BOND INSPECTION REQUEST
APPROVED PLAN #WP0201800041
PROJECT NAME: Hark Winery Production Building
(As listed on the approved plan)
This is to request that an inspection be performed by the Cotinty. Where fees are assessed, a fee is required for
each inspection. Please check the inspections requested.
VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per
Water Protection Ordinance Section 17-207& 208 $250
0 Subdivision (roads,drainage,etc.)per Subdivision Ordinance section 14-43. 5 and 14-438; $269
0 Water& Sewer per Subdivision Ordinance section 14-435 $269
0 Site Development Performance bond(Incomplete Site Work 8z. Landscape Maintenance) $301
TOTAL FEES $250
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road, North Wing,Charlottesville,
VA 22902,Attention: Management Analyst-Phone 434-296-5/332;.Fax.434-972-4126. MI roads and
stomywater facilities will require construction record drawings, inspection reports,and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held.until•acceptance of all bonded'improvements, For Site Development Performance bonds, if
landScape.installation is part of the bonded incomplete site work, a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to;
EMAIL: aaron@harkvineyards.com •
OR REGULAR MAIL ADDRESS:
. ,
_
Signature of 0%iiner/Deve!opt!r
• "
Aaron Hark 1/12/2020
Print Name Date
Revised 7/15/20 14,7r20n0;5, I /3/2015