 Mitigation AM (7:15-7:45)
Movement/Approach Fontaine EB Fontaine WB Rte 29 SB
EBT/R WBL WBT SBL/T SBR Overall
1. Rte 29/Fontaine SB Movement LOS/Delay A/2.2 A/3.6 A/1.1 F/116.4 A/5.3 D
Approach LOS/Delay A/2.2 A/2.2 F/91.7 33.7
Movement Queue 13 82 0 > 500 > 300
Mitigation includes exclusive southbound right turn lane and exclusive westbound left turn lane. Mitigation does
not include traffic signal control.
3
EPRPc EPR, P,C ❑ENGINEERING El PLANNING
902 E JEFFERSON ST. UNIT 101, CHARLOTTES❑ILLE, ❑A 22902
4.2038 School Peak Time (7:15AM-7:45AM) Mitigation (WBL ONLY) AM
Year 2038 Mitigation (WBL ONLY) AM (7:15-7:45)
Movement/Approach Fontaine EB Fontaine WB Rte 29 SB
EBT/R WBL WBT SBL/T Overall
1. Rte 29/Fontaine SB Movement LOS/Delay A/2.2 A/3.7 A/1.1 F/157.4 F
Approach LOS/Delay A/2.2 A/2.2 F/157.4 55.0
Movement Queue 16 84 4 > 500
In this scenario, mitigation includes exclusive westbound left turn lane only. Mitigation does not include exclusive
southbound right turn lane or traffic signal control.
S. 2038 Regular Peak Hour (7:45AM-8:45AM) No Build AM
Year 2038 No Build AM (7:45-8:45, Peak Hour)
Movement/Approach Fontaine EB Fontaine WB Rte 29 SB
EBT/R WBL/T SBL/T/R Overall
1. Rte 29/Fontaine SB Movement LOS/Delay A/1.6 A/2.9
F/118.0 F
Approach LOS/Delay A/1.6 A/2.9 F/118.0 70.8
Movement Queue 2 69 > 500
6. 2038 Regular Peak Hour (7:45AM-8:45AM) Mitigation AM
Year 2038 Mitigation AM (7:45-8:45, Peak Hour)
Fontaine EB Fontaine WB Rte 29 SB
Movement/Approach
EBT/R WBL WBT SBL/T SBR Overall
1. Rte 29/Fontaine SB Movement LOS/Delay A/1.6 A/2.2 A/1.6 F/111.1 A/4.6 F
Approach LOS/Delay A/1.6 A/2.1 F/103.5 64.5
Movement Queue 3 53 0 > 500 > 300
Mitigation includes exclusive southbound right turn lane and exclusive westbound left turn lane. Mitigation does
not include traffic signal control.
Based on the result tables as reported and summarized above -
• In year 2038 school peak time no build am scenario, the delay for SB is 13.0 sec (LOS B)
and the delay for the intersection is 8.3 sec (LOS A).
• In year 2038 school peak time build am scenario, the delay for SB is 194.7 sec (LOS F)
and the delay for the intersection is 63.9 sec (LOS F).
• In year 2038 school peak time mitigation am scenario (including exclusive southbound
right turn lane and exclusive westbound left turn lane), the delay for SB is 91.7 sec (LOS
F) and the delay for the intersection is 33.7 sec (LOS D).
• In year 2038 school peak time mitigation (WBL ONLY) am scenario (including exclusive
westbound left turn lane only), the delay for SB is 157.4 sec (LOS F) and the delay for the
intersection is 55.0 sec (LOS F).
4
, EPR, PAC, ❑ENGINEERING ❑ PLANNING
EPR-)(I 9O2 E JEFFERSON ST. UNIT 101, CHARLOTTESDILLE, ❑A 22902
• In year 2038 regular peak hour no build am scenario, the delay for SB is 118.0 sec (LOS
F) and the delay for the intersection is 70.8 sec (LOS F).
• In year 2038 regular peak hour mitigation am scenario (including exclusive southbound
right turn lane and exclusive westbound left turn lane), the delay for 56 is 103.5 sec (LOS
F) and the delay for the intersection is 64.5 sec (LOS F).
Findings and Conclusions
Comparing the results as summarized for the different scenarios, the findings and conclusions
of this memorandum are as followings —
• The mitigations of exclusive southbound right turn lane and exclusive westbound left
turn lane at the study intersection are critical to improve the traffic performance during
school peak time of 7:15AM-7:45AM after the school is built. With both exclusive turn
lanes, the SB delay could be shortened from 194.7 sec to 91.7 sec and the intersection
delay could be shortened from 63.9 sec to 33.7 sec, which are better than the delays for
SB and the intersection during regular peak hour of 7:45AM-8:45AM.
• The mitigations of exclusive southbound right turn lane and exclusive westbound left
turn lane at the study intersection can also benefit the traffic performance during
regular peak hour of 7:45AM-8:45AM. With both exclusive turn lanes, the SB delay
could be shortened from 118.0 sec to 103.5 sec and the intersection delay could be
shortened from 70.8 sec to 64.5 sec.