Loading...
HomeMy WebLinkAboutSUB201700091 Calculations 2017-06-05 OLD TRAIL CREEKSIDE V- CONCEPTUAL STORMWATER MANAGEMENT CALCULATIONS PACKET Date of Calculations JUNE 5, 2017 PREPARED BY: COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com Lots 1-5 Soil Mapping 44 It" - cow,.. i -'t A . ft,.• )1t. 'r .rw 111/ I 1 it1111116...miiihnii: r Lots 1-5 Soil Types Albemarle County,Virginia(VAO03) Map Map Unit Name Percent Unit of AOI Symbol 7B Braddock loam,2 to 7 percent 87.8% slopes 8C3 Braddock clay loam,7 to 15 8.9% percent slopes,severely eroded 81B Thurmont loam,2 to 7 3.3% percent slopes Totals for Area of Interest 100.0% Note:The soils' properties for this development are predominantly composed of hydrologic group type B. Lots 6-12 Soil Mapping lit / I f 21,-- - o ; ` �-.... . ' . X i' • t . - ..;• --,,, : „._ f. ' / t ' ' It .' i -r111 , - ",fa Alp i• t �� •/ d M iilig i tit rye f 1 M. Lots 6-12 Soil Types Albemarle County,Virginia(VAO03) Map Unit Map Unit Name Percent Symbol of AOI 78 Braddock loam,2 to 7 100.0% percent slopes Totals for Area of Interest 100.0% Note:The soils' properties for this development are predominantly composed of hydrologic group type B. DEQ Virginia Runoff Reduction Method Water Quality Calculations (COMPLIANCE IS MET THROUGH THE BEST MANAGEMENT PRACTICES OF PROTECTING FOREST & OPEN SPACES, A CONTRIBUTION TO THE LICKINGHOLE BASIN FUND AND THROUGH THE PURCHASING OF NUTRIENT CREDITS) Summary of Phosphorous Removal Compliance: Total Phosphorous (TP) Load Reduction Required: 3.23 lbs/yr. TP Load Removed Through Protected Forest & Open Space Easements 0.31 lbs/yr. TP Load Removed Through Contribution to the Lickinghole Basin Fund 0.88 lbs/yr. TP Load Removed Through Purchasing Nutriet Credits 2.04 lbs/yr. 3.23 lbs/yr. DEQ Virginia Runoff Reduction Method Nest,Development Compliance Spreadsheet-Version 3.0 F:2011 BMP Standards and Specifications 02013 Draft BMP Standards and Specifications Project Name: Old Trail Creekside V-Preliminary Subdivision Plat CLEAR ALL data input calls Date: 6/5/2017 _ constant values BMP Design Specifications List:2011 Std s&Specs akuletion ells Site Information final results Post-Development Project(Treatment Volume and Loads) Land Cover(acres) A Soils B Soils C Soils D Soils Totals Forest/Open Spate lanes)--undisturbed, protected forest/open space or reforested land 0.00 aoo Managed Turf(acres)--disturbed,graded for yards or other turf to be mowed/managed 7.33 7.33 Impervious Cover(acres) 1 82 1.82 9.15 Constants Runoff Coefficients(Rv) Annual Rainfall(inches) 43 A Soils B Soils C Soils D Soils Target Rainfall Event(inches) 1.00 Forest/Open Space 0.02 0.03 0.04 0.05 Total Phosphorus(TP)EMC(mg/L) 0.26 Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen(TN)EMC(mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 Target TP Load(lb/acre/yr) 0.41 PI limitless correction factor) 0.90 Post-Development Requirement for Site Area TP Load Reduction Required(Ib/yr) 3.54 LAND COVER SUMMARY-POST DEVELOPMENT Land Cover Summary Treatment Volume and Nutrient Loads Forest/Open Space Cover(acres) 0.00 Treatment Volume 0.2663 (acre-ft) Weighted Rv(forest) 0.00 Treatment Volume(cubic feet) 11,598 %Forest 0% TP Load(lb/yr) 7.29 TN Load(lb/yr) Managed Turf Cover(acres) 7.33 Ilnforma[ional Purposes Only) 52.13 Weighted Rv turf) 0.20 If Managed Turf 80% Impervious Cover(acres) 1.82 Rv(impervious) 0.95 %Impervious 20% Site Area(acres) 9.15 Site Rv 0.35