Loading...
HomeMy WebLinkAboutSDP202000013 Correspondence 2020-03-31COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ?434.293.3719 PH 434.293.2813 FX www.collins-engineering.com March 30, 2020 Mariah Gleason County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Foothill Crossing Phase V — SDP2020-00013 Dear Mariah: Thank you for your comments dated March 30, 2020. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: Planning: 1. The comments have been addressed as followed: a. The application name has been updated, as requested. b. The revision block has been updated, as requested. c. The date for the initial submittal has been updated, as requested. 2. The bar scales on all sheets have been checked and they are all accurate. 3. The comments have been addressed as followed: a. With the addition of the passive recreational area, the total recreational space provided is 37,950 SF, exceeding the 6,200 SF minimum. This information was also provided in the substitution letter for the recreational amenities. The cover sheet has also been updated with this information. b. This comment is inaccurate and an extremely stretched interpretation of the ordinance. This was never brought up during the initial site plan review, nor the original site plan review. Also, I have countless other projects with recreational facilities adjacent to SWM facilities and there was never an issue with those projects either. Some of these projects include Sunset Overlook and Avinity/Avinity Estates for starters. The fence that is proposed around the tot lot will also serve as protection from the swm facility. Based on grades, the SWM facility is not accessible from the tot lot. Finally, the SWM facility is a dry grass retention facility, which only holds water for a period of time (24 hrs after a storm event) and then drains out. This is not a wet pond facility that is a safety hazard. If this is still an issue, please let me know immediately and I will follow up with the planning director and zoning administrator. c. This comment is not appropriate. Creating a 10' fenced in pathway to the tot lot is not a good planning practice. However, we have changed the surface of the pathway to an asphalt walking path so that it will feel connected from the sidewalk to the tot lot area. We have shown the fencing for the tot lot area and the paved pathway, creating a demarcation line between the recreational area and access to the facility and the lots. If this is still an issue, please let me know immediately and I will follow up with the planning director and zoning administrator. d. The fence area has been adjusted on the plan and labeled. e. (1) additional climber has been added to the plans, and the detail added as well. f. We have already submitted the amenity substitution request for this project. Let me know if that was not approved. I will follow up with the planning director as necessary. 4. The comments have been addressed as followed: a. The parking lot landscaping requirements have been removed, as requested. b. The proposed passive recreational area has been removed from the landscaping calculations and from the total tree canopy calculations. c. The proposed and required street tree calculations have been updated. d. The plant legend has been updated to note 53 pin oaks. e. The total canopy coverage has been updated accordingly. f. Additional trees have been added to the development to meet the overall landscaping requirements. g. The conflict with the Nellie Stevens holly has been resolved. 5. The comments have been addressed as followed: a. Currently, the pedestrian pathway is extended to Glenbrook phase I along the right of way of the previously approved and platted right of way and the deed book and page has been noted. Ultimately, the area where the pathway is extended between this development and Glenbrook Phase I will be developed and replatted, and the greenway that was part of ZMA20160005 will be connected to this pathway through the by -right R-6 stream buffer area, which will be platted when this portion of the byright stream buffer is platted with the by -right development. The pedestrian pathway currently passes through the by -right R-6 land and not through the ZMA portion of the property. All pedestrian pathways will be inter -connected as the development is constructed and platted. At this time, we are providing the pedestrian and emergency connection to Glenbrook Phase I as shown on the plans. b. The pedestrian/bicycle label has been added to the pathway, as requested. c. Bollards have been included at both ends of the emergency access and pedestrian/bike pathway, as requested. The detail has been added to sheet 3. 6. A wall maintenance easement has been added across lots 1-10 for the retaining wall. 7. The approval letter from Claudius Crozet park for the connection to their asphalt pedestrian pathway that runs parallel to this roadway will submitted as soon as we received it. Based on section 14-422B, it would appear that this asphalt path would meet these circumstances and it can be approved by the agent in lieu of the Planning Commission. If this is not the case, please let me know immediately and I will follow up with the planning director about this matter. 8. The non-infill side yard setbacks have been added to the plan along with a separate line for the building separation. None of this changed the current design. 9. The impervious area on the cover sheet was updated to include the emergency access road, matching the SWM calculations. The imperious calculations already include the residential walkways and patios in the residences calculations and the accessways is included in the driveway calculations. These calculations have been approved by Engineering. 10. The building dimensions for a typical villa unit has been added to sheet 3. 11. The paving material detail has been added to sheet 9. 12. The (4) labels have been adjusted on the plans, as requested. 13. No, lighting will not be provided along the proposed primitive trailway. 14. Note 4 has been removed from the cover sheet, as requested. 15. Acknowledged. Letters will be provided to the county for the emergency accessway and the use of the Claudius Crozet park pathway. The offsite SWM easement will be platted with the subdivision plat. Engineering: 1. Acknowledged. WPO is under review for approval. 2. Acknowledged, the road plans have been resubmitted for approval. 3. The approved Foothills II improvements have been added, as requested. ACSA: 1. Acknowledged. The plans are ready for approval, once the Eastern Avenue utilities are dedicated. VDOT: The plans have been submitted to VDOT for approval. Building Inspections: 1. An easement has been added and shown/labeled on sheet 3. 2. This note has been added to sheet 1. 3. This note has been added to sheet 1. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE