HomeMy WebLinkAboutWPO201900060 Calculations 2020-03-30UVA Foundation — Discovery Drive Development COUNTY OF ALBEMARLE, VIRGINIA VSMP WP02019-00060 DESIGN CALCULATIONS & NARRATIVE MARCH 27, 2020 TIMMONS GROUP !R VISION ACHIEVED THROUGH ❑URS. Prepared by: Craig Kotarski, PE Timmons Group 608 Preston Ave, Suite 200 Charlottesville, VA 22903 434.327.1688 o CRAIG Wv r. KWARSKI Lic. NO. 0402048507 �3127120� .'IONXL d� Table of Contents Section Title Project Narrative 2 Pipe and Inlet Computations LD204, LD229, LD347 3 Pipe Calculations For existing pipe under Lewis & Clark Drive LD229 for 10 year and 100 year storm 4 Drainage Subbasin Map — Developed Condition, Flat Branch — Tributary to North Fork Rivanna River, UVA Research Park at North Fork 5 Lewis and Clark Drive — Stormwater Management Exhibit for Pond 1 6 USGS Geological Survey — Earlysville Quadrangle 7 Ultimate Buildout Conditions Exhibit 8 Final Site Plan — Sheet C6.1 — Stormwater Management Quantity Project Narrative: This project will be constructed in two phases. Phase 1 includes the construction of a building addition and associated drainage, utilities, and landscaping at 1725 Discovery Drive. The limits of disturbance totals 0.47 acres for this phase. Phase 2 includes the construction of a new metal building, additional parking, as well as associated drainage, utilities, and landscaping between 1725 and 1670 Discovery Drive. Also included in Phase 2 of this project is the construction of the "Air Building". This is an anticipated project addition that is still being designed. Understanding that this Air Building would be just over 1 acre of impervious area, the limits of disturbance of the full Phase 2 of this proposed project totals 2.71 acres for this phase. The total limits of disturbance for this project totals 4.10 acres. Overall, the site drains through a pipe system to Analysis Point 1 and ultimately outfalls to a large wet pond (Pond 1) southeast of the site. Stormwater Management Summar: Per the document titled "Stormwater Management / BMP Analysis and Floodplain Study for the UVA Research Park at Northfork" by Dewberry & Davis, October 1997, the research park ponds have been master planned to handle both stormwater quantity and quality requirements for the future build -out of the research park. The applicability of the pond is conditioned on the pond being built as designed, and the CN value remaining within the plan approved CN value. This Dewberry & Davis document lists approved curve numbers and drainage areas based on the estimated future developed condition of the UVA Research Park. Per the sheet "Drainage Subbasin Map — Developed Condition, Flat Branch — Tributary to North Fork Rivanna River, UVA Research Park at North Fork," dated July 23, 1997 (Section 4), the proposed development falls within Subbasin C2. Subbasin C2 consists of 85.84 ac with a CN value of 82 (see Table 1). "UVA Research Park — Pond 1 Analysis" dated March 27, 2020 demonstrates that Pond 1 was built to satisfy water quantity and quality requirements. Additionally, the proposed CN value remains within the plan approved CN value. This development drains to the wet pond designated as Pond 1 in the "Lewis and Clark Drive - Stormwater Management Exhibit for Pond 1" prepared December 19, 2018 by Timmons Group (Section 5). This document lists approved curve numbers and drainage areas based on the updated developed condition of the UVA Research Park. The subject property falls within area C2 on this map. Drainage area C2 consists of 83.90 ac with a CN value of 67 (see Table 1). Based on the USGS topographic map (Section 6) for Earlysville, Virginia, the overall watershed draining to Pond 1 is approximately 450 acres. Analysis downstream of Pond 1 is unnecessary since the project limits of disturbance (4.10 acres) is less than 1% of the pond drainage area. Area C2 was analyzed to determine the change in impervious and pervious surface area resulting from this proposed Discovery Drive Development. These values have been incorporated into the previously approved overall CN value for the drainage area. This proposed development results in a net +2.52 acres impervious area which increases the CN value to 69. This remains significantly below the approved full build out development plan CN value of 82. Both water quantity and quality requirements for this site will be met by utilizing the existing Pond 1. Existing Channel Adequacy Summary The existing natural channel was analyzed according to 9VAC25-870-97.B and 9VAC25-840-40.19. Per the NRCS Web Soil Survey, the soil type along the entire channel is 36C — Hayesville Loam, which assuming the top layer of loam has washed away, is clay. From Table 5-22 (VESCH), the permissible velocity for stiff clay is 5.0 feet per second. The estimated ultimate development conditions of the drainage area utilizing this channel are illustrated in the Exhibit in Section 7. Based on the cross sections presented in the plans on Sheet C6.1 (included as Section 8), and considering ultimate development conditions, the following criteria are met. 1. The 2-year velocity routed through the channel does not exceed 5 FPS at any section. 2. The 10-year water surface elevation does not overtop the channel at any section. Therefore, the channel is adequate to handle the stormwater conditions resulting from the estimated ultimate development conditions, which includes this proposed development. Approved Drainage Areas and CN Values 7/23/1997 Area (Ac.) CN Al 57.25 79 A2 12.61 64 131 54.48 72 B2 48.56 80 C1 27.38 80 C2 85.84 82 D1 12.33 78 D2 84.03 86 E1 27.8 81 E2 17.28 83 F1 66.44 91 F2 31.64 91 G1 48.9 92 G2 49.05 92 Proposed Drainage Areas and CN Values 3/27/2020 Area (Ac.) CN Al 56.35 60 A2 11.77 55 131 49.59 50 B2 47.79 67 C1 31.15 42 C2 83.90 69 D1 9.55 51 D2 81.90 70 E1 28.71 55 E2 16.91 38 F1 64.97 53 F2 30.75 54 G 1 47.53 76 G2 49.25 72 Table 1 — Drainage Areas and CN Values FORM LD 204 STORMWATER INLET COMPUTATIONS SHEET 1 OF 1 LD204 PROJECT UVAF DISCOVERY DRIVE DESIGNER: KAM DATE 3/27/2020 CHECKED: AA UNITS ENGLISH Sag Inlets Only INLETSOFT BY ENSOFTEC DATE: 3/27/2020 LD-229 STORM SEWER DESIGN COMPUTATIONS STORM FREQUENCY 70 PROJECT: UVAF DISCOVERY DRIVE LOCATION: ALBEMARLE COUNTY COUNTY: Charlottesville NOAA STATION: Designed by: KAM Checked by: UNITS ENGLISH PIPE NO. FROM POINT TO POINT DRAIN. AREA "A" Acre (3) RUNOFF COEFF. "C" (4) CA TOTAL INLET TIME Minutes (7) RAIN FALL In/HrCFS (8)(9) RUNOFF INVERT ELEVATIONS LENGTH ofPipe Ft. (12) SLOPE Ft./Ft. (13) SIZE (Dia. Or Span/Rise) In. (14) SHAPE Number ofPipes Capacity CFS (15) Friction Slope Ft./Ft. NORMAL FLOW FLOW TIME Sec. (17) REMARKS (18) INCRE- MENT (5) ACCUM- ELATED (6) 7ateralTotal Q UPPER END (10) LOWER END (11) Depth of Flow, do Ft. Area of Flow, An SgFt Hm Ft. Vn FdSee (16) En Ft. REFERENCE (1) STA. REFERENCE (2) STA. 300 TO EX 300 EX1 0.78 0.90 0.70 5.40 5.53 6.37 0.00 34.84 533.42 532.00 34.91 0.04068 24 Circular 1 49.43 0.02100 1.24 2.04 0.56 17.05 5.75 2.05 301 302 300 0.08 0.88 0.07 3.23 5.50 6.38 0.00 20.99 534.35 533.52 27.25 0.03046 24 Circular 1 42.77 0.00760 0.99 1.55 0.50 13.55 3.84 2.01 303 304 302 1 0.14 1 0.87 0.12 3.16 5.42 6.41 0.00 20.54 535.68 534.45 1 56.07 0.021941 24 1 Circular 1 1 36.30 0.00730 1.08 1.72 0.52 11.91 3.28 1 4.71 307 308 1 306 0.75 0.39 0.29 0.29 5.00 6.54 0.00 1.92 539.50 539.00 28.19 0.01774 15 Circular 1 9.32 0.00080 0.39 0.32 0.22 5.98 0.94 4.72 309 310 305 0.02 0.50 0.01 0.01 5.00 6.54 0.00 0.07 539.00 536.80 11.11 0.19802 8 Circular 1 5.83 0.00000 0.05 0.01 0.03 5.76 0.57 1.93 311 312 300 0.00 0.00 1.47 5.20 6.48 0.00 9.63 536.90 534.15 112.21 0.02451 15 Circular 1 10.96 0.01980 0.91 0.96 0.37 10.07 2.48 11.14 313 TRENCH 312 1.66 0.89 1.47 1.47 5.00 6.54 0.00 9.63 540.00 537.00 119.13 0.02518 15 Circular 1 11.11 0.01980 0.90 0.95 0.37 10.19 2.51 11.69 315 316 EX2 4.34 0.20 0.87 0.87 5.00 1 6.54 1 0.00 5.68 537.98 537.82 15.77 0.01015 15 Circular 1 7.05 0.00690 0.85 1 0.89 0.37 6.39 1.48 2.47 400 TO EX 400 EXIST 1.26 0.88 1.11 1.11 5.00 6.54 0.00 7.26 534.29 533.10 48.21 0.02468 15 Circular l 10.99 0.01120 0.74 0.76 0.35 9.57 2.16 5.04 Ex 24 CPP 306 304 0.78 0.90 11 .70 3.03 5.28 6.45 0.00 19.76 538.97 535.76 111.34 0.02883 24 Ci-lar l 1 41.61 0.00680 0.97 1.51 0.49 13.07 3.62 8.52 EX TO 306 EX 1 1306 5.04 0.40 2.03 2.03 5.00 6.54 0.00 13.27 544.23 538.97 I92.70 0.02730 24 Circular I 40.49 0.00300 0.79 1.15 0.42 11.54 2.86 16.70 EX2-EX7 EX2 EX7 2.90 0.51 1.47 2.34 5.04 6.54 0.00 15.30 537.71 534.08 121.70 0.02983 24 Circular 1 42.33 0.00410 0.83 1.24 0.44 12.39 3.21 9.83 EX7-EXl EX7 EXl 5.69 0.39 2.22 4.56 5.21 6.48 0.00 29.67 533.86 531.89 133.00 0.01481 24 Circular l 29.83 0.01530 1.63 2.74 0.61 10.82 1 3.45 12.29 OUTFALL EXl I JOUTFALL 0.27 0.71 0.19 10.15 5.57 6.36 0.00 65.05 526.42 524.99 31.00 0.04613 30 Circular 1 95.44 0.02230 1.51 3.11 0.70 20.92 8.31 1.48 LD-347 PROJECT: UVAF DISCOVERY DRIVE DESIGNED BY: KAM HYDRAULIC GRADE LINE ANALYSIS Checked: AA INCIDENCE PROBABILITY Year INLET OR JUNCTION STA. INVERT EL. OUTFLOW PIPE DEPTH OF FLOW OUTFLOW PIPE OUTLET WATER SURFACE ELEV. DIA. PIPE Do (In/mm) DESIGN DISCH. Oo (CFS/CMS) LENGTH PIPE Lo (FtlM) FRICTION SLOPE, Sfo (FT/FT) (M/M) FRICTION LOSS Hf (Ft/M) JUNCTION LOSS SURFACE FLOW Adj. Ht 1.3 Ht (FtlM) Inlet Shaping? Y/N 0.5 Ht (FtlM) FINAL H (FtlM) Inlet Water Surface Elevation Top of MH Top of Inlet Elev. APPROX. Adjustment? V. Contr. Ho (FtlM) Vi Vi'2/2g Hi (Expn) 0.35'MAX. (Vi2/2g) SKEW Angle K Bend H (FtlM) Sum HL (FtlM) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 OUTFALL I 1 527.490 EX1 524.990 2.50 527.490 30 64.560 31.00 0.02207 0.684 20.881 1.693 16.694 4.327 1.515 0.0 0.00 0.000 3.207 1.219 3.207 YES 1.604 2.288 529.778 540.210 O.K. EX7 531.890 2.00 533.520 24 29.671 133.00 0.01532 2.038 10.823 0.455 12.385 2.382 0.834 0.0 0.00 0.000 1.288 14.369 1.675 NO 1.675 3.713 537.233 544.660 O.K. EX2 534.080 2.00 537.233 24 15.298 121.70 0.00407 0.496 12.385 0.595 6.391 0.634 0.222 0.0 0.00 0.000 0.817 9.620 1.063 YES 0.531 1.027 538.541 542.540 O.K. 316 537.820 1.25 538.820 15 5.678 15.77 0.00688 0.109 1 6.391 0.159 0.000 0.000 0.000 0.0 0.00 0.000 0.159 5.678 0.206 YES 0.103 0.212 539.032 543.220 O.K. 300 532.000 2.00 533.600 24 31.654 34.91 0.01744 0.609 16.694 1.082 13.550 2.851 0.998 0.0 0.00 0.000 2.080 0.000 2.080 YES 1.040 1.649 535.249 542.540 O.K. 302 533.520 2.00 535.249 24 20.986 27.25 0.00766 0.209 13.550 0.713 11.911 2.203 0.771 0.0 0.00 0.000 1.484 0.447 1.484 YES 0.742 0.951 536.199 542.150 O.K. 304 534.450 2.00 536.199 24 20.539 56.07 0.00734 0.412 11.911 0.551 13.074 2.654 0.929 0.0 1 0.00 0.000 1.480 0.782 1.480 YES 0.740 1.152 537.351 544.380 O.K. 306 535.760 2.00 537.360 24 19.757 111.34 0.00679 0.756 13.074 0.664 11.541 2.068 0.724 0.0 1 0.00 0.000 1.387 0.000 1.387 YES 0.694 1.450 539.940 549.290 O.K. 308 539.000 1.25 540.000 15 1.917 28.19 0.00078 0.022 5.978 0.139 0.000 0.000 0.000 0.0 0.00 0.000 0.139 1.917 0.180 YES 0.090 0.112 540.112 543.450 O.K. 312 534.150 1.25 535.249 15 9.630 112.21 0.01980 2.221 10.072 0.394 10.189 1.612 0.564 0.0 0.00 0.000 0.958 0.000 0.958 YES 0.479 2.700 537.949 542.590 O.K. TRENCH 537.000 1.25 538.000 15 9.630 119.13 0.01980 2.358 10.189 0.403 0.000 0.000 0.000 0.0 0.00 0.000 0.403 9.630 0.524 NO 0.524 2.882 540.899 541.880 O.K. EX 538.970 2.00 540.570 24 13.267 192.70 0.00306 0.590 11.541 0.517 0.000 0.000 0.000 0.0 0.00 0.000 0.517 13.267 0.672 YES 0.336 0.926 545.018 550.930 O.K. LD-229 STORM SEWER DESIGN COMPUTATIONS STORM FREQUENCY 10 PROJECT: Discovery Drive Development LOCATION: UVAF Research Park COUNTY: Albemarle NOAA STATION: Designed by: A Fontaine Checked by: UNITS ENGLISH PIPE NO. FROM POINT TO POINT DRAIN. AREA "A" Aare 3 RUNOFF COEFF. "C" 4 CA TOTAL INLET TIME Minutes 7 RAIN FALL In/fir 8 RUNOFF INVERT ELEVATIONS LENGTH of Pipe Ft. 12 SLOPE Ft./Ft. 13 SIZE (Dia. Or Span/Rise) In. 14 SHAPE Number of Pipes Capacity CFS 15 Friction Slope Ft./Ft. NORMALFLOW FLOW TIME Sec. 17 REMARKS (18) INCRE- MENT 5 ACCUM- ULATED 6 Lateral CFS Tom]Q CFS 9 UPPER END 10 LOWER END 11 Depth of Flow, do Ft. Area of Flow, An SgFt H. Ft. Vn Ft/Sec 16 En Ft. REFERENCE 1 STA. REFERENCE 2 STA. EX EW1 EW2 0.00 0.00 0.00 5.00 0.00 98.19 586.00 581.10 227.60 0.02153 72 Circular 1 621.42 0.00060 1.61 6.12 1 0.94 16.05 5.61 14.19 LD-229 STORM SEWER DESIGN COMPUTATIONS STORM FREQUENCY 100 PROJECT: 1725 Discovery Drive Development LOCATION: UVAF Research Park COUNTY: Albemarle NOAA STATION: Designed by: A Fontaine Checked by: UNITS ENGLISH PIPE NO. FROM POINT TO POINT DRAIN. AREA "A" Aare 3 RUNOFF COEFF. "C" 4 CA TOTAL INLET TIME Minutes 7 RAIN FALL In/fir 8 RUNOFF INVERT ELEVATIONS LENGTH of Pipe Ft. 12 SLOPE Ft./Ft. 13 SIZE (Dia. Or Span/Rise) In. 14 SHAPE Number of Pipes Capacity CFS 15 Friction Slope Ft./Ft. NORMALFLOW FLOW TIME Sec. 17 REMARKS (18) INCRE- MENT 5 ACCUM- ULATED 6 Lateral CFS Tom]Q CFS 9 UPPER END 10 LOWER END 11 Depth of Flow, do Ft. Area of Flow, An SgFt H. Ft. Vn Ft/Sec 16 En Ft. REFERENCE 1 STA. REFERENCE 2 STA. EX EW1 EW2 0.00 0.00 0.00 5.00 0.00 215.30 586.00 581.10 227.60 0.02153 72 Circular 1 621.42 0.00270 2.44 10.78 1 1.30 1 19.98 8.63 11.39 =e r 1725 DISCOVERY DRIVE . =W ; ��n , - E �: SUBBASIN C2 - , . 85.84 AC 1 0.1341 SQ. MI. 0.3474 SQ F",. O 9` CN=82 dpy ml u, .5 _ �y `�: - - �; o -�.! S G1 .. , I. �h1{ � �Y _ •Y �w ,� .��}. Ililf- 6 ' d = . m � "' �� • :. 'tryjy-r ra � Y .-h �, �� � J � - _ Y - � - �+.[�F_ . ,_ , � -_ - J- 70 Ro yl v y C ~ � G v7 � : ; �'y � - •• I.^ �-.'. •,i r��, � iMMeNy.' �$ � .�_ - - - '�'J _ . {� _y " � •I F 00 , i .. S -- _ .. r.nA ��. .s:taA �f A _ y ?. - - �� 4i-• - - is .a.a+ 'iy �\ _ , j•. —� _ _ y+F•��-:1' -'-r i s� - -- _ v � � rt - - .._f� :. - LIA �7 HiaY� � T� 1 � APP1Ce � i` -_ _ -~''~ •��- •- -_ L• -�-f —�_ ��_ Fes- ---'-- h_ �r...��{`��3 '.S- _ •�•z-� -- r•�y..- / -`r_ '� ``- - � _-' - j - 77 + _Piy. T E 29- - --- - - - • •fie-•�-_- - ',;._ ,.r. • - R --------- 1---------- \ t/ 1 i � \ 1 1 1 1 1 1 1 1 I 1 / 1 � / 1 � r I ---+ 81.90 70 'V4 I- y I 1 AREA D2 \ 64.94 63 I 1 / 1 / / \ I / 1 � 1 9.66 61 I I F / r 1 NOTE: DRAINAGE DIVIDES AND AREA NAMES ARE TAKEN FROM "STORMWATER MANAGEMENT/BMP ANALYSIS AND FLOODPLAIN STUDY FOR THE UVA RESEARCH PARK AT NORTHFORK" BY DEWBERRY & DAVIS, DATED OCTOBER 1997. 1725 DISCOVERY DRIVE LEGEND 171 HYDROLOGIC SOIL GROUP A, TURF ■ HYDROLOGIC SOIL GROUP A, WOODS HYDROLOGIC SOIL GROUP B, TURF HYDROLOGIC SOIL GROUP B, WOODS HYDROLOGIC SOIL GROUP C, TURF 01 U HYDROLOGIC SOIL GROUP C, WOODS r \ HYDROLOGIC SOIL GROUP D, TURF HYDROLOGIC SOIL GROUP D, WOODS IMPERMEABLE SURFACES AREA, IN ACRES CN VALUE / ARE 1 i DRAINAGE DIVIDE it AREA NAME JI I 47.79 67 \ AREA B2 1 \ I \ I I 1 1 I \ 1 1 / \ r \ 1 69 60 \ h` 1REA Bl \1 `�`, Y / r ; R� I / 1 / 1 1 1 i oar --- NP SCALE 1"=300' 0 300' 600' LEWIS AND CLARK DRIVE - STORMWATER MANAGEMENT EXHIBIT FOR POND 1 December 19, 2018 DISCOVERY DRIVE A BUILDABLE AREA = 3.6 AC ASSUME 80% IMPERVIOU; LRABLE AR = .44 AC �\ \ A ME 809% I R � ILD LE REA 1. AC\ / S UM 8096IMP RVI S > UVA FOUNDATION -DISCOVERY DRIVE DEVELOPMENT ULTIMATE BUILDOUT CONDITIONS FOR CHANNEL EROSION CONSIDERATION SCALE 1 "=150' OEM 0 150' 300' I If /tea' TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. i DRAINAGE AREA: 22.3 AC DRAINAGE AREA: 28.2 AC DRAINAGE AREA: 36.4 AC CN: 67 CIN 68 CN: 70 _ _ - TC: 26 MIN TC: 27 MIN TC: 28 MIN -- ----- - - - -_ __ ----- 2-YEAR Q: 16.77 CFS 2-YEAR Q: 22.01 CFS _ _ _ _ _- - - _ _ __ - _ `\ 2-YEAR V: 3.65 FPS 2-YEAR V: 3.43 FPS 2 -YEA Q: 3 .56 CFS 10-YEAR Q: 43.25 CFS 10-YEAR Q: 55.25 CFS 2-YEAR V: 75.6 FPS 10-YEAR ELEV: 523.45' -YEAR ELEV: 510.73' -YEAR Q: 75.61 CFS 10-YEAR ELEV: 502.00' 540 540 525 525 520 r r I , I , /,// IIII I'�'-I III -. -� J11 � � _ \ \� \\\••\\ \ � � 22V ADDITION I II III //�I IL - __ •� �� � `4`C .` i�_ / L IIIII IIIII II IIII I III I"% \ •,,METALI Il/ II 111\�1 \ vEV`. II v 111\II\\o\\\\\A" II Ii II r/I \I� \`i\Illilllllla C, b r /II II ' ----__-- - - / llb//II II11\� IIII I'Ill 1 \�� rII IIIIIIII• I / /III///IIII\' ____��i 111/ I III !!rlllr _ - j r¢ ' I I' III cL3- S_=�/��n• dAJ -- i,— '%'`'rTEA/T— l;AIRIBUI DINd !'IrIIII�, ,O9�'. . / �/i� - �/� / 4/' �'' l��llll ll IIII rll llrl '/�' . /, ,ii /�h, I�rhllil ��-- / ',' \ Ul�PAB ARF� ol �--- _ __ )� 11 IIII IIIIIII �\—p`\ C, �yQIIIIIIII/v`��v\v \\/\ ,� VAIII _ EWIS ma ANDICLA KID I I I >;�'_ _ �_A-� \ l' ( ■'� \\�-- - \\�\\ \\\ \ ��\. � \��\JC� l\`II IIII I II /��' '/i ��1 ���'=�,1\\\�1`� \\ \\ � - \ \ ■ - ���P\\`:. \ \o? y\\� `��O`l_'In �rl I I I \` �\ /�'iii//i�p /%S 1 IIllllu�do n4 'I �- \I,. 1 I III I a \ a� \\ • I I \� G� h0 ^ „�\ I 11 II IIII \\` �\���; j�%ii \II IIr! /%, IIII VIIII II I^pI yogy4+ • i` / IIII\ o^^x x�' II \ \\\ J`\�\`\\�\`�_-_= ~/i,111 IIIII 4. v°o\ / _n ulIlriy%%%/!/.» 11 sv rt;v, Nm3 t_ -- i_\\\\\ _ I I nnI 1\1 ✓'iue / �,`L �\� CHANNEL CROSS SECTIONS ,',' _= . `ON 'Ak 9+50 10+00 11+00 12+00 9+50 CROSS SECTION 1 HORIZ SCALE: 1"=50' VERT SCALE: 1 `5 DRAINAGE AREA: 44.6 AC CN: 72 TC: 29 MIN 2-YEAR Q. 43.57 CFS 2-YEAR V: 3.48 FPS 10-YEAR Q: 98.19 CPS 10-YEAR ELEV: 495.3V 515 10+00 D CROSS SECTION HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 510 510 \\\ 505 505 \ / 500 / 500 495 \ // 10-YR WSE=495.31' 495 490 490 s+So 10,00 11+00 12+00 CROSS SECTION 4 HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 SCALE 1"=80' 0 80' 160' 515 515 510 510 505 \If 505 10-YR WSE = 502.00' F/ \ 500 500 11+50 9+50 10+00 11+00 11+50 CROSS SECTION 3 HORIZ SCALE: 1"=50' VERT SCALE: 1 "=5 DRAINAGE AREA: 61.0 AC CN. 70 TC: 31 MIN 2-YEAR Q 50.02 CFS 2-YEAR V: 3.98 FPS 10-YEAR Q 118.95 CFS 10-YEAR ELEV: 481.57' 500 495 495 490 \ / 490 485 \ / 485 \ / 10-YR WSE = 481.57' 480 \ / 480 475 475 13+00 9+50 10+00 11+00 12+00 12+50 CROSS SECTION 5 HORIZ SCALE: 1 "=50' VERT SCALE: 1"=5 WATER QUANTITY ANALYSIS - CHANNEL ADEQUACY THE NATURAL CHANNEL WAS ANALYZED ACCORDING TO 9VAC25-870-97.B AND 9VAC25-840-40.19. PER THE NRCS WEB SOIL SURVEY, THE SOIL TYPE ALONG THE ENTIRE CHANNEL IS 36C - HAYESVILLE LOAM, WHICH ASSUMING THE TOP LAYER OF LOAM HAS WASHED AWAY IS CLAY. FROM TABLE 5-22 ESCH THE N ). PERMISSIBLE VELOCITY FOR STIFF CLAY IS 5.0 FPS. THE ESTIMATED ULTIMATE DEVELOPMENT CONDITIONS OF THE DRAINAGE AREA UTILIZING THIS CHANNEL ARE ILLUSTRATED ON THIS SHEET. THE SHADED AREAS REPRESENT THE BUILDABLE AREA AND THE ASSUMPTION IS THAT 80% OF THOSE AREAS WILL BE IMPERVIOUS. THE CN VALUE IS SLIGHTLY DIFFERENT AT EACH CROSS SECTION BASED ON THIS ESTIMATED DEVELOPMENT. BASED ON THE CROSS SECTIONS ABOVE, AND CONSIDERING ULTIMATE DEVELOPMENT CONDITIONS: • 2-YEAR VELOCITY ROUTED THROUGH THE CHANNEL DOES NOT EXCEED 5 FEET PER SECOND AT ANY SECTION. • 10-YEAR WATER SURFACE ELEVATION DOES NOT OVERTOP THE CHANNEL AT ANY SECTION, THEREFORE THE CHANNEL IS ADEQUATE TO HANDLE THE STORMWATER CONDITIONS RESULTING FROM THE ESTIMATED ULTIMATE DEVELOPMENT CONDITIONS, WHICH INCLUDES THIS PROPOSED SITE PLAN. ,�4NLIH OA � c� ccua w>•. xaraBxKr 5 Lic. Ne. O1V70M185D7 �7/ 20 AL of > E y E ¢ LL c 3 a�sW s>o°ry' zWVM 3 Is Na= 0 0 0 w w U 6 0 z 0 d O c7 z 0 f f 112112020 DRAWN BY A. FONTAINE DESIGNED BY A. FONTAINE CHECKED BY C. KOTARSKI SCALE Z Lu a 0 Lu Lu 0 Lu Lu O U UQ 1 Z O z O LL 44493 SHEET NO, C6.1 520 520 515 \ /10-YR WS = 510.73' 510 510 505 505 ^ pi O O O O \ 535 \ 535 \ 530 \ r 525 / 525 \ 10-VR WSE 523.45' / 520 520 h b M O O N IO VNi n VNi h H