Loading...
HomeMy WebLinkAboutSP201800011 Study 2019-06-14EPR, PAC. "ENGINEERING & PLANNING RESOURCES" EPM)c 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MEMORANDUM TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING DATE: JUNE 14, 2019 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER: SUPPLEMENT YEAR 2028 WITH 280 STUDENTS ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic analysis for the proposed Regents School Site to examine the impact of the proposed Regents School with 280 students on Fontaine Avenue/Route 29 Southbound Ramp intersection in the future year 2028. To accomplish the goal, this analysis assumed the school start time being 7:45 AM and all school trips arriving in the morning between 7:15-7:45 AM to examine the future year 2028 build conditions between 7:15-7:45 AM. The proposed Regents School was assumed to have 280 students in the future year 2028. The future year 2028 build conditions between 7:15-7:45 AM were then compared to the future year 2028 no build conditions in the commuter AM peak hour, which was obtained from the prior Regents School Site Traffic Assessment (10/12/2018), which evaluated the impact of the proposed Regents School with 280 students in the future year 2028 during the typical commuter peak hour. The following provides a brief summary of this information. Trip Generation The trip generation of the proposed Regents School with 280 students was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 1 below. Table 1 Trip Generation with 280 Students Scenario 2028 AM w/ 280 students 2028 PM w/ 280 students In/Out Inbound Outbound Inbound Outbound Total Trips 121 77 55 87 EPW( EPR, PrC. "ENGINEERING & PLANNING RESOURCES" 902 E 1EFFERSON ST. UNIT 101 CHARLOTTESVILLE VA 22902 Traffic Volumes 2028 No Build Traffic Volumes between 7:15-7.45 AM 2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement (3/6/2019) and illustrated in Figure 1 below. Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM AM 29 SB 2 2 290 F 14 4 r 192 Fontaine 24 12 29 SB Site Trip Distribution and Assignment EBT EBR WBL WBT SBL 'SBT SBR Total r 7:15 4 4 41 4 67 0 0 120 r Vehicle 7:30 8 2 55 3 78 1 1 148 Total 1/2 Hour 12 6 96 7 145 1 1 268 Hour 24 12 192 14 290 2 2 536 PHF 0.91 Truck 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 0% 0% 14% 2% 100% 0% Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm. Figure 2 Site Trip Distribution AM 29 SB ■ ■ I f 0 0 Fontaine L 73% 25% 29 SB The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 with 280 students are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 3 below. EPRP(" EPR,PAC. "ENGINEERING & PLANNING RESOURCES„ 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VFW 22902 Figure 3 2028 Site Trips with 280 Students AAA 29 SB ~ ■ 7:15 0 0 Vehicl 7:30 ■ L eTotal i 0 1 1/2 Hour Fontain Hour ~ 112 PHf 8 3 Truck i/2 Hour HVP 29 S B EBT EBR WBL WBT SBL SBT SBR Total 22 8 0 35 0 0 12 77 34 11 0 53 0 0 18 116 56 19 00 0 0■ 193 112 38 0 176 0 0 60 386 1 0 0 1 0 0 0 2028 Build Traffic Volumes between 7:15-7.45 AM Combining the background traffic with the site trips as shown, Figure 4 below illustrates the build condition traffic volume calculation. Figure 4 2028 Build Traffic Volumes between 7:15-7:45 Ann EBT EBR WBL WBT SBL SBT SBR Total 7:15 26 12 41 39 67 0 12 197 Vehicl 7:30 42 13 55 56 78 1 19 264 e Total 1/2 Hour 68 25 96 95 145 1 31 461 Hour 136 50 192 190 290 2 62 922 PHF 0.87 Truck 1/2 Hour 2 0 0 2 2 1 0 HVP 3% 0% 0% 2% 1% 100% 0% 2028 Build Conditions between 7:15-7:45 AM The future year 2028 build conditions between 7:15-7:45 AM were analyzed in Synchro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 2 summarizes the analysis results: Table 2 2028 Build Conditinnc hatuwoan 7.1 r-7•AC Ann Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.7 A/3.2 D/27.7 B Approach LOS/Delay A/1.7 A/3.2 D/27.7 12.0 Movement Queue 11 87 350 E(PRY `, EPR, PAC. "ENGINEERING & PLANNING RESOURCES' l902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 2028 No Build Conditions in Commuter AM Peak Hour The future year 2028 no build conditions traffic analysis results were obtained from the prior Regents School Site Traffic Assessment (10/12/2018) for comparison purpose. The following Table 3 summarizes the analysis results: Table 3 2028 No Build Conditions in Commuter AM Peak How Year 2028 No Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R I. Rte 29/Fontaine SB Movement LOS/Delay A/1.S A/2.3 E/45.4 D Approach LOS/Delay A/1.S A/2.3 E/45.4 30.1 Movement Queue 4 S7 > 500 Finding: comparison of 2028 Build Conditions between 7:15-7:45 AM and 2028 No Build Conditions in Commuter AM Peak Hour Comparing analysis results above, the finding of this study effort is —the traffic operation in the future year 2028 build conditions between 7:15-7:45 AM is better than in the future year 2028 no build conditions in commuter AM peak hour: • The overall intersection level of service is LOS B in the future year 2028 build conditions between 7:15-7:45 AM, while it is LOS D in the future year 2028 no build conditions in commuter AM peak hour. • The overall intersection delay is 12.0-seconds in the future year 2028 build conditions between 7:15-7:45 AM, while it is 30.1-seconds in the future year 2028 no build conditions in commuter AM peak hour. • Route 29 southbound ramp delay is 27.7-seconds, which falls at the lower end of LOS D, in the future year 2028 build conditions between 7:15-7:45 AM, while it is 45.4-seconds, which falls at the upper end of LOS E, in the future year 2028 no build conditions in commuter AM peak hour. • Route 29 southbound ramp queue is 350 feet in the future year 2028 build conditions between 7:15-7:45 AM, while it is longer than 500 feet in the future year 2028 no build conditions in commuter AM peak hour. End of Memorandum Attachment: 2028 Build Conditions Between 7:15-7:45 AM SimTraffic Reports SimTraffic Performance Report 2028 Build AM_280 Students 06/11/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane ------------- Movements Served TR LT LTR Denied Del/Veh (s) 0.4 Total Del/Veh (s) 1.7 3.2 27.7 12.0 Total Network Performance Denied Del/Veh (s) 0.4 Total Del/Veh (s) 12.7 Regents School Study Supplement EPR SimTraffic Report Page 1 Queuing and Blocking Report 2028 Build AM 280 Students 06/13/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 TR LT LTR 11 87 350 0 32 125 5 69 268 708 507 520 0 0 egen s c ool Study Supplement EPR SimTraffic Report Page 1