Loading...
HomeMy WebLinkAboutSP201800011 Study 2019-07-01EPFj)(­, EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MEMORANDUM TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING PHONE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT SUPPLEMENT #4 BY -RIGHT DEVELOPMENT ANALYSIS ................... ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT DATE: JULY 01, 2019 SENDER'S REFERENCE NUMBER: YOUR REFERENCE NUMBER: ❑ PLEASE REPLY ❑ PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic analysis for the proposed Regents School Site to examine the impact of the by -right development, 23 single family homes, at the proposed Regents School Site on Fontaine Avenue/Route 29 Southbound Ramp intersection in the future year 2028 AM peak hour. To accomplish the goal, this analysis obtained the 2028 no build AM peak hour traffic volumes and traffic performance results from the prior Regents School Site Traffic Assessment (10/12/2018), added in site trips generated by the by -right development, and analyzed the 2028 build AM peak hour traffic performance results with the 23 single family homes. The following provides a brief summary of this information. 2028 No Build AM Peak Hour Traffic Volumes 2028 no build AM peak hour traffic volumes were obtained from the prior Regents School Site Traffic Assessment (10/12/2018) and are illustrated in Figure 1 below. Figure 12028 No Build AM Peak Hour Traffic Volumes AM 29 SB Fon?aine 29 SD EPRP11R, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 2028 No Build AM Peak Hour Traffic Performance 2028 no build AM peak hour traffic performance results were obtained from the prior Regents School Site Traffic Assessment (10/12/2018). The following Table 1 summarizes the analysis results: Table 12028 No Build AM Peak Hour Traffic Perfnrmance Racultc Movement/Approach Fontaine EB Fontaine WB Rte 29 56 Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.5 A/2.3 E/45.4 D Approach LOS/Delay A/1.5 A/2.3 E/45.4 30.1 Movement Queue 4 57 > 500 Trip Generation The trip generation of the by -right development, 23 single family homes, was calculated using web -based ITE Trip Generation Manual (10th edition) and is summarized in Table 2 below. Table 2 By-rieht Develonment Trin GpnPration By -right Development Trip Generation LU CODE Units Weekday I AM Total FAM IN I AM OUT I PM Total I PM IN I PM OUT 2028 210 23 269 1 21 5 16 1 25 16 1 9 AM Site Trip Distribution and Assignment AM Trip distribution was assumed as per the existing traffic pattern and is illustrated in Figure 2 below. Figure 2 AM Site Trip Distribution AM 29 SB Fontaine 29111 Outbound EPR"ENGINEERING & PLANNING RESOURCES" EPRpc 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 The AM site trips as summarized in Table 2 were assigned to the road network based on the distribution as noted above. Figure 3 illustrates the AM site trips generated by the by -right development, 23 single family homes. Figure 3 AM Site Trips Fontaine 5 29 5B 29,B 2028 Build AM Peak Hour Traffic Volumes The AM site trips as shown in Figure 3 were added to the 2028 no build AM peak hour traffic volumes as shown in Figure 1 resulting the 2028 build AM peak hour traffic volumes. Figure 4 illustrates the 2028 build AM peak hour traffic volumes. Figure 4 2028 Build AM Peak Hour Traffic Volumes AM Fontaine 29 SB 29 SB 2028 Build AM Peak Hour Traffic Performance 2028 build AM peak hour traffic performance was analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic results were utilized for the level of service, delay, and queue analyses. The following Table 3 summarizes the traffic performance results for 2028 build AM peak hour. EPRiv EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE VA 22902 Table 3 2028 Build AM Peak Hour Traffic Performance RPculrc 2028 Build AM Fontaine EB Fontaine WB Rte 29 SIBMovement/Approach Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.6 A/2.4 F/50.6 D Approach LOS/Delay A/1.6 A/2.4 F/50.6 32.8 Movement Queue 0 62 > 500 Findings Comparing the traffic performance results above for 2028 build AM peak hour to the traffic performance results for 2028 no build AM peak hour, the impact of the site trips generated by the by -right development, 23 single family homes, is minor on Fontaine Avenue/Route 29 Southbound Ramp intersection in the future year 2028 AM peak hour — the overall delay at the intersection is 2.7 seconds longer, the delay on Fontaine Avenue is 0.1 second longer for both eastbound and westbound, and the delay on Route 29 Southbound Ramp is 5.2 second longer. End of Memorandum Attachment: 2028 Build Peak Hour SimTraffic Reports SimTraffic Performance Report 2028 Build AM (By -right Development) 07/01/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB WB SB All Movements Served TR LT LTR Denied DelNeh (s) 5.8 Total DelNeh (s) 1.6 2.4 50.6 32.8 Regents School Study 2018 SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM (By -right Development) 07/01/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement WB SB Directions Served LT LTR Maximum Queue (ft) 62 541 Average Queue (ft) 16 285 95th Queue (ft) 47 553 Link Distance (ft) 486 525 Upstream Blk Time (%) 13 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Kegents School Study 2018 EPR SimTraffic Report Page 1