Loading...
HomeMy WebLinkAboutWPO201800041 Bond Bond Inspection 2020-01-13 Date Received: 1262-4ee Paid: L, A Received by: AKC- , ,&A„ 40,S,ww. • Intake: Forward to Management Analyit Agar' /7/hG11"0 BOND INSPECTION REQUEST APPROVED PLAN #WP0201800041 PROJECT NAME: Hark Winery Production Building (As listed on the approved plan) This is to request that an inspection be performed by the Cotinty. Where fees are assessed, a fee is required for each inspection. Please check the inspections requested. VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance Section 17-207& 208 $250 0 Subdivision (roads,drainage,etc.)per Subdivision Ordinance section 14-43. 5 and 14-438; $269 0 Water& Sewer per Subdivision Ordinance section 14-435 $269 0 Site Development Performance bond(Incomplete Site Work 8z. Landscape Maintenance) $301 TOTAL FEES $250 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road, North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5/332;.Fax.434-972-4126. MI roads and stomywater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held.until•acceptance of all bonded'improvements, For Site Development Performance bonds, if landScape.installation is part of the bonded incomplete site work, a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: aaron@harkvineyards.com • OR REGULAR MAIL ADDRESS: . , _ Signature of 0%iiner/Deve!opt!r • " Aaron Hark 1/12/2020 Print Name Date Revised 7/15/20 14,7r20n0;5, I /3/2015