Loading...
HomeMy WebLinkAboutSDP202000031 Correspondence 2020-03-23 (2)608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.1800 Charlottesville, VA 22903 www.timmons.com March 23, 2020 Christopher Perez County of Albemarle Dept. of Community Development 401 McIntire Rd, North Wing Charlottesville, VA 22902 RE: Boys & Girls Club - Northside — Initial Site Plan Review — SDP202000011- Comment Response Letter Dear Mr. Perez: We have reviewed your comments dated March 4, 2020 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Planning (Christopher Perez): 1. [4.2, 4.2.3, 4.2.5, 33.44] The current design relies on critical slope disturbance throughout the site. Prior to initial site plan approval, the Board of Supervisors shall act on this special exception to permit the disturbance requested. The applicant shall request deferral of the site plan till the Special Exception for Critical Slopes is acted on by the Board of Supervisors. Per letter dated March 16, 2020 from Megan Nedostup, the initial site plan has been approved. The applicant will continue to pursue the Special Exception for Critical Slopes until it is approved by the Board of Supervisors. 2. [LOD201900018, 32.5.2(b)] Determination of Use. Remove all reference to "community center" from the site plan and replace the use with "Boys and Girls Club, operation of before and after -school care provided on behalf of a public school". The structure may be used for community center uses only if a special use permit for a community center is approved. A special use permit has not been approved for this use. The use has been revised. See Sheet C0.0. 3. [32.5.2(a)] The plan provides two different sheets labeled C4.0, revise to provide only one C4.0 relabel the other sheet appropriately. Sheets have been relabeled as requested. The second sheet C4.0 is now C4.3. 4. [32.5.1(C), 32.5.2(n)] Dimensions. Dimension the proposed building. The proposed building has been dimensioned. See Sheet C4.1. S. [32.5.2(b)] Height. Remove the proposed building height of "45 FT from lower level to top of stairs" as the building heights are not measured from the rear of the building. Building height information has been revised as requested on Sheet C0.0. ENGINEERING I DESIGN I TECHNOLOGY 6. [32.5.2(a)] Provide the names of the owners, zoning districts, tax map parcel numbers, and present uses of abutting parcels. Owners, zoning districts, tax map parcel numbers, and present uses of parcels have been provided for both the subject property and the abutting parcels on Sheet C2.0. 7. [32.5.2(e)] Landscape features. Provide the existing landscape features as described in section 32.7.9.4(c). Existing landscape features are labeled on the landscape plans. See Sheets 1-1.0 and 1-1.1. 8. [32.5.2(e)] Landscape features. On all plan view sheets provide labels identifying whether the existing wooded areas are composed of evergreen, deciduous or a mix of types of trees. Existing landscape features are labeled on the landscape plans. See Sheets 1-1.0 and 1-1.1. 9. [32.5.2(f)] Indicate whether the site is located within the watershed of a public water supply reservoir. Indication that the site is located within a public water supply reservoir has been added to Sheet C0.0. 10. [32.7.2.3] Sidewalk. Continue the proposed sidewalk further along Lambs Lane towards Jouett Middle School. Sidewalk has been provided within the site as well as adjacent to the site entrance. There is currently no sidewalk in the vicinity of the project on either side of Lambs Lane to which the proposed sidewalk can feasibly connect. 11. [32.5.2(i)] Streets. Provide the state route number of Lambs Lane. Provide the width of Lambs Lane. The state route number and width of Lambs Lane have been provided on Sheet C2.1. 12. [32.5.2(j)] Existing sewer facilities. Depict the existing sanitary sewer facility/pump station that the proposed use is connecting to with a force main. Depict the existing facility's location and size. The existing sanitary sewer pump station has been shown on Sheet C2.1. 13. [32.5.2(m)] Ingress and egress. Show the distance to the centerline of the nearest existing street intersection from the propped ingress and egress. The distances to the nearest existing street intersections have been shown on Sheet C4.0. 14. [32.5.2(k)] Provide flow arrows in all storm drainage pipes. Flow arrows for all storm drainage pipes have been shown on Sheets C5.0 — C5.2. 15. [32.5.2(I)] Depict, label, and dimension all utility easements. Proposed utility easements have been shown on Sheets C4.1— C4.3. Proposed drainage easements have been shown and labeled on Sheets C5.0 — C5.2. 16. [32.5.2(I)] Provide the location and width of any existing or proposed utilities and utility easements including telephone, cable, electric and gas. Indicate the deed book and page reference for all existing utility easements located on the property. There are no existing utilities or utility easements impacted by the proposed project. Proposed utilities and easements have been shown on the plans. See Sheets C4.1— C4.3 as well as Sheets C5.0 — C5.2. 17. [32.5.2(j)] Provide the deed book and page references for any and all existing water, sewer, wastewater or storm drainage systems easements that are located on the property. There are no existing utilities or utility easements impacted by the proposed project. 18. [32.5.2(p), 32.7.2.1] The proposed entrances shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the proposed entrances to the site shall be required prior to final site plan approval. Per email with Adam Moore (3/10/20), VDOT's comment is a recommendation rather than a requirement, as no permit is required to work on a bus loop road. We have reviewed both the existing topography of Lambs Lane and proposed grading of the Boys & Girls Club entrance. In order to not steepen Lambs Lane significantly, the proposed entrance has been set to mimic the existing grades to the greatest extent practical. Proposed contours and slopes have been provided on Sheets C5.1 and C5.4. 19. [32.5.2(n)] Any proposed outdoor lighting must be shown on the site plan. A photometric plan and lighting cut sheets must be provided with the final site plan. Proposed lighting must comply with requirements of Sec. 32.7.8 & Sec. 4.17 of the Zoning Ordinance. In addition to meeting all lighting requirements a standard lighting note will be required. Site lighting and photometrics have been provided. See Sheets L3.0, L4.0, and L4.1. 20. [32.5.2(n)] If there is to be a sign for the proposed use, on the final site plan depict and label the sign location. (Depicting the sign on the final site plan is not approval of the sign location or type). A sign is proposed near the entrance off Lambs Lane. See Sheet C4.2. 21. [32.7.9.5] Street trees. Provide street trees in the 6' landscape strip adjacent to the sidewalk which connects to Jouett Middle School. Street trees have been provided. See Sheet 1-1.1. E911 (Brian Becker): 1. No Objection. Albemarle County Building Inspections (Michael Dellinger): 1. Note 29 Sheet C-1 is incorrect, reflect proper codes. Note 29 has been revised on Sheet C1.0. 2. In addition to the accessible vehicle signage on Sheet C1.1, provide detail of accessible parking spaces along with access isles. A detail for accessible parking spaces has been provided on Sheet C1.1. 3. Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. The requested note has been added to Sheet C1.0. 4. Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. The requested note has been added to Sheet C1.0. 5. Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. The requested note has been added to Sheet C1.0. 6. Verify accessibility requirement compliance to all facilities and areas in accordance with the following: https://codes.iccsafe.org/content/VCC2015P2/chapter-11-accessibility, https:Hcodes.iccsafe.org/content/ICCA117_12009. Verified. Albemarle County Dept. of Fire Rescue (Shawn Maddox): 1. A knox box will be required, please add a note indicating this requirement. A note has been added to Sheets C4.1— C4.3. 2. The access road along the rear of the structure and the travel lane along the front of the building must be marked as a fire lane. Fire lane markings have been added to the access road in the rear of the structure as well as the travel lane along the front. Painted curbing and fire lane signage are proposed for the travel lane along the front of the building. Because the access road along the rear is only proposed for emergency access, only fire lane signage has been proposed for this area. See Sheets C4.1— C4.3 3. ISO needed fire flow must be provided. ISO needed fire flow will be provided in a future submission. 4. A current fire flow test must be provided prior to final acceptance. A fire flow test has been provided on Sheet C1.2. VDOT (Adam Moore): 1. Slope of intersection appears to be in excess of 8% and does not meet the minimum requirements for intersecting crossroad grades. (See RDM pg. F-48, section 4, pg. F-88 & AASHTO Green Book, section 9.4) Suggest pulling the proposed contours up the road to allow for a landing area at the intersection. Per email with Adam Moore (3/10/20), VDOT's comment is a recommendation rather than a requirement, as no permit is required to work on a bus loop road. We have reviewed both the existing topography of Lambs Lane and proposed grading of the proposed entrance. In order to not steepen Lambs Lane, the proposed entrance has been set to mimic the existing grades to the greatest extent practical while allowing drivers to safely make the turn into the proposed Boys & Girls Club. Proposed contours and slopes have been provided on Sheets C5.1 and C5.4. ACSA (Richard Nelson): 1. Submit 3 copies to ACSA for review. 3 copies have been provided to ACSA with this submission. 2. Provide fixture counts. Fixture counts will be provided in a future submission. 3. Show existing pump station. The existing sanitary sewer pump station has been shown on Sheet C2.1. 4. Show water utilities on landscape plan. Water utilities have been shown on the landscape plan (Sheet 1-1.0). SDP2020-00011 Albemarle Countv Engineering Services (John Anderson -Engineer): 1. VSMP/WPO plan approval is required prior to Final Site Plan approval. WPO202000005 is under review. Note: Applicant made critical slopes waiver request; based on information submitted, including Applicant email, 02/27/2020 4:05 PM, Engineering supports critical slopes waiver request. Acknowledged. 2. Stream buffers exist on parcel. Requirements listed at Ch. 17, Article VI, Stream Buffers, apply. Acknowledged. The stream buffer has been shown and labeled on Sheet C2.1. C1.1: 3. Flush curb detail indicates —10" base. Please confirm depth of base and identify base material (asphalt, asphalt type; stone type). Curb details on Sheet C1.1 have been updated to match VDOT standards. 4. Similarly, VDOT Std. CG-3/CG-2 details indicate —10" base, each typ. section. Identify base material and depth of each layer if base is a mixed stone/asphalt composite. Curb details on Sheet C1.1 have been updated to match VDOT standards. 5. C1.2: Include VDOT SL-1 detail (safety slab). VDOT SL-1 detail has been provided on Sheet C1.2. 6. C2.0: Show and label stream buffers. The required stream buffer has been shown and labeled on Sheet C2.1. C4.0: 7. This plan sheet appears twice; please label 2nd occurrence C4.3. The sheets have been relabeled as requested. 8. Revise CG-2 to CG-6 along south side of heavy-duty asphalt access, S side of building. Gutter is required to convey drive aisle/access/parking area storm runoff. Curb alone is insufficient. (18-4.12.15.g.) CG-2 has been replaced with CG-6 along the southern side of the access road. See Sheet C4.1. 9. Label Jouett MS main building, to orient project. Jouett MS has been labeled on Sheet C4.0. 10. Label Ivy Creek School main building. Ivy Creek School has been labeled on Sheet C4.0. C4.1: 11. Since proposed 8' (Max. ht.) retaining wall N of main parking area supports infrastructure (parking), sealed geotechnical retaining wall plans are required prior to FSP approval. Please ref. retaining wall checklist for plan reviewers (Attached). Acknowledged. Sealed retaining wall plans will be submitted with future submission. 12. Label typical narrowest width dimension of 19 proposed curvilinear parking spaces. Typical parking space dimensions have been provided on Sheet C4.1. 13. Provide bollard at double -doors opening to 5' sidewalk and flush mount curb on south side of building to protect occupants existing blindly to sidewalk without visibility east, of approaching vehicles. Place left of door, on exiting. Recommend bollards both right and left. At a minimum, provide bollard to left on exiting. Bollards have been added as requested. See Sheet C4.1. A detail for the bollards has been provided on Sheet C1.0. 14. Provide evidence of coordination and approval from ACSA concerning design approval of sanitary sewer pump station connecting via 6" new force main to Ex. Pump station alongside Jouett Middle School. Sanitary sewer pump station and force main plans have been submitted to ACSA with this submission. See Sheets C8.0 — C8.3. 15. Consider sequence and pedestrian safety needed during force main construction. Provide narrative and details to protect visitors to Jouett MS (parents, teachers, students, etc.). Sequencing and safety will be at the forefront of construction. Force main construction adjacent to Jouett will most likely take place during the summer, when parents, teachers, and students are not present. Additional notes have been provided on Sheets C8.0 — C8.3. 16. (C4.1, C5.0, C5.2): Label proposed storm lines downstream of 70-1f and 700-1f x 96" DIA CMP underground detention systems public drainage easements. Provide easement plat, showing SWM facility, facility access, and public drainage easements. Public drainage easement must extend to a natural drainage feature, or to the property line. Storm easements have been shown and labeled on Sheets CS.O — CS.2. An easement plat will be provided with a future submission. 17. For both detention systems, provide overland relief to protect improvements against flooding, and critical slopes against erosion in event of weir plate obstruction. Design overland relief to convey 10-year event. Assume complete bypass of systems, should one or both become non -operational. SWM1 would overflow to structure 202 if the weir plate was obstructed. In this case, this overflow drainage would make its way south and end up in Ditch C, which would then convey it to SWM2. If the weir plate in SWM2 became obstructed as well, the drainage would overflow to structure 402. This structure is more than 1' below the adjacent building FFE, so no impact to the building is anticipated. Ultimately, this drainage would overtop the curb and sheet flow south down the slope. Due to the proposed grading, this overflow drainage would not channelize. While it is important to consider all possible outcomes, it is very unlikely that this situation would occur; Boys & Girls Club will enter into a Stormwater Maintenance Agreement with the County to ensure that the underground detention systems maintained and monitored so that the weir plates never become fully obstructed. For this reason, and those listed above, we believe adequate protection is provided for both site improvements and critical slopes. 18. C4.1, C5.0, C5.1: Revise CG-2 to CG-6 at all locations where storm runoff collects against a curb. CG-2 alone is insufficient. (18-4.12.15.g.) CG-2 has been replaced with CG-6 where collecting storm runoff. See Sheets C4.1— C4.3. 19. Recommend revise parking drive aisle grade slightly, provide DI at pipe 209 intersection with CG-6 (rev. CG-2) in front of N side of building. Proposed grade requires exact construction to bend drive aisle runoff between contours 543 and Str. 206. A more reliable design (a recommendation) is to direct runoff to a new DI at pipe 209 (rev. CG-2 to CG-6 between Str. 234 and new DI, then CG-2 after new DI); then, after new DI, provide grade directing runoff to Str. 206. Water flowing across a paved surface tends to travel straight. A likely better long-term drainage design that more nearly meets expectations for pavement/drainage performance is to collect runoff traveling west at a new DI, then collect runoff traveling north in parking aisle/areas N of the building. Collection of concentrated flow at main entrance to facility avoids ice which is likely consequence of sheet flow over this distance, west then north, if proposed pavement grade is constructed. At entrance to the building, pipe 209 is immediately below, and for slight expense, a DI may greatly reduce risk to patrons, including children unaware of risk or hazard of black ice in winter. Ditch F has been added to ensure that additional drainage does not make its way to the drive aisle directly in front of the building. Additionally, CG-6 has been added to the entirety of the eastern internal parking island to more effectively convey the water coming down the sloped drive aisle to structure 206. As a result of these improvements, we do not believe an additional structure is needed in front of the building. C4.1, C4.2: 20. Label underground detention systems. If Mfr. System, include name of Mfr. In plan or profile view. (If Mfr. System, for VSMP/WPO plan, include recommended installation guidelines, maintenance, and periodic inspection guidelines.) Underground systems have been labeled. Mfr. system details will be provided with a future submission. 21. For VSMP and final site plan, ensure manway entries to underground facilities permit visual check of weirs without entry. Manways should provide check of SWIM facility operation, especially weirs. Do not place SWIM facility manways in a designated parking or loading space. Manholes are provided near the weir plates for both SWM facilities that would allow visual check of weirs without entry. Neither manhole is located within a designated parking or loading space. See Sheet C5.0. 22. Add FM (force main) size descriptor (6" DIA). FM size and material descriptor has been added to Sheet C4.2. 23. Ensure Nyloplast pipes and risers are identified and labeled. Provide Nyloplast typical construction installation and periodic maintenance and inspection guidelines. Nyloplast structures have been labeled on Sheets C7.0 and C7.1. Periodic maintenance and inspection notes have been added to Sheet C1.0. 24. Provide drainage calculations (LD-229, LD-204) for all storm pipes and inlets. Drainage calculations have been provided for all storm pipes and inlets with this submission. 25. Provide, show, label basketball court fencing. Fencing has been shown and labeled on Sheet C4.2. 26. C4.3: Label loading area/s, if any. Bus loading/unloading areas have been shown on Sheet C4.1. C5.0: 27. Revise proposed contours, consistent with grading required to install Ditch B. Grading for Ditch B has been shown on Sheet C5.0. A cross section, as well as ditch calculations, have been provided on Sheet C5.1. 28. C5.0, C5.2, proposed 2:1 slopes on critical slopes do not, for the moment, appear to include reverse slope benches. Ensure contours and labels guide construction of reverse slope benches. Notes have been added to all grading sheets requiring that fill slope benching is provided where proposed slopes are 2:1. Details for the proposed slope benching have been provided on Sheet C5.2. 29. Provide EC-3, pipe or concrete channel section at proposed 90-degree change in direction of runoff proposed for Ditch D. Ditch D has been revised with an additional drainage structure at the 90-degree change in direction. See Sheet C5.0. 30. (C5.0, C5.1, C5.2): Provide guardrail (VDOT GR-1) with typ. Details along south side of heavy-duty asphalt access located on south side of building. Although CG-2 is proposed, proposed grading is an unrecoverable slope. Guardrail is required. VDOT guardrail has been provided along the south side of the access road. See Sheet C4.1. 31. C5.2: Revise aisle grade on south side of building between contour elevations 534 and 516 to concentrate flow against CG-6 curb (revise CG-2 to CG-6) for reasons of practicality and safety stated elsewhere. Proposed grade assumes sheet flow over 18-ft vertical interval when effort should be made to eliminate runoff from this drive aisle (place against curb) rather than design to spread runoff across entire width of the drive aisle. Aisle has been graded so that the southern side is 2% lower than the northern side. Additionally, CG-6 has been provided along the southern edge to convey drainage. See Sheet C5.3. Drainage will concentrate along the CG-6 until it reaches structure 402. 32. C5.0, C5.2: Label proposed slopes (3:1, 2:1) south and west of building. Slopes steeper than 2:1 are impermissible. Slopes have been labeled. See Sheet C5.2. 33. Engineering recommendation to approve waiver to impact critical slopes (south and west of building) requires design incorporate construction standards at 18-30.7.5, including reverse slope benches. Acknowledged. Notes have been added to all grading sheets requiring that fill slope benching is provided where proposed slopes are 2:1. Details for the proposed slope benching have been provided on Sheet C5.2. 34. Increase separation between pipe 303 and back face of retaining wall, especially at NW end of wall; see image. Separation between pipe 303 and the back of the proposed retaining wall has been increased. See Sheet C5.0. 35. Provide and define ditches/channels formed by proposed/existing contours N of playfield, and elsewhere (blue arrows, images below). Note presence of critical slopes immediately downslope of many locations. Grading has been revised so as not to channelize water where proposed grade meets existing grade. See Sheet C5.0. C5.1, C5.2: 36. Provide channel design for ditches formed by existing /proposed grade. Ref. images, below. Grading has been revised to limit channelization of water where proposed grade meets existing grade. In the case shown below (Sheet C5.2), an existing channel exists in this area. Proposed grading mimics existing grade to the largest extent practical, while reducing channelization in the proposed condition. ` FlLL SLOPE DENONINO REQUIRED ON ALL PROPOSED 2:7 SLOPES SEE SHEET C6.7 FOR DETAILS 37. Show full extent of proposed grade, south of SE corner of basketball court. Grade=? An inset has been added to Sheet C5.2 to show full extent of proposed grade. C5.4: 38. 18-4.12.19.b. (Drainage Plan checklist, drainage item 7): Revise contours to prevent storm runoff running through dumpster enclosure. Recommend direct pad to drain to a surface stone (French) drain to right of pad, then exit surface drain via curb cut to drive aisle surface. Minimize contamination of stormwater runoff due to contact with solid waste. The dumpster area has been regraded, and a drain has been added (structure 244) to collect runoff from the enclosure. See Sheet C5.0. 39. Consider highlight section downslope runoff without, in most cases, defined grade to intercept runoff prior to curb, or sidewalk. Provide capture/conveyance in locations with 7', 10' or 15' vertical interval leading to sidewalk, curb, basketball court, or heavy-duty concrete. Ditch E has been added to direct drainage towards structure 216 rather than onto the sidewalk and basketball court. Ditch F has been added to direct drainage towards structure 232 rather than onto the drive aisle. See Sheets C5.1— C5.2. 40. Provide curb or hardscape edging between earth slopes and heavy-duty concrete east of main building (image, above). A curb has been added as requested. See Sheets C4.1— C4.2. C7.0, C7.1: 41. Recommend plan note emphasize compaction requirements beneath pipes or MHs entirely in fill section; prior VDOT specification would be appropriate. (Str. 402, 404, 501, RD3, nearly all Str. 412 — SWM2A): A note has been added to Sheet C7.0 as recommended. 42. Include safety slab label in storm profiles for MH ht. >12-ft. Str. 102, 108, for example. Safety slabs have been called out for MH ht. >12'. See Sheet C7.1. VDOT SL-1 detail has been provided on Sheet C1.2. 43. Recommend VDOT anchoring of storm pipe that approaches 16% grade. Conservative design, care, and precautionary measures for storm pipe installed at steep grade on critical slopes are appropriate. VDOT drainage manual, p. 9-37. The proposed outfall pipe layout has been revised so that the slope does not exceed 12% at any point. As a result, VDOT anchoring is not required. 44. SWMI — Str 100: Label reverse slope bench. A note has been added to profile Sheets C7.0 and C7.1, calling out the required slope benching on all proposed 2:1 slopes. The note references the slope benching details provided on Sheet C5.2. 45. Label SWM1 and SWM2 in plan view (C5.0). SWM1 and SWM2 have been labeled on Sheet C5.0. 46. Show/label riprap in profile at outfall Str. 100. Riprap has been shown and labeled in profile on Sheet C7.1. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, Kim Mellon Project Engineer