Loading...
HomeMy WebLinkAboutSP201800011 Correspondence 2019-07-01July 1, 2019 Mr. Tim Padalino .Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: SP-2018-00011 (Regents School — Reservoir Road) Resubmit ll j Cover Letter Dear Tim, The materials included with this letter are for the resubmittal of SP2018-11, a project known as Regents School. As we have discussed, and as shown on the Supplemental Traffic Study memo by EPR dated June 14, 2019, if the school enrollment is limited to 280 students initially, and the start of the school is 7:45 am, the 2028 build conditions (with the school at 280 students with a 7:45 start time) are an improvement over the 2028 no build conditions (no Regents School at the Reservoir Road site) in terms of the following: • Overall level of service (LOS) of the Route 29 / Fontaine Avenue intersection (LOS B compared to LOS D) • Overall intersection delay (12 seconds compared to 30.1 seconds) • Route 29 southbound ramp delay (27.7 seconds compared to 45.4 seconds) • Route 29 southbound ramp que length (350 feet compared to 500 feet). Based on this information, and on the meeting held with representatives of Regents School with Kevin McDermott and Adam Moore of VDOT, we suggest a condition of approval as follows: "Except as otherwise provided herein, initial student enrollment shall be limited to 280 students, and the start time of the school shall be 7:45 am, until the completion of improvements to the Route 29/Fontaine Avenue intersection. Notwithstanding the, foregoing, student enrollment may exceed 280 students, and/or the school start time may be shifted to a time later than 7:45 am if the Applicant demonstrates to the reasonable satisfaction of VDOT and the Director of Community Development (or his/her designee) that the fiinctional operations of the Route 29/Fontaine Avenue intersection will continue to be adequate to accommodate the additional trips associated with the proposed increase in school enrollment and/or later school start time. In no event may the student enrollment exceed 468 students without an amendment to this Special Use Permit. " Please note several additional traffic studies are included with this resubmittal for your reference as well as additional cross sections to aid in your evaluation of the potential visibility of structures on the site from the entrance corridor. If you require any additional information to complete your review of this special use request, please let me know at your earliest convenience. Respectfully, Kelsey Schlein (434)227-51401 Kelseynshimp-enginering.com Cc: Justin@shimp-engineering.com vlong@williamsmul len.com Attachments: Response Letter Revised Narrative Revised Concept Plan Revised Road Plans 29 EC Cross Section 64 EC Cross Section 64 Eastbound EC Cross Section EC Streetview Exhibit Comp Plan Overlay Exhibit Traffic Study dated October 12 Traffic Study dated March 6 Traffic Memo dated June 14 Traffic Memo dated July 1