HomeMy WebLinkAboutWPO201900007 Bond Estimates 2015-12-01 Ana Kilmer From: John Anderson Sent Tuesday, December 01, 2015 11:01 AM To: Ana Kilmer Cc: Todd Shifflett Subject: RE:Old Trail, block 27,WP0201500042 ESC bond estimate, revised Ana, Thank you for questioning the Acreage. I've reconsidered. Please use original estimate that lists 6.38 Ac.,the .PDF sent yesterday. Please let me know if you have any questions. Thank you From:Ana Kilmer Sent:Tuesday, December 01, 2015 10:41 AM To:John Anderson<janderson2@albemarle.org> Subject: RE:Old Trail, block 27,WP0201500042 ESC bond estimate, revised The estimate doesn't show any acreage. Please review. We will need to resend to Dave Brockman. Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org From:John Anderson Sent:Tuesday, December 01, 2015 10:33 AM To:Ana Kilmer<akilmer@albemarle.org> Subject:Old Trail, block 27,WP0201500042 ESC bond estimate, revised Ana, Attached please find: Revised .PDF, ESC bond estimate Please replace ESC bond estimate sent yesterday. Confirm parcel 055E0-0 I-00-000A I —this is the only parcel to list on bonds. Please let me know if you have any questions. Thank you John E.Anderson,PE I Civil Engineer II Department of Community Development I County of Albemarle.Virginia 401 Mclntire Road I Charlottesville,VA 22902 434.296.5832 ext.3069 1 Ana Kilmer From: Ana Kilmer Sent: Tuesday, December 01, 2015 11:21 AM To: David Brockman (dave@oldtrailvillage.com); 'Bill Ledbetter';Jeffrey S. Hall Cc: John Anderson Subject: FW: Old Trail, block 27, WP0201500042 VSMP bond Attachments: ESC_bond OTV block 27_WPO201500042_113015.pdf Per John Anderson, attached is the original bond estimate (e-mailed to you previously) that needs to be bonded. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org From:Ana Kilmer Sent:Tuesday, December 01, 2015 10:36 AM To: David Brockman (dave@oldtrailvillage.com) <dave@oldtrailvillage.com>; Bill Ledbetter <BLedbetter@roudabush.com>;Jeffrey S. Hall <jhall@mcmllc.com> Cc:John Anderson<janderson2@albemarle.org> Subject:Old Trail, block 27, WP0201500042 VSMP bond Attached are the bond estimates that you requested. Please let me know how you plan to secure the bonds. The lickinghole fee is$5,046.87. Please make check payable to County of Albemarle and submit to my attention. I need to follow up with Glenn about the schedule of completion for bonded improvements form. He has not signed off on this form. Thank you Note. I will be out of the office 12/28/2015-1/1/2016. Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org Old Trail Village Block 27 Erosion Control and Stormwater Management Plan WPO file number: 2015-00042 Mitigation Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) 1 Mitigation Area-trees(canopy+understory) 43 Each $150.00 $6,450.00 2 Small shrubs&grasses(VDOT bid tab-2013,4 species,$x 2) 43 Each $50.00 $2,150.00 cost sum $8,600.00 foFet-mamt $0.00 contingency $860.00 14/.391200 Mitigation-wpo201500042-OTV_btock 27-113015 Total $9,460 11/30/2015 f • 4 Old Trail Village Block 27 Erosion Control and Stormwater Management Plan WPO file number: 2015-00042 Erosion and Sediment Control Bond Estimate Item Item 122,Unit Unit Cost Cost Number (installed] 1 stabtzation(PS,TS) [8.5-2.12 Ac(impervious)I .6.06 acres $5,000.00 $31,930.00 2 tree protection 0 d. 3..O ft $5.00 $0.00 3 silt fence(SF) 4'20)ft $5.00 31.000.00 4 safety fence(SAF) Olt $5.00 $0.00 5 diversion(DO,FD,RWD) 0 ft $13.00 $0.00 6 turbidity curtain(Upper Ballard Pond):ref katssafety.com i I l-:10-15 price) 80 ft $8.00 $639.98 6 temporary slope drain(TSD) Pipe length 0 n pipe diameter 0 in $0.00 $0.00 7 earthwork for Ex.SB Modtkadon treL A.George email:1 112012 915 1:24 PM] 8 height of dam at foe 0 ft cut at high side 0 ft 9 height of fill at face 0 ft cut at face 0 ft 10 length of dam 0 ft length of cut 0 ft 11 top width 0 ft width of cut 0 ft 12 - =Gov=:,:;:. . . 0 at (area below transition; 0 sf 13 Alt',of 3 0 ft (total width of cut) O ft 14 . :t•:a am 0 ft (depth below transida 0 ft 15 :arFwr• 0 sf (area above transition 0 sf 16 0.0 cy (total fill volume) 0.0 cy 17 length of spillway 0 ft (TOAL CY estimate) 2600 cy $13.00 $33,800.00 18 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 31 silt fence inlet protection(IP) 1 $100.00 32 stone inlet protection(IP) 27 $5,400.00 33 outlet protection(OP)-ref rio-rao.olaccd.length 0 ft width 0 ft 0 • $0.00 34 charnel(SCC,matted) length 0 ft width 0 ft $0.00 35 deck dam [33-101 depth in channel 0 ft channel width 0 ft 0 $0.00 36 construction entrance(CE) 0 $0.00 37 wash rad( 1 $2.000.00 38 paved construction entrance • 1 • $3.500.00 39 rip-rap,placed(OP1) depth 1.5 ft length 24 ft 40 width,Ave. 20 (tons) 41.4 tons $60.00 $2.484.00 41 filter fabric(below riprap) width 24 length 25.0 68.88687 sy $3.10 $206.67 42 survey and layout(price per 0.1 mi.) acres 8-38 traps and basins 1 $3,690.00 43 mobilization $500.00 44 stream crossing(computed independently) $0.00 Cost Sum S85,220.655 Pr grit $0.00 ESC bond OTV block 27 WP0201500042 113015 contingency $8,522.07 • 1 C it(. / q 3 350 Total $93,750 Tr're,: • ) 03 , 2.1 D 11/30/2015 .. -) \i'',‘ i, (-:1 0