Loading...
HomeMy WebLinkAboutSDP200400087 Calculations Minor Amendment 2004-11-2971-1�L 152Ac. J. 57/4, NOV 19,9 2004 COMMUNRY DEVELOPivEMT STORMWATER DRAIN DESIGN COMPUTATIONS PROJECT: SHOPPERS'WOPLD DATE: 11/29/2004 All Pipes are RCP (n-20.013) unless othemise noted, DESIGNER: Terra Partners - AGF FROM TO D.A. RUNOFF 0 FF COEF. CA INLET 1( '0) 100) Q(1' Q(10) V(10) POINT TIME TIME -- INVERT ELEVATIONS LENGTH SLOP LENGTH SLOPE E DIA, CAPACITY 1(2) FLOW TIME POINT POINT AC7RES ACRES C INC.17N C ACC.* ACC.IN - MIN. /HR C.F.S.0 IN./HR C�FS. F.P.S. UPPER--7—L�� �ER Q(2) V(2) -TFN MIN. (j)T (1) _ _ t�L () _ 3) (4) 3 (5) (6) (5) 67) (7) (8) (8) (9)T ___END END FT. % (101 1 IlTi- -/1- IN. C.F.S. IN,/HR C,F.S. C.F.S.S� F.P.S. --- C INC ACC].. .7 REMARKS 4.64 1 44! 5,00 0.37 0.46 EX 0.44 1 1 : 5.00 � �44M562,00 r2 10-85 6.5 0.4�9=K.4-7 3.15 3. 22 9.48 443.15— 442.65 10.06-- '-K-05 i-5-7 0 9 8 ----+--14.44 5.4 2=4 9 �.51 0.67 15 0,0 Time of Concentration Worksheet AREA B Overland Flow Time Source: Seelye Chart as modified in VDOT Drainage Manual (Fig. 1.5.1.1 on Page 1-13E) Notes: 1) Length of overland flow always <= 300 ft 2) Calculate a separate Tc for each ground cover condition along the flow path 200.00 Enter Length of Strip (ft) 10.00 Enter Slope (% or ft/100ft) 0.36 Enter Rational Method "C" value Sample "C" values: 0.22 Dense grass 0.28 Average grass 8.96 Result Tc (minutes) 0.36 Poor grass 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Source: SCS Velocity Graph as published in Virginia Erosion and Sedim( Handbook, Third Edition (Plate 5-2 on Page V-12) Notes: 1) Not intended for well-defined channels - see channel flow calculation 2) Calculate a separate Tc for each ground cover condition along the flow 260.00 Enter Length of Flow (ft) 6—.6-6 j Enter Slope (% or ft/100ft) 1.04 Result Tc (minutes) IF UNPAVED 0.81 Result Tc (minutes) IF PAVED Channel Flow Time Source: Kirpich Chart as modified in VDOT Drainage Manual (Fig. 1.5.1.2 Notes: 1) For small drainage basins. 2 For concrete channels, use 0.2*Tc 0.00 1 Enter Length of Flow (ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc (minutes) Part II - Rainfall Intensity (Albemarle County, Virginia) Return I nter Calculated Period I Duration I Intensity z 10.0 4.2 5 10.0 5.0 10 10.0 5.7 25 10.0 6.6 50 10.0 7.3 100 10.0 8.0 Control Page 1-14) Acceptable values for duration are between 5 and 60 minutes. Use values outside this range at risk. STORMWATER INLET COMPUTATIONS POPLAR GLEN 7/29/2004 Rev.11-10-04 Chapter 9 Storm Drains Appendix 9C-14 1 Performance Curve DI-7 in a Sump 10. 9w*j M .-o Source: 'VD 0 T C� OPEN AR—EA-7= --- 6—'-T— .OF 2 ,PERIMETER = 12.8 FT 5 10 DISCHARGE (CFS) Chapter 9 — Storm 'Drains Appendix 9C-14 Performance Curve D1.7 in a Sump ------------ 10. M7% LL 1.0 fr LU 0 OPEN EN AREA 6j0 F 2 P A � PEN AREA 6.0 FT2 IM T 0.1 PERIMETER 12 8 FT 5 10 DISCHARGE (CFS) Source: VDOT Chapter 9 - Str,.,, I;Jl� Appendix 9C.14 I Performance DI-7 in aiSurnp LL 10. 5.0 1.0 0.1 Source: -------- VDOT OPEN kR--E—A-= --- 6--j— .0 FTz PERIMETER = 12.8 FT 5 10 DISCHARGE (CFS) C FHWA urban Drai Project No. . Project Name.: Computed by : Inlets C1.TXT Drainage Design Program, ge of Highway Pavements Inlets on Sag Date: 11/29/2004 SHOPPERS` WORLD Roadway Cross S1 Sx Pavement SW Gutter C n Manning' W Gutter In a Gutter C Sag: Curb -Opening Inlet and Discharge Data HY-22 wmpusite/Dep Cross Slope (ft/ft) 0.0450 'oss Slope (ft/ft) 0.0830 Coefficient 0.016 dth (ft) 2.00 pression (inch) 1.00 ;Inlet Interception Inlet Type *Sag* T Width of'Spread (ft) L Curb -Opening Length (ft) H Curb -Opening Height (in) d_curb Depth atCurb (ft) Qi Intercepted Flow (cfs) Page 1 Curb -Opening 4.32 4.00 5.00 0.354 1.500 M C2.TXT FHWA urban 'Drainage Design Program, Drainage of Highway Pavements Inlets on Sag Date: 11/29/2004 Project No. ISHOPPERS'S WORLD Project Name.: Computed by Inl Roa Sx Sw n W a on Sag: Grate Inlet and Discharge Data Cross slope Pavement;Cross Slope (ft/ft) Gutter Cross slope (ft/ft) Manning' Coefficient Gutter width (ft) Gutter Depression (inch) Inlet Interception Inlet Type *Sages T Width ofISpread (ft) WGR Grate Width (ft) L d_ave Grate Length (ft) Depth of'`Flow (ft) d_curb Depth atCurb (ft) Qi Intercepted Flow (cfs) Page 1 HY-22 uniform 0.0500 0.0500 0.016 2.00 0.00 Parallel Bar P-1-7/8 2.42 2.00 2.00 0.071 0.121 0.340 455' _ 55 STORM C2 EX STORMTAB STA' 10+10 ClC1 10+72 RIM449.00 50 STA-10+Ob__ _._ RLM'_447__0.0_ INV ; OUT 445.00 RIM 446.8'3 INV, IN 44, .65 NV. IN 443.25 IN 443.15 — _ — — — — 450 INV. OUT442.55 4 f / „RCP @ 2.132 0 ---- , 62 ELF OF s 445 „ 10 LF OF 15" RCP @ 5.00% 440 10 LF _ RCP OF 15"_ _ .. ... .. ._..__,. 0 5 00 /o ._. ,._440 10+00 10+90 STORM C PROFILE SCALE; 1"=30' �I; 3"=5' V STORM A STA 1 o+oo RIM 439.60 INV. IN 435,001(15") INV. IN 435. 00! (151) 445 l--INV,---IN 435.15 (EX- -1,5"). . - INV. IN 432.001 (EX. 24") INV. OUT 431.05 (EX. 24"NORM B ) STORM D TA 10+24 STA 9+74 RIM 439.00 I RIM 439.00 1 INV. OUT 436, INV. OUT 4361.25 4401-1 ------ - 435 1 LF OF 1511II 214 LF OF 15" P @ 5.21% RCP @ 5,21% 9+70 10+00 10+30 SCALE: 445 435 LP ELEV = 489.44 LPSTA =10 I 05 PVI STA = 16+05 PVI ELEV = 4�9.34 455 i 'A.D.-8;00- - K = 1,25i 10, vc wl 450 ! _ > , _ _ _ _ . 0 I z -s 0 445 1 I Cl orr olo PVI STA = 10+25 PVI ELEV = 440.14 1 A.D.= 5.00- - 6 PVI STAI= 11+10 I PVI ELEV, = 447.79 A.D. -5.93 K 5 C)l a- LU jc? K�' oO''Lo Lo i (N 1q, Lo �4- 10+00 10+90 ENTRANCE PROFILE SCALE: J"=,5U'j-j; 1 " =Y V 455 445 1\6 e r- K Cern eL- 1� Yel�- 6 rep, rc v. TERRA PARTNERS, I,IX CR7I. ENGINEERS LANDSCAPE ARCHITECTS LAND SURVEYORS 2. W, STREET, NE 'FiAR[A TLSVILU Ni GLVIA 22%2 FAX 534-296619'I SCALE: 11 1=100' ISSUED: 11-24'-04 DRAWNIIY: AGP REVISIONS: SHEET oI� 1