Loading...
HomeMy WebLinkAboutSUB201900158 Correspondence 2020-03-27 (2)® COLLINS ENGINEERING March 18, 2020 Tori Kanellopoulos Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Spring Hill Village Road plans (SDP 201900068) `200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 j 434.293.3719 PH 434.293.2813 FX ( www.collins-engineering.com Thank you for your comments dated December 17, 2019 on the above referenced project. Below are our responses to the remaining comments on the road plans. Planning: 1. A new variation has been submitted for review, reverting back to the original application plan for the development. The site plan is in conformance with the updates, per the variation request. It is understood that the final site plan will not be approved until the variation has been approved by the BOS. 2. The variation that has been submitted also addresses the removal of the cul-de-sac. The private roadway right of way has been extended to the southern property line, as requested by VDOT, to provide a connection for future development. 3. Cu.,_—, N, __y Qu , .....u. 4. Comment previously addressed. 5. The variation that is currently under review also addresses the setbacks within the development. New setbacks have been established with the variation that will be easier to enforce during the building permit process, and the setbacks are more in line with the current Albemarle County setbacks for the other zoning districts in the county. 6. The yard drains have been relocated outside of the 20' landscaping easement along the southern property line to provide a full 20' buffer where the rear lots are adjacent to the property line. 7. The acreage of the blocks have been added to sheet 3 and sheets 4 and 5. In addition, the cover sheet has been updated to show the block areas as well. The variation updates to the block acreages back to the original block acreages from the rezoning, prior to variation #1, and the block acreages as shown in the final site plan are within the permissible 15% variation of the block size allowed by the Code of Development with respect to the original block acreages. 8. The central park has been updated to an area of 1.0 acres. The variation addresses the size of the central park and the other pocket parks and open space throughout the development. 9. Comment previously addressed. 10. Comment previously addressed. 11. Comment previously addressed. 12. Cr -eviously addre 13. A subdivision plat is currently under review for the project. The plat will be recorded and the Deed book and page numbers shall be added to the easements once the plat is recorded. It is acknowledged that the final site plan will not be approved until the subdivision plat is approved. 14. This comment is acknowledged. The water and sewer plans are approved, and the contractor is currently installing the infrastructure. These improvements will be bonded with the subdivision plat. 15. The existing conditions sheet has been updated to show the county's steep slope overlay, as requested. 16. C _,viously addresse 17. The proffers have been revised, as requested. 18. As noted in comment #14, this comment is acknowledged. The water and sewer plans are approved, and the contractor is currently installing the infrastructure. These improvements will be bonded with the subdivision plat. 19. The landscaping plan sheets will be submitted separately for the project for review. They are being completed now with the proposed amenities for the project. 20. This note has been added to Sheet 5 — site plan. See note #14 on this sheet. 21. This comment is acknowledged. The WPO plan is approved, but an amendment shall be processed for some final changes to the plan. The road plans are currently under review for approval as well. 22. The right of way dedication area along Route 20 and Route 742 are shown on sheet 3, and sheets 4 and 5. These areas are labeled on these sheets as well. 24. This comment is acknowledged. 26. The comments have been addressed as followed: A. The sidewalk has been extended as far as possible to TMP 90-27, while still allowing the grading to tie-in between the improvements and the existing topography on their property within the VDOT easement. We have built the improvements as far as we could for the tie-in connections and when this property is developed, they will be able to tie-in to our improvements within the right of way and make the connection. B. The proposed grading has been modified because the original grading and road plans were not VDOT approvable. The existing design for the Rt. 20 improvements was lacking the details and necessary design for VDOT approval, as outlined in the final site plan comment letter to Alan Franklin back around 2013. That design was not approvable. We have worked with VDOT to design an approvable Route 20 improvement plan for the access into the site, and the grading is a result of these improvements that are approvable by VDOT. While the grading may not be exactly the same, the concept and intent of the Route 20 improvements is the exact same. C. The 8' sanitary sewer has been extended to the property line of TMP90-27 along the private road (Berwyn) for the utility connection to the adjacent property. D. A note has been added to the plans to relocate the overhead power lines underground. E. Street trees have been added and shown along Route 20 behind the sidewalk, as requested. F. A 6' planting strip has been provided along Route 20. 27. The comments have been addressed as followed: A. The sidewalk has been extended as far as possible to TMP 90-27 and TMP90-35A1, while still allowing the grading to tie-in between the improvements and the existing topography on their property within the VDOT easement. We have built the improvements as far as we could for the tie-in connections and when this property is developed, they will be able to tie-in to our improvements within the right of way and make the connection B. The 5' sidewalk has been revised to an 8' asphalt path, as requested. C. Street trees have been designed along the pathway. D. A 6' planting strip has been provided along Route 742. 28. An overlot grading plan was part of the VSMP plan and is part of this site plan. The grading and overlot grading is shown on sheets 8 and 9, and required. 29. All the planting strips are now shown and labeled. 30. The grading has been updated to remove any grading on to TMP 90-27B. 31. The overall park area has been increased from the required 2.68 acres to 2.93 acres throughout the project. With the increase in area, a small portion of the Park #1 is being utilized as a dry retention area. This area will also be landscaped as part of the overall park amenity areas. In addition, the area of the pocket park #1 has increased from 0.64 acres to 0.68 acres to accommodate the 0.04 acres that is within dry detention basin. This is also included in the variation request. 32. The comment is acknowledged. The final subdivision plat will be recorded prior to the approval of the final site plan. 33. As noted in comment #14 and #18, this comment is acknowledged. The water and sewer plans are approved, and the contractor is currently installing the infrastructure. These improvements will be bonded with the subdivision plat. 34. As noted in comment response #7, the acreage of the blocks have been added to sheet 3 and sheets 4 and 5. In addition, the cover sheet has been updated to show the block areas as well. The variation updates to the block acreages back to the original block acreages from the rezoning, prior to variation #1, and updates the overall phasing for the blocks within the development. 35. The width of the landscaping easements along the northern and southern property lines have been increased to 20' wide, except for the location of the alley and private street. The alley and private street are shown in the location as noted on the original approved site plan. 36. The landscaping plan is being updated to include the proposed site amenities for the project. A substitution request shall also be submitted for review with this project to reduce the number of tot lots and substitute them for additional amenities. 37. A 6' landscaping and maintenance easement has been provided along the right of way in front of the residential lots to ensure adequate room for the proposed street trees. The easement will be platted with the subdivision plat. 38. The declarations of covenants, conditions, and restrictions is being submitted with the final subdivision plat and will be recorded with the subdivision plat, prior to the final site plan approval. 39. The planting strips along Route20 and Route 742 have been updated to 6' planting strips and labeled as 6' planting strips. 40. All the open space areas and pocket parks have been updated, in accordance with the proposed variation and reverting back to the pocket parks with the original site plan from the rezoning. 41. All the open space areas and pocket parks have been updated, in accordance with the proposed variation and reverting back to the pocket parks with the original site plan from the rezoning. 42. The road detail has been updated to show and label the sidewalk along Dauphin Drive to be 5' in width. 43. The asphalt paths and sidewalks have been updated to be consistent with the overall plan, between the layout sheets, grading sheets, and landscaping sheet. 44. The title of the plans has been updated with the site development plan number included on the cover sheet title. Engineering: 1. An updated WPO amendment plan will be submitted for the project. The grading plan included in the final site plan is also the overlot grading plan that will be included in the WPO amendment. This plan meets the requirements for the overlot grading plan. 2. The comment is acknowledged. The road plan is under review for approval. 3. The seal has been signed and dated, as requested. 4. The private streets and public street labels have been updated to match the road plans and original application plan. 5. The approved application plan for the rezoning included perpendicular parking spaces on the private streets. The proposed development plan matches the approved rezoning plan, and includes the perpendicular parking spaces. Since this was an approved design with an application plan that was part of the rezoning, the applicant requests that the approved application plan serve as the approval that perpendicular parking spaces will be allowed for this development. 6. The wall designs are being finalized now, and will be submitted to the county with a building permit plan for review. A copy of the wall designs will be provided to engineering as well. 7. The grading has been updated for the development and all the grading along the northern and southern property lines have been pulled back away from the property line to provide room for the construction and Erosion and sediment controls. 8. All the retaining walls have been updated and removed from the lots, except for the retaining wall that is specific for the individual lot grading. 9. A guardrail has been added to the alley, as requested. 10. The grading has been updated and positive slope away from the foundation of the townhouse units has been achieved with the updated grading of the lots. 11. The grading has been updated to show positive drainage to the yard drains and inlets within the development. 12. All the yard drains and inlets are shown within easements. 13. The velocity of the storm drains have been updated so the velocities doe not exceed 15 fts. 14. The trees have been adjusted way from the storm and utilities within the development. ARB 1. The development is currently under review with ARB. Building Inspections 1. The requested note has been added to sheet 5 of the site plan. VDOT: 1. It is noted on the cover sheet that the Access management Exception has been approved for the entrance onto Route 20 with the proximity to the commercial entrance. 2. The streets with the perpendicular parking spaces along them are all private streets. The labels have been updated. 3. The mid block pedestrian crossing has been removed. 4. The sidewalk crossing at lot 89 has been updated. 5. The barricades have been shown and labeled on the plans. 6. The right of way for Berwyn has been extended to the property line. 7. The sight line from Loyola along Berwyn has been updated to 280 as requested. 8. The curve data and PT, PC has been added to the layout sheet. 9. The sight line is correct. The sight line distance is measured along the centerline of the road to the point that is 280' from the intersection, which was done. That is the sight line for the project at this intersection. 10. The route 20 improvements design has been updated for the 60 mph design on the road plans, and the road plans are referenced on the site plan. 11. The sidewalk is shown as 8' along route 20, due to the current proffer for this design. 12. A central mailbox has been shown and added to the plans in the central park area adjacent to Berwyn Street.' 13. The sanitary sewer is not located in any of the public roads. The other roads are private, and the sewer can be installed along the private roads. The labels have been updated. 14. The pavement note has been added to the plans. 15. The storm drainage structures have been updated and they are no longer deeper than necessary. 16. The inlets have been updated as required for the deeper manholes. 17. The HGL has been added to the plan sheets. 18. The grading has been updated and also shown on the cross sections. All the grading remains within the right of way. 19. This comment is acknowledged, and a note to this affect has been added to the plan sheets. 20. The sight distance has been updated for the 665 feet and shown on the road plans. 21. The trees have been positioned in accordance with the proximity to the intersections. 22. A note has been added about the HOA maintaining the landscaping. 23. A note has been added to the plans about the speed limit sign. 24. The entrance radii have been labeled for the Gropen commercial entrance. 25. This comment is acknowledged. 26. This comment is acknowledged. GIS 1. The Warwick Court road name has been changed, as requested. ACSA 2. Plans are approved, pending recordation of offsite utility easement. Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE