HomeMy WebLinkAboutSDP200400023 Minutes 2004-10-27ACTIONS
Board of Supervisors Meeting of October 27, 2004
November 3, 2004
AGENDA ITEM /ACTION
ASSIGNMENT
1. Call to Order.
Meeting was called to order at 4:05 p.m., by the
Chairman, Mr. Dorrier. All BOS members were
present. Also present were Bob Tucker, Larry
Davis and Ella Carey.
2. Work Session: Groundwater Ordinance.
Clerk: Advertise public hearing for December
HELD.
8, 2004.
3. Recess.
The Board recessed at 5:05 p.m.
4. Call to Order.
Meeting was called back to order at 6:06 p.m.,
by the Chairman. All BOS members were
present. Also present were Bob Tucker, Larry
Davis, Wayne Cilimberg and Ella Carey.
7. Appeal: SDP - 2004 -023. Faulconer Construction
Clerk: Set out 8 conditions below.
Office and Shop Final Site Plan.
DENIED SDP - 2004 -023, by a vote of 6:0, with
the inadequacies and requirements set forth in
the Planning Commission's actions dated
September 13, 2004, conditions #1 through #7,
with condition #8 as modified at the Board
meeting. Should the applicant satisfy the eight
conditions, staff is requested to bring the final
site plan back to the Board for review to make
the determination that the eight requirements
have been met. The determination required by
condition no. 8 shall be made by VDOT.
8. From the Board: Matters not Listed on the Agenda.
There were none.
9. Adjourn.
The meeting was adjourned at 9:45 p.m.
/ewc
Attachment 1 — SDP - 2004 -023 Conditions
ATTACHMENT
Agenda Item No. 8. Appeal: SDP - 2004 -023. Faulconer Construction Office and Shop Final Site
Plan. TM 58, P 37, contains 27.37 acs. Znd U. Loc on Morgantown Rd (Rt 738) approx 1 -1/8 mi W from
intersect of Morgantown Rd & Rt 250 at Ivy. Samuel Miller Dist.
1. Submission of a revised Certified Engineers Report as required by Section 32.7.4.2, to address
each provision of Section 4.14, explaining methodology and including measurements of actual
equipment where appropriate.
2. Submission of as -built plans and structural analysis to verify adequacy of pavement width
and strength of Dettor Road from Morgantown Road to the Faulconer entrance as
provided by Section 26.12.1.
3. Provision of street trees across Morgantown Road frontage as required by Section
32.7.9.6.
4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or
bayberry, planted 15 feet on center adjacent to Rural Area property to provide screening as
required by Section 32.7.9.8.c.2.
5. The lighting plan shall be revised to comply with Section 4.17.4.
6. Sidewalk notes and dimensions must be corrected.
7. Revise all buffer notes to indicate a 50 foot buffer.
8. Pavement widths and strengths of both internal and external roads shall be adequate to
accommodate projected traffic generated from the site as provided by Section 26.12.1 of the
Albemarle County Code.