HomeMy WebLinkAboutWPO201900007 Correspondence 2020-01-22 ROUDABUSH, GALE & ASSOCIATES, INC. A
ari A PROFESSIONAL CORPORATION S P
LAND SURVEYING Serving Vitginiia Since 1956
ENGINEERING
LAND PLANNING ENGINEERING DEPARTMENT SURVEY DEPARTMENT
172 SOUTH PANTOPS DRIVE,STE.A 914 MONTICELLO ROAD
JIM L.TAGGART,P.E. CHARLOTTESVILLE,VA22911 CHARLOTTESVILLE,VA 22902 WILLIAM J.LEDBETTER,L.S.
PHONE(434)979-8121 PHONE(434)977-0205
DON FRANCO,P.E. FAX(434)979-1681 FAX(434)296-5220 BRIAN D.JAMISON,L.S.
DUSTIN GREENE,PE NICHOLAS M.HUTCIIINSON,L.S.
AMMY M.GEORGE,PLA INFO rr ROUDABUSH.COM
January 22, 2020
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville,Virginia 22902
RE: Old Trail Village Stream Buffer Mitigation Master Plan (WP02019-7)
On January 3, 2020, I have performed a field verification of the mitigation plantings around
Upper Ballard Pond in Old Trail Village. I certify that the plantings have been installed in
accordance with the approved.mitigation plan.
The planting area around Upper Ballard Pond is shown as Planting Area#1 in the Old Trail
Village Stream Buffer Mitigation Master Plan (WP02019-7) on pages 5 and 6 of the plan set,
which accounts for 130,878 sf of stream buffer mitigation plantings.
Planting Area#1 accounts for the planting areas required by the following mitigation
bonds:
WP014-47 .. 43,026 sf
WP015-42 5,740 sf
WP02016-9 (71% of the 115,610 sf) 82,112 sf
Total 130,878 sf
Sincere ,
f .r
` \ RECEIVED
Am rr y G 4 org•,; PLA
• JAM 23MO
COMMUNITY
DEVELOPMENT