Loading...
HomeMy WebLinkAboutWPO201800092 Correspondence 2020-03-24COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ?434.293.3719 PH 434.293.2813 FX www.collins-engineering.com March 20, 2020 Emily Cox, P.E. County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Foothill Crossing Phase VI West — WPO 201800092 REV 2 Comments Dear Ms. Cox: Thank you for your comments dated March 4, 2020. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: A. Stormwater Pollution Prevention Plan (SWPPP) 1. Comment previously addressed. 2. Comment previously addressed. 3. The total limit of disturbance is 7.06 acres. The disturbance for the site is 6.03 acres, with an additional 1.03 acres required off -site for the installation of the emergency accessway. This 1.03 acres is covered by the limits of disturbance approved with Foothill Crossing II VSMP Amendment #2, WP0201700020. B. Pollution Prevention Plan (PPP) 1. Comment previously addressed. C. Stormwater Management Plan (SWMP) 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. A `Proposed Variable Width SWM Facility Easement' is now labeled on sheet 7 in the `Detention Basin Detail'. The easement encompasses the access road, retaining walls and the basin. The easement has been made more visible. The easement has been simplified and the storm drain easements have been removed from the SWM easement. 6. Comment previously addressed. 7. Comment previously addressed. 8. It is acknowledged nutrient credits will need to be purchased prior to construction. This purchase will be made within the next couple of weeks and the paperwork will be provided. 9. It is acknowledged a SWM maintenance agreement must be executed before plan approval. The applicant will coordinate this with Ana Kilmer. 10. It is acknowledge. The easement will be platted with the final subdivision plat. This plat has been prepared and will be submitted shortly for review. 11. Comment previously addressed. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. The buildable areas are now shown outside the buffers on the SWM Post -Development sheet. 16. A mitigation plan is now provided for the roadway and grading disturbance to the buffer, see sheet 5A. 17. The existing conditions sheet now properly shows the existing adjacent pond and the approved Foothill Crossing II plan currently under construction. 18. MH2 and MH1 have been shifted as far west as possible to reduce disturbance to the buffer. 19. The full design for the proposed culvert is provided with the Final Site Plan — this sheet is now included with this VSMP. 20. The areas in the VRRM spreadsheet include the undisturbed Forest and Open Space (0.25 acres), plus the (6.03 acres) on -site disturbance associated with this registration statement for a total of 6.28 acres in the VRRM analysis. An additional 1.03 acres of disturbance is required off -site for the emergency access road, and is included within the existing limits of disturbance approved with Foothill Crossing II VSMP Amendment #2 WPO201700020. 21. Dan Mahon has been contacted for approval of the greenway. The greenway is not on this property, and will be dedicated with the development plans of the future sections of Foothills and Glenbrook. D. Erosion and Sediment Control Plan (ESCP) 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Comment previously addressed. 6. Comment previously addressed. 7. The sequence of construction and details for the installation of the culvert under the emergency access road is now included in the plans. 8. The Army Corps of Engineers permit for work in the stream is underway, and this permit information shall be provided shortly. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE