Loading...
HomeMy WebLinkAboutSUB202000059 Correspondence 2020-03-27 (2)HIMPROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGINEERINGa January 15, 2018 Mr. Adam Moore, P.E. Virginia Department of Transportation 701 VDOT Way Charlottesville, VA 22911 Regarding: Eco Village Right & Left Turn Warrant Analysis Mr. Moore, Please find enclosed a left and right -turn warrant analysis for Eco Village off of Rio Road East (Rte. 631) between NCL Charlottesville and Pen Park Road. The following items are included with this report: • ITE Trip Generation Summary • Warrant Analysis Exhibit • OTISS Trip Generation Reports Our analysis shows that only a left turn lane is warranted for this project. If you have any questions you may contact me at justin a Justi eering.com or by phone at 434-953-6116. ineering, P.C. Eco Village is proposed to be a 37 unit development of multifamily housing located off of the 0.94 mile segment of Rio Road East between NCL Charlottesville and Pen Park Road. According to VDOTs 2016 Traffic Data, this segment of road has an AADT of 11,000 with a K and D factor of 0.0942 and 0.6911, respectively. This data was used to determine the peak hour volumes along Rio Road. The predominant direction of traffic was assumed to be west into Charlottesville in the morning and east in the evening. Below is the ITE trip generation summary table that was used to determine the PHV right and left turns. Using the direction factor, the number of cars entering was split between left and right turns. The traffic generated from the site was also added into the peak hour vdume of Rio Road East. Table 1. ITE trip generation summary table AM PM Use Description ITE Qty in out Total in out Total Multifamily Housing (Low -Rise) 220 37 6 16 22 17 9 26 Total 6 16 22 17 9 26 The information in Table 1 was retrieved from OMSS trip generation services. Figures 3 and 4 at the end of this document display original data from their website. Figure 1. Warrant for left turn treatment (2-lane highway) WARRANTS FOR LEFT TURN LANES ON TWO-LANE HIGHWAY VPH ADVANCING VOLUME OPPOSING VOLUME 5%6 1Cr% 20% 313% LEFTTURNS LEFTTiIRNS LEFTTURNS_EFTTJRW. 40-MPH DESIGN SPEEC* 801) 331) 240 180 15D 001) 411) 305 225 200 40D 511) 380 275 245 470 F15 350 390 305 340 101) 72D ?ardPH DESIGN SPEEC' 801) 281) 210 108 135 001) 350 2-BO 1135 170 401) 431) 320 240 210 20D 551) 400 330 270 100 015 445 338 295 90-MPH DESIGN 3PEED' 8OD 230 170 125 115 001) 291) 210 100 140 401) 365 270 AO 175 201) 451) 330 250 215 101) 505 370 275 240 TABLE 3-1 Source: Adapted from 2011 AAS HTO Green Book, Chapter 9, Section 9.7.3, Page 9-132, Table 9-23 USE DESIGN SPEED IF AVAILABLE, IF NOT USE LEGAL SPEED LIMIT. oaRoa�w� S�OLU51E --------- ---- CVE MOM3 U*7XUM X+i4LM DN" LQLI.iME m" Example: Two-lane highway with 40-MPH operating speed Opposing Volume (VPH) - 600 Advancing Volume (VPH) -440 Left-Tum Volume (VPH) - 44 or 10% of Advancing Volume With opposing volume (VPH) of 600 and 10 of advancing volume ('VPH) making left turns, and advancing 'Volume (VPH) of 305 or more will -warrant a left -turn lane_ 1Nhen the Average Running Speed on an existing facility is available, the corresponding Design Speed may be obtained from Appendix: A, Section A-1. Poo Road East has a speed limit of 35 mph at the entrance of Eco Village. The peak left turns into the site occur in the evening, with 12 left turns out of a total of 728 approaching vehicles (the additional tums generated by the site are included in the approach total). These tums make up less than 5% of the advancing volume. With an opposing volume of 325 vehicles, a left turn lane is warranted according to Figure 1 above. Figure 2. Warrant for right turn treatment (2-lane highvoy) I PHV APPROACH TOTAL, VEHICLES PER HOUR F-79 Appropriate Radius required at all Intersections and Entrances (Commercial or Private)_ LEGEND PHV - Peak Hour Volume (also Design Hou rly Volume equivalent) Adjustment for Right Turns For posted speeds at or under45 mph, PHV righttums > 40, and PHV total <- 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice_ When right tum facilities are warranted, see Figure 3-1 for design criteria_ FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Figures 2 above shoves that no right turn lane or taper is warranted for Eco Village. The morning is the peak hour volume approach total, with 720 vehicles approaching. OF those, approAmately 4 vehicles are estimated to turn right into the site. Figure 3. Ol1SS trip generator AM. peak hour Data Plot and Equation a0 60 40j 20! xx x t ------------------ -- - x 0 ------------------------ 0 - 20 40 X Study Site 60 SD 100 X = Number of Dwelling Units Reset Zoom Restore Fitted Curve - - - Average Rate X DATA STATISTICS Land Use: Multifamily Housing (Low -Rise) (220) Clickfor riore details Independent Variable: Dwelling Units Time Period: Weekday AM Peak Hour of Generator SettingfLocation: General Urban/Suburban Trip Type: Vehicle Number of Studies: 36 Avg. Num. of Dwelling Units: 161 Average Rate: 0.56 Range of Rates: 0.34 - 0.97 Standard Deviation: 0.15 Fitted Curve Equation: Lng) = 0.94 Ln(X) - 029 Rz: 0.91 Directional Distribution: 2a%entering, 72% exiting Calculated Trip Ends: Figure 4. OMSS trip generator P.M. peak hour Data Plot and Equation s0 60 w F- 40 20 01 X Study Site 0 20--------40- 60 so 100 X = Number of Dwelling Units Reset Zoom Restore Fitted Curve - - - Average Rate X DATA STATISTICS Land Use: Multifamily Housing (Low -Rise) (220) Clickfor more details Independent Variable: Dwelling Units Time Period: Weekday PM Peak Hour of Generator SettingfLocation: General UrbantSuburban Trip Type: Vehicle Number of Studies: 35 Avg. Num. of Dwelling Units: 146 Average Rate: 0.67 Range of Rates: 0.41 - 1.25 Standard Deviation: 0.14 Fitted Curve Equation: T=0.6&(X)-1.41 Rz: 0.94 Directional Distribution: 59% en teri ng, 41 % exitin g Calculated Trip Ends: