Loading...
HomeMy WebLinkAboutZMA201800014 Review Comments 2019-05-01 kd I l i yi Wime COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 May 1, 2019 Valerie Wagner Long 321 East Main St. Suite 400 Charlottesville, VA 22902 vlong@,williamsmullen.com/(434)-95 1-5709 Elise Cruz PO Box 400218 Charlottesville, VA 22904 ecruz@uvafoundation.com/(434)-982-924-2365 RE: Review Comment Letter#2 /ZMA-2018-00014 (Birdwood Mansion and Grounds) Mrs. Long and Mrs. Cruz: Members of Albemarle County staff and our partner agencies have reviewed your revised and resubmitted application materials (received 4/1/2019) for Zoning Map Amendment ZMA-2018- 00014. The revised, resubmitted application materials request to rezone an approximately 15.2-acre portion of the 544-acre property identified as Tax Map Parcel#75-63 from Residential R-1 to Highway Commercial (HC),with proffers, to allow for the renovation of the Birdwood Mansion, dependencies, and grounds for use as a special events venue that includes overnight lodging. Updated review comments are provided below, organized by Department, Division, or agency. Although some review comments remain(see below), Community Development Department (CDD) staff believe your request may be ready to proceed to a public hearing with the Planning Commission,provided that certain revised application materials are submitted in a timely manner. Please contact me to discuss your intended next steps after reviewing these review comments and the attached Action After Receipt of Comment Letter document. As always, CDD staff remain available to provide assistance and discuss this comment letter, and any other aspect(s)of your applications, at your request. Planning: The following CDD-Planning review comments are organized as follows: • How the proposal relates to the Comprehensive Plan • The Neighborhood Model analysis • Additional Planning comments Page 1 of 11 7 � Comprehensive Plan: Comments on how your project conforms to the Comprehensive Plan will be provided to the Planning Commission and Board of Supervisors as part of the staff report that will be prepared for the work session or public hearing. The comments below are in preparation for the Planning Commission review, and may change based on direction from the Commission and/or with subsequent submittals. "Iiiiii1111110. 81_---7— Ir i ��� � Arc �n�� ti'n i.E � •n IIII -' r 07 \��.� 0 ., / '9 111 2 F --, 1 `oO , ti47 n y / i l `_ //^' - `r role — •airy) •: 06.,g, 1 i / ,i ,ftiro 1 \\,4,,,oep .1( 0 P 4120\ � �4 4,0 lip � �2 .0, a / i •, i Q gilll49 'V 0. .. . • GS epl e t •. • s , -' 1 iC 40.S .401 lili ,.'s 0 r Alt ACI • A..' 4Ir ‘17L.— I.* 1 I The property is located on Tax Map Parcel#75-63,which is within Neighborhood 6 Comprehensive Plan Area(Western Urban Neighborhood)within the Development Area. The portion of the Birdwood property involved in this proposal is designated for"Institutional"uses (shown in blue) on the Future Land Use Map in the Southern and Western Urban Neighborhoods Master Plan(S+W Master Plan). The Birdwood property is also located within Area B, and is therefore subject to a three-party collaborative planning agreement with the University of Virginia, County of Albemarle, and City of Charlottesville(Planning and Coordination Council/PACC). As discussed prior to the submittal of ZMA-2018-00014, and as identified in the first review comment letter(dated 12/17/2018), the original proposal was not consistent with the Future Land Use language that was in the S+W Master Plan at the time of your original application. However, as you are aware, on 3/20/2019 the Board of Supervisors voted to adopt and approve CPA-2018-00006, which updated the Future Land Use Plan for the Birdwood property. In consideration of these amendments to the Southern and Western Urban Neighborhoods Master Plan, ZMA-2018-00014 is consistent with the current Future Land Use recommendations,which include the following: "The Birdwood property also includes the historic Birdwood Mansion, which is listed on the National Register of Historic Places and the Virginia Landmarks Register. This 14-acre historic site includes the Birdwood Mansion, several contributing dependencies, and the surrounding historic landscape. In the past, the mansion has provided a venue for small University related events. The historic mansion, the surrounding historic landscape, and important dependencies Page 2 of 11 should be carefully retained in any future development. The PACC-endorsed Birdwood Area B Study includes near future plans for the Birdwood Mansion, dependencies, and surrounding grounds to be rehabilitated and repurposed for University-related events, other special events associated with the adjoining Boar's Head Resort, and other hospitality and short-term lodging uses. Such planned reuse of the Birdwood Mansion would bring a new,era of utility and vitality to this historic site that is currently vacant,provided that it is done in a context-sensitive way that does not compromise the historic integrity of the buildings or landscape, and does not jeopardize it's listing on the state or national register. " In addition to consistency with the Comprehensive Plan,please also be advised that all zoning map amendment applications are evaluated relative to the "factors to be considered" specified in County Code §18-33.27(B). Neighborhood Model: In 2001, the County adopted the Neighborhood Model (NM),which consists of twelve different recommended characteristics to guide the form of proposed development projects within the Development Areas. General comments on how well the proposed development meets the principles of the Neighborhood Model are provided below, to the extent that NM analysis can be conducted at this time with the materials provided to date. More detailed comments will be provided at a later date after more detailed conceptual plans are provided and/or if changes are made to the proposal. Pedestrian Information submitted with previously-approved SP-2017-00032,described in Orientation previous community meetings,and contained within the PACC-endorsed Birdwood Area B Study suggests that the Birdwood property will contain a network of non- vehicular connections (golf cart paths and walking trails)which would provide access throughout the Birdwood property,and which would provide pedestrian connection with the designated"Center"at Boar's Head. Principle is met. Mixture of Uses The special events proposal would establish new,complimentary uses to the surrounding Birdwood Golf Course and adjacent Boar's Head Resort. Principle is met. Neighborhood Information submitted with previously-approved SP-2017-00032,described in Centers previous community meetings,and contained within the Birdwood Area B Study suggests that the Birdwood property will contain a network of non-vehicular connections (golf cart paths and walking trails)which would provide access throughout the Birdwood property and which would provide pedestrian connection with the designated"Center"at Boar's Head.The Boar's Head Drive provides vehicular interparcel connection to the"Center"at Boar's Head. Principle is met. Mixture of Housing Principle is not applicable. Types and Affordability Page 3 of 11 Interconnected The proposal utilizes existing transportation infrastructure, including Boar's Head Streets and Drive which now provides a permanent vehicular interparcel connection between Transportation the Birdwood property and Boar's Head Resort.An existing service drive to the Networks rear/south of the Birdwood Mansion would provide service vehicles and emergency vehicles with vehicular access around the entire project site. Principle is met. Multi-modal Proposal includes partial reliance on shuttling guests to the Birdwood Mansion from Transportation the Boar's Head Resort and the Birdwood Golf Clubhouse parking lot. Information Opportunities submitted with previously-approved SP-2017-00032, described in previous community meetings,and contained within the Birdwood Area B Study suggests that the Birdwood property will contain a network of non-vehicular connections (golf cart paths and walking trails) which would provide access throughout the Birdwood property and which would provide for some connectivity with surrounding residential neighborhoods and the designated"Center"at Boar's Head. However,the application materials do not contain any explicit information about these types of non-vehicular connections.The proposal also does not appear to contain any information about the proposed Three Notch'd Trail,a planned greenway that will connect Crozet and Charlottesville and which is proposed to have a general alignment along the 250 / Ivy Road corridor. Principle is partially met;further evaluation pending. Parks,Recreational This proposed project is situated within a large golf course with cart paths which can Amenities,and Open be used by guests of the Boars Head Resort and event attendees,and (potentially) by Space members of the public.The Birdwood property also contains extensive hiking trails which can be accessed by the cart paths and other sidewalks.The portions of the subject property which have a future land use designation of"Parks and Green Systems"are excluded from this proposal,and therefore would not be impacted or otherwise affected. Principle is met. Buildings and Space The proposal is to rehabilitate and reuse existing historic structures; no new of Human Scale structures are shown on the conceptual plan. Principle is met. Relegated Parking The conceptual plan appears to show all proposed new parking located in a side yard area,beyond the front facade of the primary structure (historic mansion).The proposal also utilizes existing parking areas and shared parking agreements. Principle is met. Redevelopment The proposed rehabilitation and reuse of the Birdwood Mansion would end an era of disuse and thereby prevent further deterioration of this historic resource,and would bring a currently underutilized structure into a new era of stability and functional use.The proposal would also partially utilize existing transportation infrastructure. Principle is met. Page 4 of 11 Respecting Terrain Although a conceptual grading plan was not provided,the proposal and program for and Careful Grading this property do not seem to require extensive grading.Construction of a new access and Re-grading of road/driveway will partially utilize a historic driveway alignment; and the remaining Terrain (unused)section of that historic driveway alignment will be preserved. However,a proposed service road (or similar improvement)leading to the southwestern corner of the Birdwood Mansion would require grading and construction within the root zone of a row of very large mature canopy trees,and would likely send these trees (which contribute significantly to the historic landscape)into decline.Staff strongly recommends removal of this proposed improvement,and the use of existing service drives. Staff recommends archaeological surveying for any disturbance within the historic core (see CDD-ARB review comments dates 4/26/2019). Principle is partially met Clear Boundaries The portion of the Birdwood property which adjoins the Rural Areas,and which is with the Rural Area designated as Parks and Green Systems on the Future Land Use Plan,would remain undeveloped forested foothills in this proposal. Principle is met. Additional Planning Comments: 1. Comprehensive Plan/CPA-2018-00006: In consideration of recent amendments to the Southern and Western Urban Neighborhoods Master Plan(CPA-2018-00006),ZMA-2018- 00014 is consistent with the Future Land Use recommendations. 2. Conceptual Plan: Staff acknowledge revision of the conceptual plan to provide more details at a larger scale. Thank you. Staff review of the revised conceptual plan has led to the following comments: a. Staff are concerned about the lack of specificity of the following note: "Temporary event tents or permanent accessory structures may be erected in these areas. " It is difficult to evaluate the potential impacts of those variable proposals; for example, temporary tents would have a different type and degree of impact to historic resources than a permanent structure would, and any such impacts would be different depending on the particular location of the event facility. Please revise this note to be more specific about proposed location(s) of temporary event tents, and proposed location(s) of permanent accessory structures (as may be applicable). b. Please identify the proposed new improvement on the southwest edge of the"historic core" (appearing to be a service drive with a vehicular turnaround), and please explain the intended use of this improvement. Due to the physical impacts such an improvement would likely have on the root systems of the row of very large mature canopy trees, and due to other general impacts to the character of this historic landscape, staff strongly recommend the removal of this proposed improvement and the use of other existing travelways for deliveries and other similar service trips. c. It appears that there are linear features(appearing as thin white lines) shown within the proposed HC District(distinct from the cart paths, shown in a thicker gray line). Please clarify if these are proposed features—and if so,please identify them (such as walking trails). d. Please also see review comments from CDD-Zoning staff and CDD-ARB staff. Page 5 of 11 3. Proposed District Boundaries: Staff acknowledge that the proposed district boundaries have been revised to exclude all Birdwood Golf Course tees, fairways, bunkers, greens, and similar features of play from the proposed HC district. Thank you. 4. Proffer Statement: Staff acknowledges the revision and resubmittal of the proffer statement (now dated April 1, 2019). Thank you for providing this in blackline and clean formats. Staff review of the revised proffer statement has led to the following comments: a. (Proffer 2): Please review and confirm the proposed uses; there are discrepancies that need to be resolved. For example, some of the uses listed as permissible in paragraph 2.a are then shown as being struck through in the ensuing list of permissible uses under heading 24.2.1. Similarly, some of the uses listed as permissible in paragraph 2.b are then shown being struck through in the ensuing list of permissible uses under heading 22.2.1. Please address and resolve these discrepancies. b. (Proffer 4): This cross-reference to SP-2017-00032 conditions of approval#8 and #9 is appropriate. However, the option described in this proffer is not currently possible, even if it is worded to be an option at the County's discretion. More specifically, modifying the timing of the warrant analyses that are required by SP- 2017-00032 conditions of approval#8 and#9, or changing the reference point from the permanent opening of the connector road to the issuance of a Certificate of Occupancy for the Birdwood Mansion and Grounds,would require an approved Special Use Permit Amendment to alter the terms of SP-2017-00032. Alternately, if the applicant wishes to preemptively address any uncertainty about potential future changes to traffic volumes and patterns after the opening of the Birdwood Mansion and Grounds, a third(additional)round of warrant analyses could be conducted at a specified amount of time after the issuance of a Certificate of Occupancy for the Birdwood Mansion and Grounds, separate from and in addition to the two rounds of warrant analyses that are required by the previous special use permit. Regardless, Staff recommends removing the language about this option, and maintaining the cross-reference to SP-2017-00032 conditions of approval#8 and#9 (as stated in the first sentence of proffer 4). 5. Sound Study: Staff acknowledge the preparation and submittal of the Sound Study prepared by Acentech(dated 3/28/2019). Thank you. Staff review of the sound study has led to the following comments: a. Staff acknowledge that this study, including the sound level predictions and noise contour models contained therein, appear to demonstrate that the proposed special events could be able to comply with the applicable Noise Ordinance requirements and regulations (provided that setup and operation of sound equipment is done in ways that are identified in the sound study). b. Please clarify if any commitments are being made as part of this ZMA application to setup and operate sound equipment at Birdwood Mansion and Grounds in a manner that would be consistent with the assumptions and models contained in the sound study, and which would therefore be reasonably expected to comply with the applicable Noise Ordinance requirements and regulations. • CDD-Zoning: Written review comments from Lea Brumfield, Senior Planner, are pending and will be provided upon receipt. Page 6 of 11 f , 6 CDD-ARB/Design Planning: Written review comments (dated 4/26/2019) from Margaret Maliszewski, Principal Planner, are attached to this letter. Mrs. Maliszewski has indicated a review status of"Requested Changes." CDD-Engineering: County Engineer Frank Pohl, PE, CFM, has indicated"No Objection"on 4/22/2019. Mr. Pohl has also explained during interdivisional meetings that VSMP permitting would be required for the proposed project [through the preparation and submittal of a Water Protection Ordinance (WPO) Plan application, separate from the Site Plan application]. This would be done through the submittal of an application for a new WPO Plan utilizing the"Common Plan of Development" framework(in the context of the-other approved or active WPO Plans for TMP #75-63). Albemarle County Service Authority(ACSA): Written review comments for the resubmittal materials have not been received from the ACSA. Any/all review comments will be promptly forwarded upon receipt from ACSA. Rivanna Water and Sewer Authority: Victoria Fort, PE, Senior Civil Engineer indicated"No Objection"on 11/21/2018, and provided the following comments (below). No RWSA review comments have been provided to date for the resubmittal materials. 1. Capacity issues for sewer that may affect this proposal : None Known 2. Requires Rivanna Water and Sewer Authority Capacity Certification: Yes X No 3. Water flow or pressure issues that may affect this proposal: None Known 4. "Red Flags"regarding service provision(Use attachments if necessary): None Known Albemarle County Fire & Rescue: The following comments (below)were provided by Deputy Fire Marshall Shawn Maddox on 11/28/2018: "Fire Rescue has no objections to the special use permit application as submitted."No ACFR review comments have been provided to date for the resubmittal materials. Action after Receipt of Comments: After you have read this letter,please take one of the actions identified on the following pages titled"Action After Receipt of Comment Letter." Resubmittal: If you choose to resubmit,please submit revised application materials on one of the formal resubmittal dates. Please note that a second resubmittal will require an additional fee. Notification and Advertisement Fees: Prior to scheduling a public hearing with the Planning Commission: $ 392.00=Cost for newspaper advertisement $ 215.00=Cost for notification of adjoining owners (minimum $200+actual postage/$1 per owner after 50 adjoining owners) $ 607.00=Total amount due prior to Planning Commission public hearing Page 7 of 11 Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing needed. $392.00=Additional amount due prior to Board of Supervisors public hearing $ 999.00=Total amount for all notifications.Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Please contact me if you would like to set up a eeting to discuss this comment letter or any other aspect of your proposed project, or to share any questions or requests for assistance you may have. My phone number is (434)296-5832, x. 3088, . d my email address is tpadalino(aialbemarle.org. Sincerely, P41444.--- Tim Padalino,AICP Senior Planner Planning Services • 1J1I � Page 8 of 11 DEPARTMENT OF COMMUNITY DEVELOPMENT 1ocAI4?41 ll 11 4 �ItC;IN�A/ ACTION AFTER RECEIPT OF COMMENT LETTER SECOND SET OF COMMENTS Your project has been tentatively scheduled for a public hearing by the Planning Commission (PC) for June 4, 2019, unless you request that the hearing be deferred to a later date. As you will read in this comment letter, staff have identified issues and have recommended changes to your project to help you achieve approval. Without these changes, staff cannot currently recommend approval to the PC. If you would like to address the comments you must request deferral by Friday, May 10. If you choose not to request deferral of the public hearing date, staff will take your project to the Planning Commission as resubmitted on April 1, 2019, but without a recommendation of approval. Instructions for requesting a deferral of the public hearing are outlined below. Please note that you can submit revisions, and continue to receive review comments from County staff, even if you defer your application. No later than Friday, May 10, 2019, please do one of the following: (1) Resubmit in response to review comments by the date noted above (24 R ,. ucst deferral e d by Section 33 52 n these inctanccc• Note: Deferral for ZMA-2018-00014 pursuant to Section 33.52 was received 12/21/2018,with BOS action requested no later than 9/1/2019. (3) Proceed to Planning Commission public hearing on June 4, 2019 (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you choose to resubmit (see option (2), below) please be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Deferral requested To request deferral, you must submit a request in writing to defer action by the Planning Commission and Board of Supervisors. The request may be made by email. You may request a Page 9 of 11 deferral for up to 36 months from the date your application was accepted for review, which is October 30, 2021. (This is based on the Board of Supervisors' September 5, 2018 action.) However, all outstanding information necessary for PC action must be submitted no later than June 30, 2021, according to the published schedule. (See Section 18-33.52 of the Albemarle County Code.) Note:Deferral for ZMA-2018-00014 pursuant to Section 33.52 was received 12/21/2018, with BOS action requested no later than 9/1/2019. (3) Proceed to Planning Commission Public Hearing on June 4, 2019 At this time, you may request that your application proceed to public hearing with the Planning Commission tentatively scheduled on June 4, 2019. With this option, staff will take your project to the PC as resubmitted on April 1, 2019, but without a recommendation of approval. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Resubmittals As stated above, a deferral does not preclude you from resubmitting the application to address changes based upon the comments. If you would like to resubmit after you defer, you may do so following the resubmittal schedule. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) Failure to Respond An application shall be deemed to be voluntarily withdrawn if the applicant requests deferral pursuant to subsection 33.52(A) and fails to provide within 90 days before the end of the deferral period all of the information required to allow the Board to act on the application, or fails to request a deferral as provided in subsection 33.52(B) or (C). Fee Payment Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Fees may also be paid by credit card using the secure online payment system, accessed at http://www.albemarle.org/department.asp?department=cdd&relpage=21685. Page 10 of 11