HomeMy WebLinkAboutSUB201900106 Correspondence 2020-01-06Tim Padalino
From:
Tim Padalino
Sent:
Monday, January 6, 2020 12:02 PM
To:
Joe Medley; Brian Becker; Andrew Slack
Cc:
Jonathan Showalter
Subject:
RE: UVARP Final Plat (SUB201900106)
Hello Joe,
Thanks for making these revisions to SUB201900106. This resolves the remaining CDD-Planning review comment
(issued 10/24/19), and I have no objections to this final plat.
I copied GDS staff on this response (including Brian Becker, who is currently handling road naming; and Andy
Slack, who you previously coordinated with). They can review the new proposed private street name ("John C.
Herr Drive") and determine if that is acceptable.
Brian, please let us know if that name is acceptable whenever you are able to review and make a determination.
Joe, if no other revisions to this plat are necessary based on GDS comments, and/or based on CDD review of
corresponding WPO Plan and/or Road Plans, then this plat should be ready for notarized owners signatures.
However, please note that CDD cannot approve this final plat of division and BLA (SUB201900106) until after the
corresponding water protection ordinance plan (WP0201900021) and corresponding road plans (SUB201900049)
are approved (inclusive of all associated documents / agreements / easements / bonds and/or other sureties being
finalized).
I hope this info helps. Please let me know if you have any additional questions at this time.
Thanks very much ---
Tim Padalino 1 (434)-296-5832 x 3088
From: Joe Medley <Joe.Medley@timmons.com>
Sent: Friday, January 3, 2020 7:09 AM
To: Tim Padalino <tpadalino@albemarle.org>
Cc: Jonathan Showalter <Jonathan.Showalter@timmons.com>
Subject: RE: UVARP Final Plat (SUB201900106)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Tim -
Regarding SUB201900106 ('UVA Research Park Loop Road' plat), please see the attached PDF of what we hope to be the
final version of the plat (for final approval).
The comment provided (CDD-Planning, comment 6, stipulating notation of 50' Buffer Zone) has been addressed on this
version. Sheet 2 presents graphically, with annotation, the 50' eastern buffer, with annotation. The depiction also
appears on subsequent sheets 3 & 4 where those portions of the site appear.
I also want to note that there was interest in showing the name of the 'Loop Road' upon determination of this
name. The loop road will be John C. Herr Drive, and we are showing this on the plat as well.
Please let us know if you have any questions, and if we are in position to submit the final, signed plat for County
approval and signature. Thanks!
Joe
Joe Medley, LS
Group Leader
TIMMONS GROUP I www.timmons.com
YOUR VISION ACHIEVED THROUGH OURS.
28 Imperial Drive I Staunton, VA 24401
Office: 434.327.1689
Mobile: 540.607.7500 1 ioe medley@timmons.com
a 0 0 0
To send me files greater than 20MB click here.
From: Jonathan Showalter <Jonathan Showalter@timmons.com>
Sent: Friday, October 25, 2019 8:56 AM
To: Joe Medley <Joe Medley@timmons.com>
Cc: Craig Kotarski <Craig Kota rski timmons.com>
Subject: FW: UVARP Final Plat (SUB201900106)
From: Tim Padalino <tpadalino albemarle.org>
Sent: Thursday, October 24, 2019 4:44 PM
To: Jonathan Showalter <Jonathan.Showalter@timmons.com>; Fred Missel <fmissel uvafoundation.com>; Todd
Marshall <tmarshall uvafoundation.com>
Subject: UVARP Final Plat (SUB201900106)
Hello Jonathan, Fred, and Todd ---
Please find attached the 3rd review comment letter for the final plat referenced above.
Since I'm the only reviewer still requesting any revisions, and since the remaining revision is minor, I would be
willing to look at a draft PDF of the final plat before you resubmit for approval. Assuming that final review comment
is addressed on the PDF, that would save you the effort, cost, and time of formally resubmitting for re -review (just
to confirm that one final revision).
And as this letter specifies, the road plans (SUB201900049) for the loop road have to be approved and bonded
prior to final plat approval, but hopefully that informal digital review process described above will still be somewhat
helpful.
Thanks; and please let me know if any of you have questions.
Tim Padalino, AICP
(434)-296-5832 x 3088
Senior Planner I Community Development Department — Planning Division
https://www.albemarle.org/department.asp?depaqment=cdd