HomeMy WebLinkAboutWPO201900060 Review Comments WPO VSMP 2020-04-01Phone (434) 296-5832 Project: Plan preparer: Owner or rep.: Plan received date: (Rev. 1) (Rev. 2) Date of comments: (Rev. 1) (Rev. 2) Reviewer: WP02019-00060 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit Plan review UVA Foundation — 1725 Discovery Drive Anna Fontaine /Timmons Group [ anna.fontainegtimmons.com ] 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 University of Virginia Foundation / P.O. Box 400218 Charlottesville, VA 22904-4218 [ cschooley(&uvafoundation.com ] 21 Oct 2019 13 Jan 2020 (digital-1/13/2020 3:55 PM) 30 Mar 2020 (digital) 20 Nov 2019 29 Jan 2020 1 Apr 2020 John Anderson Fax (434) 972-4126 County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied for reasons outlined, below. The application may be resubmitted for approval if all comment items are satisfactorily addressed. A. Stormwater Pollution Prevention Plan (SWPPP) (Rev. 1) Comments persist. Applicant response: `Much of this information is not yet available. An updated SWPPP will be provided with the next submittal.' Engineering accepts this response and anticipates update with next submittal. (Ref. Applicant email: 1/13/2020 3:55 PM) (Rev. 2) Comments persist. Defer revised SWPPP till future submittal (Applicant /county email: April 1, 2020 10:36 AM; 11:00 AM). The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. a. Sec. 1 (Registration Statement) Complete 2019 VPDES (VAR10) Registration b. Sec. 4./5. —Update once ESC-SWM plan sheet revisions complete c. Sec. 6.E. Name individual responsible for PPP practices d. Sec. 8 List named individual responsible for inspections e. Sec. 9 (Signed Certification) Please sign f. Sec. 11 (General Permit Copy) Please include 2019 VAR10 g. Include 2019 Notice of VPDES Termination h. List WP02019-00060 on cover of SWPPP The PPP content requirements can be found in County Code section 17-404. (Rev. 1) Comments persist; see above. 1. If Sec. 6 PPP Exhibit is revised, please provide an updated Exhibit. 2. Sec. 6.A Revise PPP Exhibits, p. 28-29 SWPPP, to show rain gauge locations. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Engineering Review Comments Page 2 of 10 1. 12. addressed; grayseal€ disapproved for reasons outlined, below. Note: Rev. 2 submittal includes substantial change to project scope. New Rev. 2 SWM Plan comments begin p. 5, with item 15. 1. Revise plan title to include ref. to VSMP /WPO2019-00060. 2. Revise vicinity map to more clearly identify site location. 3. C2.0 — Provide existing contour labels; none are provided. 4. Include image, below (or similar), from Timmons Group UVA Foundation —1725 Discovery Drive Design Calculations & Narrative, October 21, 2019, on C6.0 with caption /label that identifies 1725 Discovery Drive (blue eiFele, image bete,..; image removed w /Rev. 2 comments) to cross-reference and clearly identify project site, relative to Pond 1. S. Include image, below (image removed w /Rev. 2 comments) /similar: USGS 7.5' quadrangle, Earlysville VA, 2016, to show approximate (county -estimate) watershed Pond 1 comprising —465 Ac., on sheet C6.0. Revise drainage area reference on C6.0 which may underreport actual size of Pond 1 watershed (revise 83.90 Ac. reference to avoid confusion). 6. C6.0 — Provide note that identifies project location in sub -basin shown on Design Calculations & Narrative, P. 9. 7. C6.0 — Provide additional qualifying descriptions to support how this 0.73 Ac. impervious gain fits within p. 9 projections for sub -basin ultimate development impervious land cover without change to Exhibit CN value. Identify p. 9 sub -basin (Exhibit) CN value that applies to project, a value that WPO plan and Design Narrative maintain is unchanged with proposed development at 1725 Discovery Drive. 8. C6.1: Pre/post CN value =67 (reported with cross section 1 4 profiles) appears unrelated to Exhibit p. 9 CN values. Please clarify. Ref. image, below. Image removed w /Rev. 2 comments 9. Note: This and other development projects that rely on Pond 1 for quality and quantity compliance are not strictly grandfathered unless requirement at 9VAC25-870-48. L(iv.) is satisfied between individual project sites and Pond 1, yet, if (iv.) is true at Pond 1 outfall, and if Pond 1 was built per design, and if Applicant confirms that, to -date, watershed development impervious area does not increase the CN value in any sub - basin of Pond 1 (Ref. p. 9 /Design Report), then review position is that Pond 1 provides SWM for projects within Pond 1 watershed, per 9VAC5-870-48. Please confirm that this is the case: that CN value in project sub -basin is unchanged with new building /additional parking. Albemarle still considers channel and flood protection between proposed development and Pond 1. While Pond 1 may provide SWM quality -quantity control at limits of analysis, channel and flood protection between development sites and pond is a review and regulatory concern, unless proven otherwise. 9Vf AC25-870-48.1.(iv.): ` and iv has not been subsequently modified or amended in a manner resulting in an increase in the amount of phosphorus leaving each point of discharge, and such that there is no increase in the volume or rate of runoff.'] While there may be increase in the amount of phosphorus leaving a specific site compared with the pre -development condition, provided proposed design of 1725 Discovery Drive is consistent with Dewberry & Davis, October 1997 document CN value for its sub -basin, then review position is that there is no increase in permitted volume or rate of runoff from Pond 1 outfall. 10. C6.1: Channel Adequacy /capacity -velocity between 1725 Discovery Drive development, and Pond 1: a. Ref. 9VAC25-870-97: Stream channel erosion, para. B., references 9VAC25-840-40, Minimum Standards. b. Min Std. 19 (9VAC25-840-40.19.b.(2.)(a.) requires `Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks.' c. Ref. VESCH, 3rd Edit., 1992, Table 5-22. Provide additional data on receiving stream substrate. Compare with table values to ensure velocities at x-sections 1- 4 are non -erosive. Table 5-22 indicates velocities above 2.5 fps may be erosive in certain unlined earthen (natural) channels. Report /list observed substrate between development and Pond 1 at each x-section, on sheet C6.1. d. Ref. DEQ guidance /DCR Technical bulletin #1 (link: https://www.deq.vir2inia.2ov/Portals/0/DEQ/Water/Publications/TechBulletinl.pdf ) Stream Channel Erosion Policy Guidance. Review especially guidance, DCR TB 1, p. 11, Ultimate Development Conditions, and confirm analysis performed for (WPO2019-00060) submittal includes Engineer's best estimate of ultimate development along the receiving stream between 1725 Discovery Drive Engineering Review Comments Page 3 of 10 and Pond 1, which may in future contribute additional runoff, and increase volume or velocity in this receiving stream (blue circle, image, P). Image removed w /Rev. 2 comments. e. Once ultimate development conditions are analyzed, `If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall `consider measures listed at DCR TB I, p. 7. Also, please review DCR TB I, pp. 8-11. Revise design, as needed. f. Revise Water Quantity Analysis — Channel Adequacy text block, C6.1, as needed. Velocity < 5fps is not always nonerosive. Also, base design on ultimate development conditions. Please note multiple road stub -outs for future development along Discovery Drive (GIS image, above). g. Channel cross sections panel: i. Label Lewis and Clark Drive. ii. Label Ex. structure beneath L&C Drive. iii. Evaluate Ex. structure beneath L&C Drive based on ultimate development conditions. If inadequate to convey runoff from ultimate development, propose remedy. iv. If design remedy requires modification to Ex. structure beneath L&C Drive, provide comprehensive profile and plan design information, including LD-229. 11. Label drainage structures across plan sheets to correspond with Design Calculations & Narrative, Pipe and Inlct Computations tables. 12. Design Calculations & Narrative: Revise Project Narrative Stormwater Management Summary consistent with review comments above, and any plan or channel or pipe revisions required by ultimate development conditions. 13. Note: Since Pond 1 Drainage Area > 460 Ac., analysis downstream of Pond 1 is unnecessary. Project LOD < 1% Pond 1 DA. Project total LOD z1.29 Ac. Ref. DCR TB one -percent rule, p. TB1-7. (Rev. 1) As follow-up: Please see Sec. D., ESCP, below, minor item 1. (Rev. 2) Addressed. 14. Furnish relevant Pond 1 As -built data that corresponds with approved Pond 1 dam /spillway elevation data. Although this data was requested in connection with SUB201800171, unless mistaken, it was not furnished. As -built data for pond 1 dam /spillway is requisite to approval of WP0201900060. Please see request sent December 03, 2018 4:57 PM (J. Anderson to J. Showalter) in connection with SUB20180017 — Lewis and Clark Drive Extension, including text, reading (in part): (Rev. 1) Comment persists. (Rev. 2) Addressed. As follow-up: Revise title of Pond 1 Analysisport (a new submittal with Rev. 2) to reference WP0201900060). This is only request relative to As -built condition of Pond 1. Additional details request no revision. Pond 1 Analysis will be useful for current /future land development projects at UVA Research Park, for areas draining to Pond 1. Albemarle appreciates the effort and care taken to prepare this important reference resource. (Additional details: UVA RESEARCH PARK —POND I ANALYSIS, VSMP DESIGN CALCULATIONS & NARRATIVE, MARCH 27, 2020 a. Pam. 13 is a HydroCAD (routing) diagram that correlates: i. C6.0 Stormwater Narrative ii. Dewberry & Davis Oct 1997 document iii. C6.0 Image 2, Timmons Group Exhibit, Dec 2018 iv. 3127120 Discovery Drive Development Design Calculations and Narrative, p. 12 Exhibit (* Drainage Divides and Area Names taken from Dewberry & Davis, Oct 1997 report. ) v. Pond 1 As -built condition (schematic, below*; divides /area names, blue circle, below). Engineering Review Comments Page 4 of 10 POM 7 b. Pa. 5-10 are Dewberry & Davis Pond 1 design documents. c. Pa. 11-12 satisfy County request for `As -built' information for Pond 1 embankment. ( As -built drawings d. March 20, 2020 by Timmons Group, checked by Joe Medley ) ( As -built drawings incl. w/ 94-p. Pond 1 Analysis under PE -seal, 3/27/20 /Craig Kotarski) d. Remainder of 94-p. report are routings (2, 10, 100-yr routings, with pond WSE) e. Pg. 3-4, Pond outfall analysis: i p. 3) Pond Outfall Analysis The existing pond was originally designed to provide water quality and quantity storage with the use of an earthen embankment, and a concrete spillway. The asbuilt pond includes 2 9'x10' culverts, a concrete control structure, and an earthen emergency spillway. The asbuilt pond with the ultimate offsite drainage area and fully developed onsite drainage areas was analyzed using HydroCAD software to determine that the asbuilt pond meets or exceeds the freeboard of the original design. Below is a table comparing the design and asbuilt Water Surface Elevation (WSE), the freeboard provided, and the flow in and out of the facility. ( p. 4) outfall analysis, coat. Relevant pages from the approved design are provided in the appendix. The WSE can be found on page 9 of 60 and 32 of 60. The HEC-1 routing of the designed pond can be found in section S of the report. Also provided, is the survey dated March 20,2020 that was used to model the pond as it was constructed. Pond 1 was modeled utilizing the ultimate development offsite and post -developed conditions onsite drainage areas from the approved design report. Sub basins C1, C2, D1, D2, El, E2, Pl, F2, G1, and G2 drain to pond 1. The drainage area, CN Values, and time of concentration values are listed in the table below. f. Table 1: 1997Design* Top of Dam: 464.2 ft 2020Asbuilt Top of Dam: 467.0 ft 2 yr WSE 454.4 ft 456.6 ft 10 yr WSE 457.5 ft 458.3 ft 100 yr WSE 460.4 ft 460.6 ft 2 yr Freeboard 9.9 ft 10.4 ft 10 yr Freeboard 6.9 ft 8.7 ft 100 yr Freeboard 3.8 ft 6.4 ft 2 yr Peak Inflow 1483 cfs 1531 cfs 10 yr Peak Inflow 2472 cfs 2623 cfs 100 yr Peak Inflow 3708 cfs 4687 cfs 2 yr Peak Discharge 636 cfs 861 cfs 10 yr Peak Discharge 1483 cfs 1966 cfs 100 yr Peak Discharge 2437 cfs 3891 cfs Table 1 — Pond 1 Comparison * 1997 Design values were converted from meters to feet and m'Is to cfs g. Table 2: Approved Drainage Areas and CN Values 7/23/1997 Area (Ac.) CN Tc (min) Cl 27.38 80 5 C2 85.84 82 5 Dl 12.33 78 5 D2 84.03 86 7 El 27.8 81 6 E2 17.28 83 8 F1 66.44 91 11 F2 31.64 91 8 G1 48.9 92 14 G2 1 49.05 1 92 1 14 Table 2 — Drainage Areas to Pond 1 Engineering Review Comments Page 5 of 10 Alb. County Dec. 03, 2018 4:57 PM email / text: `Engineering needs to correlate Lewis & Clark Road Ext. to a prior -approved plan for TMP #32-6R, under whatever guise (Approved Master Plan, Approved Cox Engineering plans, Approved Dewberry Davis Study, etc.). Important documents are contemporaneous with suspended site plans, but we cannot locate a clearly -approved SWM plan for UVA Foundation Research Park, especially for ponds 1 and 2. Important documents and applications are twenty years old. This is the task: identify a prior -approved SWM plan (with SWM facilities) meeting Part IIC design criteria for improvements proposed under WPO201800073. We need Timmons to make the connection —please consider: 1. Identification of prior -approved stormwater management plans for ponds 1 and 2. I have researched this without luck. I cannot make clear connection between a prior -approval and this Application. It is not enough that recently approved WPO plans may have referenced Dewberry Davis Study, or Cox Engineering plans. 2. Design of ponds 1 and 2 relative to VSMH, 1999, Vol. II, Appendix 5D worksheets (ponds 1 and 2). 3. As -built condition of ponds 1 and 2 relative to approved plans. We cannot locate As -built drawings. 4. Location of ponds 1 and 2 relative to drainage divides, relative to improvements (WPO201800073). 5. USACE approval of wetland impacts associated with WPO201800073 /SUB201800171. 6. Cumulative development ( % impervious) relative to prior -approved SWM plan/s. That is, with WPO201800073, % impervious cover from a cumulative standpoint.' [Also, county email, James Howard -Smith to Jonathan Showalter, Timmons, 12/19/2018 7:07 AM. Re. SDP199800043 Approved Final Site Plan and Comps, Pond 1; sheet 32: Spillway / Dam Profiles. Note: plan is metric.] Link to SDP199800043: httr)s:Hlfweb.albemarle.ore/weblink/search.asnx?dbid=3&searchcommand=%7b%SbCDD Planning%5d: %5bApplicationNumber%5d=%22SDP 199800043%22%7d.] New (Rev. 2) C6.0 15. Narrative references Analysis Points 1 & 2. Cannot locate Point 2 in pre- /post -development DA images. 16. "Air building" is shown in post -development drainage area. Please confirm that 2.32 Ac. impervious area includes Air building. If not, recommend revise impervious area to include the Air building, and consider text edits, as needed, to Stormwater Narrative. 17. 3/27/20 UVA Research Park —Pond 1 Analysis Design Calculations & Narrative: Provide qualitative information on existing double 9 x 10 box culvert pond 1 outfall, relative to stream bed /channel stability. Although this is beyond limits of analysis, request is made in context of `As -built' condition. Albemarle Engineering Review Comments Page 6 of 10 must ensure As -built condition of pond 1 dam embankment /outfall is stable, on this date. Narrative, observational statement that stream bed and channel banks are stable at pond 1 outfall is sufficient. 18. Note: 3/27/20 UVA Foundation - Discovery Drive Development Design Calcs & Narrative,.33, para. 3 states: "Drainage Area C2 consists of 83.90 ac. with a CN value of 67 (see Table 1)". Table 1,.55, reports CN =69. Revise for consistency. 19. C6.1: Confirm pipe capacity (LD-229) between Str. 300 and inlet, S side of Discovery Drive, is adequate to convey runoff from (conservative estimate of) impervious areas associated with potential air building. A goal discussed 3/6 with Applicant is an approved plan that addresses SWM quality /quantity requirements (if not ESC) associated with a potential air building; this plan comes quite close. Also, ESC Plan, item 13. 20. C6.3: If WPO201900060 is to include potential air building, include inset for air building on site drainage area Map 2 that shows DA parameters and location of air building, relative to Phase 2 improvements. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for lidreasons listed, below (two minor- items'. The erosion control plan content requirements can be found in County Code section 17-402. After- r-or-evised ESC Plan, tfninor-:tows 'ea + (Note: hiitima4-review comments addressed; grayscale): 1. C3.0 total LOD Area (appears) =1.31 Ac. Please revise. (Check my math.) (Rev. 2) Partially addressed. As follow-up: see New item 8, below. 2. C3.1 Check for CE-SF conflict; it appears SF may partially obstruct CE. Limit SF to avoid conflict (Rev. 2) Addressed. 1. C3.0 - Since LOD areas of this two-phase project (building; parking) do not overlap, revise project description to clarify that total limits of disturbance z1.29 Ac. 2. C3.1 - Provide RWD at end paved construction entrance. 3. C3.3 - Label existing contours. 4. C3.4 (Also, site plan -related) a. Eliminate nuisance ponding in right-angle corners of lower elevations of proposed upper parking lot. b. Label CG-2 / CG-6. c. Label drive aisle width. d. Provide typ. dimensions, parking spaces. e. Label concrete ribbon curb at each entrance to upper parking lot. Provide detail. f. Recommend profile for north and south side entrances to proposed upper parking lot that show smooth transitions, and spot elevations. g. Recommend receiving walks on east side of existing lower parking lot that align with proposed sidewalks (2 locations) on west side of lower parking lot. h. Label retaining wall. i. Please ref. 18-30.7.5.a. L/2. construction standards, re. wall ht.; stepped walls required if wall ht. >6' (proposed design wall ht. -10.3' on managed steep slopes cannot be approved.) Image removed with Rev. 2 comments. j. Apply for building permit for retaining wall. k. WPO plan approval does not approve retaining walls. 1. Provide CG-12 wherever walks encounter curbing (label ramps). 5. Provide safety fence to protect building occupants and visitors during all phases of project. New (Rev. 2: Scope of work revised /discussed with Timmons, Albemarle Planning /Engineering, and UVAF at meeting at county office building, 3/6/20.) 6. C3.5: Recommend label sediment traps as ST1, ST2 (excavated drop inlet ST) in plan view. Engineering Review Comments Page 7 of 10 7. It appears excavated drop inlet sediment trap does not provide 100.5 cy wet storage volume. If top of inlet elev.=540.5' and volume provided at elevation 541'=94.2cy, it appears wet storage volume is insufficient. 8. Please confirm total LOD z4.10 Ac (C3.0, Project Description). Phase 2 (2.54 Ac.), Phase 1 (0.47 Ac.). If "Air building" comprises —1.09 Ac. disturbance, then on C3.0, please reference possible location of "Air building" shown on C6.0, C6.1. 9. Include Ex. pipe /structure demolition in sequence of construction notes. Ensure storm runoff conveyance via existing or new storm lines (structures) is continuous during all phases of construction (C2.4 /C3.0). 10. C3.5: Provide proposed grading and/or label to ensure ST1 discharge is to the new inlet structure located just SW of ST1 weir. The following comments also relate to site improvements. Please ensure final site plan (SDP2020-00009) and WPO plan are consistent 11. C2.1, C5.0: Provide CG-12 at each end of the short sheltering short walk between new access to metal building and existing parking, 1725 Discovery Drive (blue circles, below). Also, provide CG-12 ramp within 1725 site to receive middle ramp pedestrian traffic (image rt., below). I + 2J9A r o s necrauous j y ID + r r — r + / 545.23' / rI)WA ECIOUOUS w / PROXIMf INEEASE F I SEE OB 200 _ •bEcrouous i -- ----- r - 5V,4 ' ' APPROXIMA7 J_ 1 __- '_ , WATER LINE EASE& SEE DB 2085 INSERTATEE r� I 1 O 312 OF \ 8 \� COMM. i PULL�2 10'HI ® � � r � I � OONMSPOUT / FIBEROPTICO 12. C5.0: Check LD-229, Narrative & Design Calc, p. 7 (pipe 315), against plan sheet labels, pipe 315, to /from. 13. C5.0, C5.1: Label all existing structures (listed on the LD-229) in plan view drawings; image, below. Engineering Review Comments Page 8 of 10 LD-229 STORM SEWER DESIGN COMPUTAT STORM FREQUENCY 10 PIPE NO. FROM POINT TO PO REFERENCE (1) STA. REFERENCE 2) 300 TO EX 300 EXI. 301 302 300 303 1304 1302 307 308 306 309 310 305 311 312 300 313 TRENCH 312 316 EX2 400 TO EX 400 EXIST Ex 24 CPP 306 304 EX TO 306 EX 306 EX2-EX7 EX2 EX7 EX7-EXI EX7 EXI O LL EXl OUTFALL 14. LD-229 lists Ex 7 — Ex 1 at 99.46% pipe capacity. Recommend more conservative design. 15. C5.2: Provide Swale /similar and label/s at top of retaining wall to ensure storm runoff is not channelized at the top of the wall, but is separated by Swale or grading from the top of the wall. 16. C5.1: Assign storm line label to 10" HDPE line N of Str. 310. Provide a structure at bend in this line. Assign Str. ID. 17. C5.1, C7.0: Revise storm 309 grade to < 16%. 18. Increase pipe 309 diameter > 10" (upstream pipe: 10" DIA HDPE; Str. 309: 11.1 F of 8" HDPE @ 19.80%). 19. C5.1: "10" HDPE (1% slope min.)" label is ambiguous. Provide profile. Defines pipe /slope. Also, item 17, above. 20. C5.1: Provide grading at Str. 316 to accommodate 13.464" ponding depth at inlet to ensure capture (ref. LD-204). 21. C5.1: Revise throat length, inlet 400. 6.114" depth appears to exceed DI-3C 5.5" high inlet opening. KEYED CONST. BARS D se, APPROACH JOINT f GUTTER BAR G WARPED �0 - GUTTER BAR C 2„ I SUBBASE HARDWARE - CLOTH + �S F 1 WEEP HOLE. 0 1 SEE NOTE 8 STEPS.'SE NOTE 5 4- SECTION A -A 22. Provide details /notes, etc. for T-connections in storm lines (similar to inlet shaping) to ensure flow at Inserta tees ® is not susceptible to debris accumulation, or obstruction. Inlet shaping is required within structures to re -direct flow to minimize chance of accumulation, or obstruction. Engineering Review Comments Page 9 of 10 C7.0: 23. Note that concrete inlet shaping (IS-1) is to be provided on all structures may not be possible with Nyloplast line of dome grate /risers. Clarify IS-1 is possible for Str. 310. Also, item 22, above. 24. Provide Ex. 24" (CPP) storm profile from Str. 300 (beneath Discovery Drive) to inlet structure on S side of Discover Drive. 25. Plan note stating that MH Str. over 8-ft in height shall require a stepdown structure with )/2 steel plate to serve as a safety slab appears more stringent than VDOT standard. Please confirm design intent to equip all MH Str. over 8-ft. in height with SL-1. Ref. VDOT SL-1 Std., below. BARS Q 8" C-C TYP. I I I I I Ill_I A IIIII I A 30" DIAMETER I •.; I I I I I I I� � ��: STRUCTURE SIZE AND PLAN WALL THICKNESS VARE A3 CONCRETE .. SECTION A -A NOTES: 1. THE STANDARD SAFETY SLAB (SL-1)IS TO BE USED ONLY WHEN SPECIFIED IN THE PLANS ON THE DRAINAGE SUMMARY SHEET AND/OR THE DRAINAGE DESCRIPTION. FOR MANHOLES, JUNCTION BOXES. AND DROP INLETS WITH HEIGHTS GREATER THAN 12 FEET, THE SPACING OF ADJACENT SAFETY SLABS SHALL BE B'TO 12'WITH NO SAFETY SLAB LOCATED WITHIN 6 FEET OF THE TOP OR BOTTOM OF THE STRUCTURE. SAFETY SLABS SHALL NOT BE LOCATED BELOW ANY INLET PIPE OF 30" DIAMETER OR GREATER. 2, THE COST OF THE SL-1 IS INCLUDED IN THE COST OF THE STRUCTURE. 3. ACCESS OPENINGS ARE TO BE STAGGERED FROM ONE SIDE OF STRUCTURE TO THE OTHER WHERE APPLICABLE. STEPS ARE TO BE STAGGERED ACCORDINGLY. 4. SAFETY SLAB MAY BE CAST -IN -PLACE OR PRECAST. CAST -IN -PLACE CONCRETE TO BE CLASS A3 (3000 PSI). PRECAST CONCRETE IS TO BE A4 (4000 PSI). REINFORCING STEEL TO BE IN ACCORDANCE WITH AASHTO M31. 5. ACCESS OPENINGS MAY BE 30" DIAMETER OR 30" SQUARE. WHEN STRUCTURE WIDTH IS LESS THAN 30" THE ACCESS OPENING SHALL BE RECTANGULAR (STRUCTURE WIDTH BY 30" LONG). The VSMP permit application and all plans may be resubmitted for approval when all comments have been addressed. . Given Covid-19 restrictive policy on meeting Applicants, for the time being Engineering review staff is unable to meet to discuss this review, but recent productive on-line review meeting with Timmons staff (Andrew Allision) was a collaboration that might work in this instance, if preview prior to submittal is requested. Engineering Review Comments Page 10 of 10 Process After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements may also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are is complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application (SWPPP Registration Statement). DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, the County can hold a pre -construction conference. Applicants will need to complete the request using a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.ora/deptfonns.asp?department=cdenMUoo Ifyou have questions or concerns, please contact me atjanderson2nalbemarle.org or at 434.296-5832 - x3069. Thank you I Anderson, Engineering Div. WP0201900060 UVA Foundation — 1725 Discovery Drive 040120rev2