Loading...
HomeMy WebLinkAboutSDP202000001 Other 2020-03-16 (2)SHIMP ENGINEERING, P.C. Design Focused Engineering March 13, 2020 Mr. Adam Moore, P.E. Virginia Department of Transportation 701 VDOT Way Charlottesville, VA 22911 RE: ZMA2019-00015 Our Neighborhood CDC TMP 78-58K Mr. Moore, Please find enclosed a right and left turn lane warrant analysis for the proposed Our Neighborhood Child Development Center on the eastern side of Route 20 (Stony Point Road). The enclosed analysis is based off the initial student enrollment on the site of 100 students. The following items are included with this report: • VDOT 2018 Traffic Data • ITE Trip Generation (10' Edition) Summary • Warrant Analysis Exhibit Our analysis shows that only a left turn lane is warranted for this project. A left turn lane already exists in front of the property. If you have any questions you may contact me atjustin@shimp-engineering.com or by phone at 434-953- 6116. Best Regards, Justin Shimp Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com Initial Enrollment: 100 Students 1. VDOT 2018 Traffic Data Speed Limit 45 MPH VA 20 STONY POINT RD 3.12 mi segment from US 250 Richmond Rd to Urban Boundary K 0.107500002 D 0.607500017 AADT 10000 Peak Hour Total 1075 Peak Hour Direction A 422 Above is the VDOT 2018 traffic data which was used to determine the peak hour trips in each direction. For this particular use, estimated trip generation was estimated to be consistent with existing background trip distribution at 60% traveling south in the morning and 60% traveling north in the evening. This assumption was used in conjunction with ITE Trip Generation information to create the estimate of right and left turns into the site. Please see the table below. 2. ITE Trip Generation (10' Edition) Summary ITE Code Unit (number of students) Population Basis Daily Traffic AM Peak Hour I PM Peak Hour n lout Total In Out Total sbs 100 Initial Enrollment 2861 421 37 79 38 43 81 ]Left Right Turn 1 251 Right Turn 27 Turn 1 171 Left Turn it 3. Warrant Analysis Exhibit In the morning, with 25 right turns and an approach total of 422 vehicles, a right turn taper is not warranted. 120 24 PHV APPROACH TOTAL, VEHICLES PER HOUR F-80 Appropriate Radius required at all Intersections and Entrances (Commercial or Primate)_ LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment far Right Turns For pasted speeds at or under45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right tum facilities are warranted, see Figure 3-1 fordesign criteria. FIGURE 3-26 WARRANTS FOR RIGHT TURN TR2EATMENT (2-LANE HIGHWAY) Rev. '1f'15 For the left turn warrant analysis, the morning situation was analyzed as it had the highest left turns into the site and the highest advancing volume of cars. With 16 left turns into the site and an advancing volume of 669 vehicles, a left turn lane is warranted. A left turn lane currently exists in this location. WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAY Sao = IOU CL 600 W Soo J 0 > 400 u, Wu Q CL CL 200 0 0 > 100 Conclusions: ■■■■■■■■■■■E�■■■■■■■■■■■■AAA■ ■ ■■■■■■■■■■■■�■■■■■■■■■■■■■a■■ �- _ ■ 'was was ■■ son Plum ■■ MEN ■■A■■■■■■■ i■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ 5=200' No Left -Turn Lane 200 400 600 800 10G0 VA ADVANCING VOLUME (VPH) An initial enrollment of up to 100 students would not warrant right turn lane improvements at this location. A maximum enrollment of 124 students would warrant right turn lane improvements at this location but is not proposed at this time.