HomeMy WebLinkAboutSUB201700091 Review Comments Preliminary Plat 2017-08-03 (2)Short Review Comments Report for:
SUB201700091 — Old Trail Creekside V - Preliminary
SubApplication Type: I Preliminary — Residential
Date Completed: 07/19/2017
Reviewer: Cameron Langille Division: CDD Planning
Review Status: Denied
Reviews Comments:
...................................................................................
Date Completed:
Reviewer:
Review Status:
Reviews Comments:
06/19/2017
Michael Dellinger
No Objection
Division: CDD Inspections
Date Completed: 06/22/2017
Reviewer: Elise Kiewra Division: CDD E911
Review Status: Requested Changes
Reviews Comments: isee uploaded letter for comments, per site plan dated 6/5/17
Date /06/ 0 Completed: 7 2 17
p 0
Reviewer: Willis Bedsaul Division: VDOT
Review Status: Requested Changes
Reviews Comments: 11. Please provide sight distance profiles on the plans.
.................................................
Date Completed: 07/17/2017
Reviewer: Shawn Maddox Division: Fire Rescue
Review Status: Requested Changes
Reviews Comments:
Date Completed
Reviewer:
Review Status:
Reviews Comments:
Fire Rescue has no objections to the plans dated 6/5/2017. See comments below:
1. Thank you for addressing on street parking - one side of both streets proposed in this phase shall
3e marked as no parking.
2. A flow test will be required for the new hydrants prior to final approval.
07/27/2017
Alexander Morrison Division: ACSA
Requested Changes
I am recommending approval of the preliminary subdivision plat with the following conditions:
• Water/sewer construction plan review required at the final site plan stage. Submit 3 copies of the
plan along with water/sewer data sheets to the ACSA.
• RWSA Wastewater Capacity certification required at the final site plan stage.
• Dedication of Creekside 3 Phases 2 & 3 required before final site plan approval.
Date Completed:
p
08 3 2017
/0 /
Reviewer:
Victoria Fort Division: RWSA
Review Status:
Requested Changes
Reviews Comments:
• An RWSA wastewater flow capacity certification will be required prior to final site plan approval.
...................
Date Completed:
07/13/2017
Reviewer:
Emily Cox Division: CDD Engineering
Review Status:
Requested Changes
Page: 1 of 2 County of Albemarle Printed On: March 17, 2020
Reviews Comments:
- Provide authorization to use offsite SWM facility since this facility is owned by another entity.
- Easements will be required for any offsite grading.
- W PO Plan & Road Plan approval will be necessary before final plat approval.
- VDOT entrance permit will be required.
- VRRM spreadsheet provided says 3.54 Ib/yr phosphorus removal required, but plan and summary
say 3.23 lb/yr.